RESOLVED that this application be APPROVED subject to the following conditions: 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2 The development hereby permitted shall be carried out in complete accordance with the approved drawings specifically referenced on this decision notice. 3 The external surfaces of the development hereby approved shall be constructed of materials and finish as detailed within the application. 4 Prior to the first occupation of the extensions hereby permitted, the first floor window in the north east elevation serving the en -suite and the second floor dormer window in the north east elevation serving the shower room shall be glazed with opaque glass and shall be retained as such thereafter. POSITIVE AND PROACTIVE STATEMENT Town and Country Planning (Development Management Procedure) (England) Order 2015 - Positive and Proactive Statement: The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework. Furthermore, Members of the planning committee which took the decision to grant planning permission as the proposal has been considered acceptable
Word for word from the decision Maldon published for this meeting.Source: democracy.maldon.gov.uk
REFUSE for the reasons as detailed in Section 8 of this report.
2. SITE MAP
Please see overleaf.
Agenda Item no. 8 Our Vision: Working in Partnership to make the Maldon District a better place to live, work and enjoy Agenda Item no. 8 3. SUMMARY
3.1Proposal / brief overview, including any relevant background information
3.1.1 Planning permission is sought to change to the shape and raise the height of the existing roof, construction of two dormer windows and one roof light to the front and one dormer window and two roof lights to the rear elevation, to create habitable space within the roof space. The construction of a two storey rear extension.
3.1.2 The height of the existing dwelling is proposed to be increased by 1m which will give the dwelling an overall height of 8.5m from 7.5m. The proposed dormers will measure 1.9m in width, 2.3m in depth with an overall height of 1.5m. The proposed roof lights will measure 0.8m in width and 0.9m in height.
3.1.3 The proposed extension would measure 3.3m deep by 4.5m wide with an overall height of 7.2m. The materials of the proposed dormers and the two storey extension would match those of the existing dwelling.
3.2Conclusion
3.2.1 The proposed development, by reason of its design, bulk, size and scale would appear as an incongruous form of development that would have a detrimental impact upon the character and appearance of the streetscene and the original dwelling. The proposal is therefore, considered to conflict with policies BE1 and BE6 of the adopted Maldon District Replacement Local Plan, policy D1 and T2 of the submitted Local Development Plan and the stipulations of the National Planning Policy Framework.
4. MAIN RELEVANT POLICIES Members’ attention is drawn to the list of background papers attached to the agenda.
4.1Maldon District Replacement Local Plan 2005 – Saved Policies: • BE1 – Design of New Development and Landscaping • BE6 – Extension to Dwellings • T8 – Vehicle Parking Standards
4.2Maldon District Local Development Plan submitted to the Secretary of State for Examination-in-Public on 25 April 2014: • D1 – Design Quality and Built Environment • H4 – Effective Use of Land • T2 – Accessibility
4.3Relevant Planning Guidance / Documents: • National Planning Policy Framework (NPPF) • National Planning Policy Guidance (NPPG) • Essex Design Guide • Car Parking Standards
Agenda Item no. 8 5. MAIN CONSIDERATIONS
5.1Principle of Development
5.1.1 The principle of altering and extending a dwellinghouse to provide facilities in association with residential accommodation is considered acceptable, in compliance with policy BE6 of the RLP and policy H4 of the submission LDP. Other material planning considerations are discussed below.
5.2Design and Impact on the Character of the Area
5.2.1 It should be noted that good design is fundamental to high quality new development and its importance is reflected in the NPPF. The basis of emerging policy D1 of the LDP ensures that all development will not have a detrimental impact on its surrounding area and local context and will actively seek opportunities for enhancement in the built environment.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Appointment of Vice-ChairpersonRESOLVED that Councillor A M Lay be elected Vice-Chairperson of the Central Area Planning Committee for the Municipal...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.