FUL/MAL/18/00381 - Millfields Caravan Park, Millfields, Burnham-on-Crouch, Essex
ApprovedPlanning1 paper
South Eastern Area Planning Committee approved this item on Monday 9 September 2019. Below is the council's own wording, with the papers it was decided on.
RESOLVED that the application be APPROVED subject to the following conditions: 1. Prior to works above ground level, details of the external materials to be used in the construction of the outbuilding hereby approved shall be submitted to the Local Planning Authority for approval in writing. The construction of the outbuilding shall be carried out in accordance with the approved details and retained as such in perpetuity. 2. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 3. The development hereby permitted shall be carried out in complete accordance with approved drawings: ATS/537/03; 10955-0020-002; 10955-0001-007; RCEF64080-SK002 REV B and RCEF64080-SK003 REV A. 4. The development hereby permitted shall only be used ancillary to the caravan park proposed as shown on approved drawing 10955-0001-007 and for no other purpose, including any type of residential accommodation, at any time. 5. The proposed development shall be implemented in accordance with the forms of mitigation included in Ecology Survey Report (dated November 2018) and be retained as such in perpetuity. 6. The use of the site hereby permitted shall ... view the full minutes text for item 5.
Word for word from the decision Maldon published for this meeting.Source: democracy.maldon.gov.uk
3.1Proposal / brief overview, including any relevant background information
Site description
3.1.1 The application site, according to the Local Development Plan (LDP), forms part of the Riverside Park, which is approximately 23.15 hectares in size, to the southeast of Burnham-on-Crouch. The site is located east of Station Road and the Dengie Hundred Sports Centre, north of the river Crouch marshes, outside the settlement boundary of Burnham-on-Crouch.
3.1.2 The site is accessed via a west turning head onto Station Road. It is approximately 2 hectares is size and it is mainly grassed over with sporadic trees and hedges along the boundaries. A ditch traverses the site. The site has a lawful use as a caravan park and although at present there appears to be only a small utilities’ structure on site, the site was occupied by caravans since 2006.
3.1.3 The Burnham-on-Crouch Rugby Union Football Club and the Dengie Hundred Sports Centre lie to the east of the site, a car park is located to the south of the site, residential properties are sited to the north, while to the west is public open space and the Burnham-on-Crouch marine.
3.1.4 Whilst the application site is flat, topographically the land rises steeply to the south and west of the site. The site is located within flood zone 3.
Description of proposal
3.1.5 Planning permission is sought for the erection of a single storey building to be used as offices, shop, shower/toilet facilities, spa, pool facilities and gym, the formation of hardstanding to be used as access road and provide off-street parking and enhanced landscaping, in association with an existing caravan park. A total of 52 caravans would be stationed on site, which was confirmed that would comply with the requirements of The Caravan Act. Although the existing access to the site would be retained, the caravan park road would be amended to follow the boundary lines of the application site.
3.1.6 The proposed building would be a simple timber framed structure, measuring 21.6m wide, 9.9m deep, 3.3m high to the eaves, with a maximum height of 6.4m. materials to be used to the external elevations would include metal seam roof (colour grey), the external walls would be cladded (colour ‘cliffside’) with brickwork to the slab level and the windows would be metal framed (colour dark grey).
3.1.7 Each caravan would be served by one off-street parking space and an additional eight parking spaces would be provided at the entrance of the site.
3.1.8 In terms of landscaping, it is noted that the majority of the existing trees and hedges will be retained and reinforced with new trees, hedges and shrubs.
3.1.9 The information submitted with the application advise that the caravan park would operate as holiday caravan park for 10 months of each calendar year, between 11th
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.