It was further agreed that an additional conditionl regarding surfacing materials would be included. Councillors A S Fluker, M G Neall, D O Bown, K M H Lagan, L J Haywood, J C Stilts, W Stamp, U G C Siddal-Norman, S Dodsley, M G Bassenger and J C Hughes requested to have their vote against the approval recorded. RESOLVED that this application be APPROVED subject to the following conditions and an additional condition regarding surfacing materials: 1. The development hereby permitted shall be begun before the expiration of five years from the date of this permission. 2. The grant of planning permission shall expire 40 years from the date of when electricity is first exported from any of the solar panels to the electricity grid ("First Export Date"). Written notification of the First Export Date shall be given to the Local Planning Authority within 1 month of its occurrence. 3. If the use of the hereby approved development should cease for the purposes of energy generation ... view the full minutes text for item 220.
Word for word from the decision Maldon published for this meeting.Source: democracy.maldon.gov.uk
APPROVE subject to the conditions (as detailed in Section 8 of this report).
2. SITE MAP
Please see below.
Our Vision: Where Quality of Life Matters 3. SUMMARY
3.1Proposal / brief overview, including any relevant background information
Site Description
3.1.1 The application site comprises of an area of land measuring 43 hectares to the north of Marsh Road, Burnham-on-Crouch. The landscape is flat and is used for agricultural purposes comprising of two field units separated and bound by hedging. The ground level across the site is between 0.87m and 2.9m AOD (Above Ordnance Datum). The site is located 1.5km east of Burnham-on-Crouch and 1.9km south west of Southminster.
3.1.2 Approximately 450 metres to the south west of the site is a Grade II listed building called Dammerwick Farm House. 650m to the south west of the site is Brook Farm House and 320m to the west is a Grade II listed Newman’s Farm. To the north east of the site is the Turncole Farm Wind Farm which was allowed on appeal in February 2014 and is built and operational.
Description of the Proposal
3.1.3 Full planning permission is sought for the construction and operation of a solar farm and Battery Energy Storage System (BESS) with a power generation capacity up to 25.5 MW (Megawatt), together with all associated works, equipment, necessary infrastructure and landscaping.
3.1.4 The applicant has advised that the solar farm part of the development would export up to 17MW which is enough to power 6,600 homes. Permission is sought for a period of 40 years and after which the land will be cleared and restored to arable use.
3.1.5 The solar panels would be photovoltaic panels that absorb daylight and convert that into electricity. Each panel would be 2.38m x 1.3m with a depth of 35mm. They would be attached to a fixed metal mounting frame at 25 degrees at 1.55m above ground level and would be no higher than 3.5m. The mounting frames are either screwed or pushed into the ground. The panels would be laid out in rows east to west and would face south. The distance between each row would be between 3m and 5m. The panels would be connected to a network of medium voltage power stations (transformer and inverters), 13 in total. A spare parts container and welfare cabin is proposed, with each measuring 12.2m long by 2.6m high by 2.45m wide.
3.1.6 The BESS is proposed for storing electricity when demand does not match supply and would export electricity to the local grid in periods of high demand. The BESS would consist of 12 battery containers each measuring 12.19m long by 2.9m high by 2.5m wide, 12 power conversion system units measuring 3.7m long by 2.35m high by 2.0m wide and 6 medium voltage transformers measuring 2.44m long by 2.98m high by 2.52m wide. The BESS would be housed on a raised platform at 3.44m AOD to provide resilience in the event of flooding.
3.1.7 A water tank would be provided for fire safety.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.