CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Maldon District Council
Central Area Planning Committee, Wednesday 12 December 2018 at 7.30pm

FUL/MAL/18/01174 - Connect House, Quayside Industrial Estate, Bates Road, Maldon, Essex, CM9 5FA

Approved Planning 1 paper

Central Area Planning Committee approved this item on Wednesday 12 December 2018. Below is the council's own wording, with the papers it was decided on.

Item695

Resolved

RESOLVED that the application be APPROVED subject to the following conditions: 1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2. The development hereby permitted ... view the full minutes text for item 695.
Word for word from the decision Maldon published for this meeting. Source: democracy.maldon.gov.uk

Follow this further

Built from Maldon's papers

What the report saysPro

Report to Central Area Planning Committee

Recommendation

APPROVE subject to the conditions (as detailed in Section 8 of this report).

2. SITE MAP

Please see overleaf.

Agenda Item no. 6 Our Vision: To make Maldon District a better place to live, work and enjoy Agenda Item no. 6 3. SUMMARY

3.1Proposal / brief overview, including any relevant background information

3.1.1 The application site is located on the southern side of Bates Road within an established industrial estate which is part of the 43.6ha ‘Causeway, Maldon and Heybridge’ area (E1(l)) allocated within the Local Development Plan (LDP) for B1, B2, B8 uses. The site is also within the Causeway Regeneration Area designated as part of the Maldon and Heybridge Central Area Masterplan (Policy S5).

3.1.2 The 0.24 hectare (ha) site accommodates a building at its southern end with a forecourt to the north adjacent to Bates Road which accommodates a parking area. There is an existing vehicular access located in the north-eastern corner of the site. There are existing, commercial uses on all sides.

3.1.3 The development proposed is the change of use of Connect House from industrial warehousing (Use Class B2) to Short Term Operating Reserve and peak power ('STOR') embedded generating plant (sui generis). This would include external alterations to Connect House including the demolition of the eastern section of the building and the internal building service area on the western elevation. An external chimney would be erected 14m in height with six integrated exhaust stacks on the south-eastern elevation. In addition, auxiliary equipment, six radiator cooling units, a HV switchboard enclosure, a gas kiosk, substations, an acoustic barrier, security fence and associated works are also proposed.

3.1.4 Following the demolition proposed, the building would measure 25m in width and 33m in length. The existing building is 8.5m in height. Six penthouse louvres would be added to the south-eastern roof slope of the building, each 2m x 2.5m and 1.7m in height. Louvres would also be added to the north-western and south-western elevations of the building. The existing roof and wall metal sheet cladding would remain as existing.

3.1.5 The acoustic barrier fencing (grey in colour) would be 3.5m in height (including electric fencing) along the south-eastern boundary of the site for a distance of around 40m from the southern corner of the site. A section of acoustic fencing 4.95m in height would be located between the front elevation of the building and the south- eastern boundary of the site. The acoustic fencing would enclose the chimney stack, 6no. dry radiator coolers (each 6.8m x 2.2m and 3m in height) and High Voltage switch gear 4.7m x 9.6m and 4m in height, all of which would be grey in colour.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
FUL/MAL/18/01174: Connect House, Quayside Industrial Estate, Bates Road, Maldon, Essex, CM9 5FAReport 240 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

7 of 12 attended
BE
Councillor Bryan E HarkerChairperson, apologies
MM
Councillor Miss Miriam R LewisVice-Chairperson, present
MA
Councillor Miss Anne M BealeCommittee Member, present
AT
Councillor Andrew T CainCommittee Member, apologies
IE
Councillor Ian E DobsonCommittee Member, present
MB
Councillor Mrs Brenda D HarkerCommittee Member, apologies
MS
Councillor Mark S HeardCommittee Member, present
MR
Councillor Michael R PearlmanCommittee Member, apologies
SJ
Councillor Stephen J SavageCommittee Member, present
FG
Councillor Flo G F ShaughnessyCommittee Member, present
RA
Councillor Rev. Antony E J ShrimptonCommittee Member, present
MP
Councillor Mrs Penny A Channer CCex-Officio, apologies

On this subject at Maldon

Search all
  1. FUL/MAL/18/01174 - Connect House, Quayside Industrial Estate, Bates Road, Maldon, Essex, CM9 5FAThis decision
  2. 25/00364/FULM - Mangapps Store, Maldon Road, Burnham-on-CrouchApproved
  3. 25/00605/FUL, Land Adjacent Heybridge House Industrial Estate, Bates Road, MaldonDeferred
  4. 25/00160/FULM - Land South of Wycke Hill and Limebrook Way, Maldon, EssexDecided
  5. 24/00393/FUL - Heybridge Swifts Football Club, Scraley Road, Heybridge, Maldon, Essex, CM9 8FJApproved
  6. 24/00089/FUL - Land rear of 47 High Street, Maldon, EssexRefused

More from Maldon Central Area Planning Committee

All decisions
MeetingDecisionOutcome
29 Jul 2026 Minutes of the last meetingRESOLVED (i) that the Minutes of the meeting of the Committee held on 15 April 2026 be received. Minute No. 433 Apolo... Decided Open
14 May 2026 Election of ChairpersonRESOLVED that Councillor P L Spenceley be elected Chairperson of the Central Area Planning Committee for the Municipa... Decided Open
14 May 2026 Appointment of Vice-ChairpersonRESOLVED that Councillor A M Lay be elected Vice-Chairperson of the Central Area Planning Committee for the Municipal... Decided Open
15 Apr 2026 Minutes of the last meetingRESOLVED that the Minutes of the meeting of the Committee held on 17 December 2026 be approved and confirmed. Approved Open
17 Dec 2025 Minutes of the last meetingRESOLVED that the Minutes of the meeting of the Committee held on 19 November 2025 be approved and confirmed. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies