Resolved
Resolved that the recommendation be approved.
Planning Committee 2010/21 old approved this item on Tuesday 15 September 2009. Below is the council's own wording, with the papers it was decided on.
Resolved
Resolved that the recommendation be approved.
Item 4
Ward: Speke-Garston
Land adjacent to Stalbridge Dock, Dock Road, Garston Site: Liverpool, L19 To construct Resource Recovery Park (RRP) to deal with up to 150,000 tonnes of domestic and commercial waste, to erect waste processing building (max height 15m), 1 no. Proposal: sprinkler tank, external plant, ancillary site buildings, weighbridges, balancing pond and layout associated parking, servicing and landscaping.
Applicant: Jack Allen Holdings Ltd
Application No.: 09F/1012 Date Valid: 03/07/2009 City South D.C. Team:
Recommendation: Refuse
Case Officer Report
Application Site
The application site consists of a triangular, primarily vacant, piece of land occupied a small dry bulk warehouse although the majority of the site is overgrown having formerly been occupied by railway lines that have been dismantled. The site is off Dock Road, Garston within private land that is owned and operated by Associated British Ports (ABP). To the north of the site is the rail freight terminal, adjacent to Garston Way, and to the south is a fertilizer warehouse, which forms part of the Port development. The land to the west is also port land with the dismantled railway to the west (known as Dingle Bank) currently vacant.
The site is allocated as Port within the adopted Unitary Development Plan (2002) along with land to the south and west. Land to the east (Dingle Bank) is allocated as a site for various types of development, specifically B1 (business), B2 (general industry), B8 (storage and distribution) and C3 (residential).The freight terminal is allocated as a Primarily Industrial Area.
Land levels vary across the site from east to west and north to south, falling away towards the south east corner towards the dock. Dingle Bank to the east, which is highly vegetated, creates a high level mound and the also land rises abruptly to the west and as such is not visible from Dock Road. Application Description
The application proposes a resource recovery park to treat and recycle waste by the use of autoclaves and mechanical sorting with a throughput of 150,000 tonnes of commercial and domestic waste per annum. It is proposed that the site would be operational 24 hours a day, 6 days a week with the transportation of materials by road to and from the site occurring between 7am and 6pm Mondays to Saturdays.
The site can be described in terms of 3 elements: • The main building to house the following: o Waste reception hall where waste is unloaded o Two autoclaves for the treatment and recycling of waste o Recyclate sorting area o Boilers and ancillary equipment • Annexe building to accommodate: o Ancillary offices and staff facilities o A visitors office and education centre • The following external elements: o Weighbridges o Service yard for incoming waste o Balancing pond to capture surface water (i.e. rain water) o Landscaping/ boundary treatment o Internal vehicular access and parking provision
It is proposed that there would not be any outdoor storage of waste and all unloading of incoming material would occur within the facility. It is stated that recyclates would we transported off site by boat and rail, using existing infrastructure, with residual material (accounting for approximately 20 percent of the end product) transported by road.
The building could be described as ‘L-shaped’ in terms its layout, with its longest element running parallel to the eastern boundary although it would be 15 metres away at its closest point. All servicing would occur to the north, adjacent to the freight terminal.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Land at Stalbridge Dock, Dock Road, Liverpool 19 (Speke-Garston Ward)Report | 25 pages | DownloadRead as text |
PDF |
stalbridge dockReport | 1 pages | Download |
Follow Planning Committee 2010/21 old at Liverpool and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 16 Jun 2020 | Minutes of the Last MeetingResolved that the minutes of the Virtual Meeting of 2 June 2020 be approved. | Approved | Open |
| 2 Jun 2020 | Minutes of the Last MeetingResolved that the minutes of the Virtual Meeting of 26 May 2020 be approved. | Approved | Open |
| 26 May 2020 | Minutes of the Last Virtual MeetingsResolved that the minutes of the Virtual Meetings of 5 and 12 May 2020 be approved. | Approved | Open |
| 31 Mar 2020 | Minutes of the Last MeetingAgreed that the minutes of the last meeting held on 10 March 2020 be approved. | Agreed | Open |
| 10 Mar 2020 | Minutes of the Last Meeting 18 February 2020Resolved that the minutes of the last meeting held on 18 February 2020 be approved. | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.