Resolved that the recommendation be approved and that in respect of the elevational treatment of the car park (Application no. 08F/2809) samples of the cladding material proposed shall be assembled on site for inspection by the Planning Committee prior to the construction of the car park commencing and accordingly the following additional condition should be added: “In so far as this approval relates to the elevational treatment of the car park, samples of the cladding material being proposed, shall be assembled on site for the inspection and approval of the Planning Committee prior to the construction of the car park hereby permitted commencing. REASON: To ensure a satisfactory appearance in accordance with Liverpool Unitary Development Plan Policy HD18 General Design Requirements.” and that as a consequence existing condition no. 3 should be amended to read as follows: “3. Before any construction commences, samples of all materials to be used in the areas of public realm, shall be submitted to and approved in writing by the local planning authority. The scheme shall be implemented in accordance with the approved details before the development is occupied/brought into use. REASON: To ensure a satisfactory appearance in accordance with Liverpool Unitary Development Plan Policy HD18 General Design Requirements.”
Word for word from the decision Liverpool published for this meeting.Source: councillors.liverpool.gov.uk
Report to Planning Committee 2010/21 old, 30 pages
Item 12
Ward: Riverside
Land bounded by Heathfield Street, Back Bold Street and Site: Nos. 48-60 Renshaw Street, Liverpool 1
To erect an eleven storey building comprising ground floor commercial/ retailing (including the following Use Classes, Proposal: A1, A2, A3, A4, A5 and B1)and multi-storey car park above with new public realm/landscaping and associated works.
Applicant: CRLP
Application No.: 08F/2809 Date Valid: 06/01/2009 City Centre D.C. Team:
Recommendation: Approve with Conditions
Case Officer Report
Site Description
This report concerns proposals to develop two sites within the ‘development area’ now known as Central Village. Planning approval was granted initially in 2006 for a comprehensive redevelopment scheme. Bounded by Cropper Street to the east, Back Bold Street to the west, and Central Station to the north, this triangular site is divided only by Newington and Heathfield Street footbridge.
The development area lies within a rock cutting approximately 5 to 8 metres below street level. The cutting is faced with stone masonry where the Victorian station existed, the station, platforms and tracks having subsequently been relocated some several metres below the site. Three tunnels run beneath the site of which two are passenger tunnels (Loop Line and Northern Line) and the other being a ventilation tunnel. The site is currently used as an NCP car park to the north, with a Network Rail Maintenance Depot to the south. The current station building forms the short side of this triangular site. High stone walls obscure the other sides from general view. Access is gained via a vehicular ramp from Cropper Street and serves the public car park, Central Station and the depot. There is no direct access to the site, either pedestrian or vehicular, at street level. The present hidden nature of the site means that the vast empty space is barely perceived, despite its proximity to the neighbouring shopping streets, Lewis’s department store and the Adelphi Hotel. The site lies alongside (but outside of) the Duke Street Conservation Area and though not within the World Heritage Site, the site is within the WHS buffer zone.
-1- The Proposal
The development proposed comprises two separate applications and whilst separate recommendations will be made in respect of each of these applications, for the sake of clarity they are assessed within the one planning report. The applications comprise the following:
08F/2809 – An application to erect an eleven storey building comprising ground floor commercial/retailing and a 477 space multi-storey car park above, with new public realm/landscaping and associated works. This application relates to site C of the Central Village development area. This site is located towards the southern end of the triangular site. Contextually site C is enclosed on three sides by Back Bold Street, the Heathfield Street footbridge and the back of Rapid’s premises at nos. 48-60 Renshaw Street properties. Site C currently houses part of Network Rail’s Maintenance Depot, which includes portacabin style offices, outside storage and associated vehicular parking. The proposed vehicular entrance/exit to the car park is taken off Heathfield Street.
09F/0105 – An application to erect a ten storey building comprising a 240 bedroom hotel (C1) with ancillary bar and restaurant and ground floor retailing, with 49 basement car parking spaces, including new public realm/landscaping and associated works. This application relates to site B of the Central Village development area. Contextually site B is bounded by Back Bold Street, the Heathfield Street footbridge, Cropper Street and Newington. Site B currently houses part of Network Rail’s Maintenance Depot, including a 2 storey office building, outside storage and associated vehicular parking.
As well as drawings the following documents have been submitted in support of the applications as follows:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.