HOUSE/MAL/16/00885 - 18 St. George's Close, Heybridge Basin
ApprovedPlanning1 paper
Central Area Planning Committee approved this item on Wednesday 19 October 2016. Below is the council's own wording, with the papers it was decided on.
RESOLVED that this application be APPROVED subject to the following conditions: 1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2. The development hereby permitted shall be carried out in complete accordance with the approved drawings specifically referenced on this decision notice. 3. The external surfaces of the extension hereby approved shall be constructed of materials and of a finish as detailed within the application.
Word for word from the decision Maldon published for this meeting.Source: democracy.maldon.gov.uk
REFUSE for the reasons as detailed in Section 8 of this report.
2. SITE MAP
Please see overleaf.
Agenda Item no. 8 Our Vision: Working in Partnership to make the Maldon District a better place to live, work and enjoy Agenda Item no. 8 3. SUMMARY
3.1.1 The application site is located to the eastern side of St Georges Close. St Georges Church is situated to the south of the site and a public footpath is sited opposite the entrance of the host dwelling. The main form of development within the area is residential in character containing mainly detached dwellings. St Georges Close is a cul-de-sac within the residential development boundary of Heybridge. The subject dwelling is a detached dwelling with a detached double garage located to the side/rear of the dwelling.
3.1.2 The application seeks planning permission to provide habitable accommodation within the existing loft space and the construction of two dormer windows to the front elevation and two dormer windows and one roof light to the rear elevation. The dormer windows measure 1.4m in width, 1.2m in depth with an overall height of 1.9m. The roof light measures 0.6m in width and 1m in length. The materials proposed for the dormer windows will be render or weatherboard to the external walls with concrete pantiles tiles and white PVCu windows to match the existing.
3.2Conclusion
3.2.1 It is considered that the proposed dormers would result in an incongruous form of development that is unsympathetic to the general character and appearance of the area and the host dwelling, in particular the proposed dormer windows. It is therefore considered that the proposed development is not in accordance with policies BE1 and BE6 of the RLP, D1 of the emerging LDP and guidance within the NPPF.
4. MAIN RELEVANT POLICIES
Members’ attention is drawn to the list of background papers attached to the agenda.
4.1National Planning Policy Framework 2012 including paragraphs: 14 - Presumption in favour of sustainable development 17 - Core Planning Principles 56-68 - Requiring Good Design
4.2Maldon District Replacement Local Plan 2005 – Saved Policies: BE1 - Design of Development and Landscaping BE6 - Extensions to Dwellings
4.3Maldon District Local Development Plan submitted to the Secretary of State for Examination-in-Public on 25 April 2014: D1 - Design Quality and Built Environment
5.1.1 The proposal is for extensions and alterations to an existing dwelling. The principle of altering and extending an existing dwelling to provide facilities in association with residential accommodation is considered acceptable in principle, in compliance with BE6 of the RLP and H4 of the submission LDP. Other material planning considerations are discussed below.
5.2Design and Impact on the Character of the Area
5.2.1 It should be noted that good design is fundamental to high quality new development and its importance is reflected in the NPPF. The basis of emerging policy D1 of the LDP ensures that all development will not have a detrimental impact on its surrounding area and local context and will actively seek opportunities for enhancement in the built environment.
5.2.2 In The NPPF states that:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Appointment of Vice-ChairpersonRESOLVED that Councillor A M Lay be elected Vice-Chairperson of the Central Area Planning Committee for the Municipal...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.