Resolved
RESOLVED that the application be APPROVED, subject to the following conditions: 1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2. The development shall be carried out in accordance with the following approved plans and documents: Drawings: location plan, existing elevations, proposed elevations, proposed floor plans, site plan. 3. The external surfaces of the building(s) shall be constructed of the materials specified on plan Proposed Elevations and within the planning application. 4. Details of the materials to be used for the hard surfacing of the site shall be submitted to and approved in writing by the local planning authority. The hard landscape works shall be carried out as approved prior to the first use / occupation of the development hereby approved and retained and maintained as such thereafter. 5. Notwithstanding the provisions of Article 3 of the Town & Country Planning (General Permitted Development) Order 2015 (or any Order amending, revoking or re-enacting that Order) no dormer window or other form of addition or opening shall be constructed in the roof or gable walls of the building(s)/ extension hereby permitted without planning permission having been obtained from the local planning authority. 6. Prior to the commencement of the development details of the surface water drainage scheme to serve the development shall be submitted to and agreed in writing by the local planning authority. The agreed scheme shall be implemented prior to the first occupation of the development. The scheme shall ensure that for a minimum: 1) The development should be able to manage water on site for 1 in 100 year events plus 40% climate change allowance. 2) Run-off from a greenfield site for all storm events that have a 100% chance of occurring each year (1 in 1 year event) inclusive of climate change should be no higher than 10/ls and no lower than 1/ls. The rate should be restricted to the 1 in 1 greenfield rate or equivalent greenfield rates with long term storage (minimum rate 1l/s) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) You are advised that in order to satisfy the soakaway condition the following details will be required:- details of the area to be drained, infiltration rate (as determined by BRE Digest 365), proposed length, width and ... view the full minutes text for item 91.