Central Area Planning Committee approved this item on Wednesday 12 December 2018. Below is the council's own wording, with the papers it was decided on.
RESOLVED that the application be APPROVED subject to the following conditions: 1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2. The development hereby permitted ... view the full minutes text for item 695.
Word for word from the decision Maldon published for this meeting.Source: democracy.maldon.gov.uk
APPROVE subject to the conditions (as detailed in Section 8 of this report).
2. SITE MAP
Please see overleaf.
Agenda Item no. 6 Our Vision: To make Maldon District a better place to live, work and enjoy Agenda Item no. 6 3. SUMMARY
3.1Proposal / brief overview, including any relevant background information
3.1.1 The application site is located on the southern side of Bates Road within an established industrial estate which is part of the 43.6ha ‘Causeway, Maldon and Heybridge’ area (E1(l)) allocated within the Local Development Plan (LDP) for B1, B2, B8 uses. The site is also within the Causeway Regeneration Area designated as part of the Maldon and Heybridge Central Area Masterplan (Policy S5).
3.1.2 The 0.24 hectare (ha) site accommodates a building at its southern end with a forecourt to the north adjacent to Bates Road which accommodates a parking area. There is an existing vehicular access located in the north-eastern corner of the site. There are existing, commercial uses on all sides.
3.1.3 The development proposed is the change of use of Connect House from industrial warehousing (Use Class B2) to Short Term Operating Reserve and peak power ('STOR') embedded generating plant (sui generis). This would include external alterations to Connect House including the demolition of the eastern section of the building and the internal building service area on the western elevation. An external chimney would be erected 14m in height with six integrated exhaust stacks on the south-eastern elevation. In addition, auxiliary equipment, six radiator cooling units, a HV switchboard enclosure, a gas kiosk, substations, an acoustic barrier, security fence and associated works are also proposed.
3.1.4 Following the demolition proposed, the building would measure 25m in width and 33m in length. The existing building is 8.5m in height. Six penthouse louvres would be added to the south-eastern roof slope of the building, each 2m x 2.5m and 1.7m in height. Louvres would also be added to the north-western and south-western elevations of the building. The existing roof and wall metal sheet cladding would remain as existing.
3.1.5 The acoustic barrier fencing (grey in colour) would be 3.5m in height (including electric fencing) along the south-eastern boundary of the site for a distance of around 40m from the southern corner of the site. A section of acoustic fencing 4.95m in height would be located between the front elevation of the building and the south- eastern boundary of the site. The acoustic fencing would enclose the chimney stack, 6no. dry radiator coolers (each 6.8m x 2.2m and 3m in height) and High Voltage switch gear 4.7m x 9.6m and 4m in height, all of which would be grey in colour.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Appointment of Vice-ChairpersonRESOLVED that Councillor A M Lay be elected Vice-Chairperson of the Central Area Planning Committee for the Municipal...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.