Agreed that – (i) undertake a review of the signage within Areas, 6, 1 and 4, with a view to carrying out improvements where required. Then carry out further speed surveys to see whether there has been any change; (ii) continue with the 20mph speed limit scheme on residential roads originally omitted from the scheme; (iii) consider introducing 20mph speed limits on other roads and routes, including the city centre and pedestrian zones; (iv) look at the feasibility of making the existing 20mph advisory speed limits outside of schools mandatory to enable them to be enforced; and (v) develop a further communications and marketing strategy and agree the format and timescale for when this will commence. M/51
Word for word from the decision Liverpool published for this meeting.Source: councillors.liverpool.gov.uk
Report to Key Officer Decisions (Key DARS), 13 pages
CABINET
CITY PUBLIC UPDATED 23 APRIL 2020 RH/18
Cabinet Member: Cabinet Member for Regeneration & Highways
Director: Regeneration & Economic Development
Report Title: 20mph Speed Limit Scheme Update
Date: Report No: 24 April 2020 EDR/39/19
Decision Type: Key Decision
Executive Summary: The purpose of this report is to inform Cabinet of the effect of the policy to introduce 20mph speed limits, using signs only, on residential roads across the city, in terms of its impact on road traffic collisions and vehicle speeds. This policy was approved by Cabinet at the meeting of the 4th November 2011 (Report No. R&T/17).
The report also seeks approval for a number of recommendations relating to this policy and continuing drive to reduce collisions and vehicle speeds on the city’s network.
Background: The aim of the “20mph speed limit” scheme was to reduce traffic speeds on the city’s residential road network, with the intended consequences of also reducing the frequency and severity of road traffic collisions.
It was considered that this approach could potentially result in a total reduction of 54 collisions a year in the areas where a 20mph speed limit was introduced. In turn, this would present a saving to society from the prevention of these collisions of over £5.2M per year (based on the average cost of road traffic collisions at that time).
V1.1/060919 – 170919 onwards To ensure a consistent city-wide approach, it was determined to include as many roads as possible, with the exception of – roads with existing speed limits of 40mph or more; the strategic road network (i.e. A and B roads); and major through-routes which are not primarily residential in nature.
A budget of £1.65M was allocated for the project, spread over 4 years from 2011/12 to 2014/15 financial years. This was made up of £1.0M from the Local Safety Scheme allocation from the Transportation Capital Programme, and £0.65M from the Primary Care Trust (PCT), of which £0.4M was included within the Transportation Capital Programme, with the remaining £0.25M being a revenue grant to be used on public engagement.
Area-Based Approach: From the outset, it was identified that to introduce the scheme on a city-wide basis in a practical and logical manner, and within a finite timescale, an “area- based approach” would need to be adopted. The city was subsequently divided into 7 distinct areas to assist with this methodology (Appendix one).
Within each area the individual roads were assessed on a case-by-case basis, with careful consideration being given to the nature and use of each of the roads. These areas were then prioritised for action based on their collision record between 2008 and 2010, in descending order from highest to lowest. (Table 1). Table 1 – Prioritised list for introduction
Area Year for delivery
Area 6 2012/13 Area 7 2012/13 Area 1 2012/13 Area 2 2013/14 Area 5 2013/14 Area 4 2014/15 Area 3 2014/15
It was also identified that as the scheme was to be rolled out on such a large scale it would be beneficial for a Communications and Community Engagement consultancy to be procured, as they would have the appropriate resources and experience at their disposal to deliver this important aspect of the project. The city council commissioned a local company, to fulfil this important role on their behalf.
The consultancy created a brand for the scheme called ‘The 20effect’. This brand was then featured on all of the marketing materials and also became the name of the dedicated website for the community engagement element of the scheme. It was considered an essential part of the whole project to help promote its aims and benefits, and to harness community engagement and ownership.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.