Highways and Public Spaces Representation Committee 2020/21 deferred this item on Monday 15 February 2010. Below is the council's own wording, with the papers it was decided on.
Resolved that consideration of this matter be deferred to enable the Highways Manager to undertake a speed count of traffic at each road within the proposed scheme boundary, over a period of four weeks and at staggered times, the results to be reported back to a future meeting at which point the Committee shall further hear representations and thereafter determine the application.
Word for word from the decision Liverpool published for this meeting.Source: councillors.liverpool.gov.uk
Report to Highways and Public Spaces Representation Committee 2020/21, 14 pages
Background
1.1A traffic calming scheme for the Bryanston Road area, St Michaels, was identified from the 2009/10 Traffic Calming Priority List, and included in the City Councils 2009/10 Area Based Grant funded road safety programme.
1.2The traffic calming priority list focuses primarily on vulnerable road users (pedestrians and cyclists) to which traffic calming schemes have the greatest benefit in terms of reduced vehicle speeds and discouraging residential roads from being used as short cuts by through traffic.
-1- 1.3 The Bryanston Road area was initially identified due to the number of road traffic collisions involving pedestrians and cyclists that had occurred in the area. This area met the City Council’s traffic calming criteria which prioritises areas for treatment based on the pedestrian and cyclist collision rate per 10,000 population with those areas with the highest collision rate having the highest priority.
1.4The area to be treated with traffic calming measures is bounded by Aigburth Road, Colebrooke Road, Buckland Street, Southwood Road, St Michaels Road and St Michaels Church Road.
1.5The traffic measures that are proposed to be introduced in this area are 4.7m long road humps and 10.25m long speed tables. Both these measures are 75mm in height.
2.0Consultations
2.1The views of Ward Members, the Emergency Services, Merseytravel and other key stakeholders were sought via a letter which was sent out on 21st August 2009. Local residents / businesses were also consulted through a leaflet drop on 28th August 2009. This leaflet included a plan showing the proposed scheme as well as giving the locations of all of the proposed traffic calming measures.
2.2There were 1420 questionnaires sent out to residents and businesses in the area, of which 268 (19%) were returned.
2.3It was brought to the City Council’s attention at the end of November 2009 that residents in Buckland Street did not receive the initial consultation material for the proposed scheme. In view of this consultation documents were delivered to all residents in Buckland Street on the 1st December 2009.
2.4The results of the residents’ consultation were that 194 residents (72%) were in favour, 48 residents’ (18%) were against the proposals and 27 residents did not voice an opinion. We received 2 responses from Buckland Street, 1 in favour of the scheme and 1 against the proposals.
3.0Legal Orders
3.1The legal orders were published in the Liverpool Daily Post, and erected on lighting columns throughout the area, detailing the proposed location of the road humps and 20mph Order and the procedure to follow if anyone wished to object.
The date of the advertisement was:-
• First Composite Press Notice – Tuesday 27th November 2009
-2- At this point site notices were erected on lighting columns in the area affected and th displayed for a period of 28 days. The objection period ended on the 25 December 2009.
3.2Due to residents in Buckland Street not receiving the consultation documents until st the 1 December 2009, the legal advertisement period for this scheme was th extended until the 15 January 2010 in order to give sufficient time for residents to submit their comments or objection. This gave residents 7 weeks to submit their comments or objection to the proposed measures. The normal time period for the legal orders consultation period is 4 weeks.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Highways and Public Spaces Representation Committee 2020/21 at Liverpool and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.