RESOLVED that the application be APPROVED subject to the following conditions: 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2 The development hereby permitted shall be carried out in complete accordance with the approved drawings specifically referenced on this decision notice. 3 The external surfaces and fenestration of the development hereby approved shall be constructed of materials and finish as detailed within the application form and retained as such thereafter . 4 The measures for securing the resilience of the development against the effects of a flood event contained within the Flood Resilience and Resistance Statement which was submitted as part of the planning application and forms part of this permission, shall be fully implemented and put in place prior to the first use of the development and retained as such thereafter. POSITIVE AND PROACTIVE STATEMENT Town and Country Planning (Development Management Procedure) (England) Order 2015 - Positive and Proactive Statement: The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework.
Word for word from the decision Maldon published for this meeting.Source: democracy.maldon.gov.uk
APPROVE subject to the conditions (as detailed in Section 8 of this report).
2. SITE MAP
Please see overleaf.
Agenda Item no. 10 Page 1 / 8 Our Vision: Working in Partnership to make the Maldon District a better place to live, work and enjoy Agenda Item no. 10 Page 2 / 8 3. SUMMARY
3.1Proposal / brief overview, including any relevant background information
3.1.1 The application site lies within the settlement boundary of Maldon, located within the Blackwater Retail Park and is occupied by a single-storey commercial building used as a Use Class A3 unit (McDonalds). The unit is situated approximately 100 metres away from a grade II listed building, Old Ironworks, opposite a supermarket, Tesco, with petrol station and adjacent to an office building, Trafalgar House. Soft landscaping surrounds the site mainly to the rear where it is banking the Maldon Bypass (A414).
3.1.2 Planning permission is sought for the reconfiguration of the drive thru lane to provide a side-by-side order point, incorporating a new island for signage, reconfigured kerb lines and two Customer Order Displays (CODS) with associated canopies, the construction of three extensions and the enlargement of the existing bin store.
3.1.3 The proposed CODs would have a maximum height of 3m and would measure 0.6m wide by 0.3m deep. The approximately triangular-shaped canopies above the CODs would have a maximum width of 2.4m and a maximum depth of 3.5m. The canopy would be made of glass reinforced plastic (GRP) and would stand on a steel structure.
3.1.4 The proposed extension to the north-west corner of the building would have a maximum depth of 3.8m and a maximum width of 4m. The proposed extension to the north-east corner of the building would have a maximum depth of 2.6m and a maximum width of 4.3m. The proposed extension to the south-east corner of the building would measure 2.6m wide by 0.8m deep. The extensions would be constructed of external materials to match those of the existing building.
3.2Conclusion
3.2.1 The proposed development is considered acceptable in terms of style and design, including its scale, bulk, siting and materials, as it would not have a detrimental impact upon the character and appearance of the area. Furthermore it would not be detrimental upon the amenity of any neighbouring properties and would be acceptable in terms of highway safety, vehicle parking provision, access and flood risk. As such would be in accordance with adopted policies S1, E1, BE1, T1 and of the adopted Maldon District Replacement Local Plan, policies S1, S5, D1, D5, T1 and T2 of the submitted Local Development Plan and advice contained within the National Planning Policy Framework.
4. MAIN RELEVANT POLICIES
Members’ attention is drawn to the list of background papers attached to the agenda.
4.1National Planning Policy Framework 2012 including paragraphs: 14 Presumption in favour of sustainable development 17 Core Planning Principles 56 - 68 Requiring Good Design Agenda Item no. 10 Page 3 / 8 103-104 Meeting the challenge of climate change, flooding and coastal change
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Appointment of Vice-ChairpersonRESOLVED that Councillor A M Lay be elected Vice-Chairperson of the Central Area Planning Committee for the Municipal...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.