CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Maidstone Borough Council

Report of the Assistant Director of Environmental Services - Building Control Charges

Decided Committee 2 papers

Economic Development and Transport (Cttee) decided this item on Thursday 18 March 2010. Below is the council's own wording, with the papers it was decided on.

Item1

Resolved

That Tables 1 & 2 of the Building Control Charges relating to new houses and domestic extensions (as set out in Appendx A to the report of the Assistant Director of Environmental Services) be increased by 1%. 2. That Table 3 of the Building Control charges (as set out in Appendx A to the report of the Assistant Director of Environmental Services) be changed to more closely reflect actual costs and the current market conditions. 3. That the charge for using the Council’s consultants to sign off Part P (Domestic Electrics) be increased to reflect the cost of this service to the Council.
Word for word from the decision Maidstone published for this meeting. Source: meetings.maidstone.gov.uk

Follow this further

Built from Maidstone's papers

What the report saysPro

Report to Economic Development and Transport (Cttee)

Appendices

A Guide to Fees for Building Control

Page | 3 This page intentionally blank

Page | 4 1.0 Introduction

1.1This model has been prepared following increases to salaries and running costs from 2009/10.

1.2The 1% increase is based on the current inflation rate and the increases to expenditure in the Trading Account.

1.3The basis for this model is the Building (Local Authority Charges) Regulations 1998.

1.4All charges in this model exclude VAT

2.0Charges will be set for the functions prescribed in Regulation 4 of the Building (Local Authority Charges) Regulations 1998 namely: -

2.1A plan charge, payable when plans of the building work are deposited with the Authority.

2.2An inspection charge, payable on demand after the Authority carry out the first inspection in respect of which the charge is payable.

2.3A building notice charge, payable when the building notice is given to the Local Authority.

2.4A reversion charge, payable on the first occasion o which those plans are deposited for building work in relation to a building:-

1. Which has been substantially completed before plans are first deposited with the Authority in accordance with Regulation 20 of the Approved Inspectors Regulations, or

2. In respect of which plans for further building work have been deposited with the Authority in accordance with Regulation 20 of the Approved Inspectors Regulations,

2.5A regularisation charge, which is payable at the time of the application to the Authority in accordance with Regulation 21 of the Building Regulations for work carried out on or after the 11th November 1985.

3.0You are advised that: -

3.1The sum of the plan charge and the inspection charge will be equal to the building notice charge.

3.2The reversion charge shall be equal to the building notice charge.

Page | 5 3.3 The regularisation charge shall be 20% greater than the building notice charge but that VAT is not payable. 3.4 Any charge, except the regularisation charge, which is payable to the Authority shall be subject to value added tax at the standard rate.

3.5Where the charge is based on an estimated cost of work and the estimated cost is below £5,000 a separate inspection charge is not payable.

3.6Where the charge is for the erection of a detached building which consists of a garage or carport or both having a floor area not exceeding 40m² in total and intended to be used in common with an existing building, and which is not an exempt building the inspection charge is payable as a single stage payment at the time of plan deposit. Details of buildings, which are exempt, are contained within Schedule 2 of the Building Regulations.

3.7Where the single or aggregate floor areas of domestic extensions and/or loft conversions exceed 60m², then the charge is based on the estimated cost of the works under Table 3. The minimum charge is as per Category 8 of Table 2.

3.8Where a Full Plans submission is made for work that involves the erection of an extension and a loft conversion with aggregate floor area under 60m², then the plans fee shall be taken from Categories 6 or 7 of Table 2.

3.9See also paragraph 11.0 (Part P Stage 2 fees)

4.0Charges are not payable in respect of work which is carried out for the benefit of a disabled person in accordance with Regulation 9 of the Building (Local Authority Charges) Regulations 1998 which states that:

4.1"A local authority is not authorised to fix by means of a scheme and recover a charge-

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
BuildControlFees Model 1st April 2010Report 2.8 MB DownloadRead as text
PDF
Report of the Assistant Director of Environmental Services: Building Control ChargesReport 66 KB Download

At this meeting

Whole meeting
1Report of the Assistant Director of Environmental Services - Building Control ChargesThis decision

On this subject at Maidstone

Search all
  1. Report of the Assistant Director of Environmental Services - Building Control ChargesThis decision
  2. Report of Assistant Director of Development and Community Strategy - Maidstone Town Centre: Policy Directions for the Core StrategyAgreed
  3. Report of the Assistant Director of Environmental Services - Street Cleansing ReviewAgreed
  4. Report of the Assistant Director of Customer Services and Partnerships - Working With Children PoliciesApproved
  5. Report of the Assistant Director of Customer Services - Review of Fees and Charges for Maidstone Market at Lockmeadow 2010/11Agreed
  6. Report of the Assistant Director of Development and Community Services - Network Rail - Kent Route Utilisation StrategyApproved

More from Maidstone Economic Development and Transport (Cttee)

All decisions
MeetingDecisionOutcome
25 Mar 2011 Private Sector Housing - HMO licence fees and conditionsThat the level of fee charged for a House In Multiple Occupation be agreed at an increased level of £350 for landlord... Agreed Open
11 Feb 2011 Boxley Warren Local Nature Reserve (LNR) ByelawsThat the byelaws for the Boxley Warren Local Nature Reserve (LNR), as set out in Appendix A of the report of the Head... Approved Open
21 Jan 2011 Proposed Increase in Rents on Gypsy SitesThat the rent for the council owned gypsy sites be increased by 3.1% as set out below to commence from April 2011. Cu... Decided Open
14 Jan 2011 Response to the Consultation on the Future of Social HousingThat the response to the consultation as set out in Appendix B to the reference from the Strategic Housing Advisory C... Agreed Open
1 Apr 2010 Report of Assistant Director of Development and Community Strategy - Maidstone Town Centre: Policy Directions for the Core StrategyThat the following matters be agreed as the basis of the Core Strategy policy for the Town Centre; a. The town centre... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies