Resolved
RESOLVED that the application be APPROVED subject to the following conditions: 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2 The development hereby permitted shall be carried out in accordance with the following approved plans and documents: Site location plan and block plan (within Design and Access Statement) BA/P21-602-310 Demountable Block 1 to be demolished Floor Plan and Elevations BA/P21-602-311 Demountable Block 2 to be demolished Plans and Elevations BA/P21-602-312 Container Block 3 to be demolished Plan and Elevations BA/P21-602-313 Demountable Block 4 to be demolished Plan and Elevations BA/P21-602-203 Revision A Proposed Ground Floor Plan BA/P21-602-204 Revision A Proposed First Floor Plan BA/P21-602-205 Revision A Proposed Roof Plan BA/P21-602-301 Proposed North Elevation BA/P21-602-302 Revision A Proposed South Elevation BA/P21-602-303 Revision A Proposed East Elevation BA/P21-602-304 Revision B Proposed West Elevation BA/P21-602-305 Proposed Site Sections BA/P21-602-103 Existing Site Sections Transport Statement by Parker Planning Services, reference 3088 Revision V2 Flood Risk Assessment by JPC Environmental Services Preliminary Ecological Appraisal by Essex Ecology Services Ltd Design and Access Statement 3 No development works above ground level shall occur until details of a surface water drainage scheme to serve the development have been submitted to and agreed in writing by the Local Planning Authority. The agreed scheme shall be implemented prior to the first occupation of the development . The scheme shall ensure that for a minimum: 1) The development should be able to manage water on site for 1 in 100 year events plus 40% climate change allowance. 2) Run-off from a greenfield site for all storm events that have a 100% chance of ... view the full minutes text for item 374.