Resolved
that the amended Minutes of the meeting held on the 5 th February 2015 be confirmed as a true and correct record and signed by the Chairman
Planning Committee decided this item on Tuesday 7 April 2015. Below is the council's own wording, with the papers it was decided on.
Resolved
that the amended Minutes of the meeting held on the 5 th February 2015 be confirmed as a true and correct record and signed by the Chairman
Appendix 1 Planning Committee
UPDATE SHEET
5th February 2015
AGENDA ITEM APPLICATION NO. OFFICER PRESENTING 6 14/00894/OUT SJ / DR
Additional Representations Received
Barbara Flood (address not supplied)
This representation raises no new issues
Listed Building Descriptions (summary)
GV II Clay Green Farmhouse - GRADE II Date first listed: 19-Sep-1984 Farmhouse. C17 with later additions to rear. Timber-framed with part wattle-and- daub, part brick infill, tiled roof.
OUTBUILDINGS 4 YARDS WEST OF CLAY GREEN FARMHOUSE - GRADE II Date first listed: 19-Sep-1984 Outbuilding, probably former cartshed or cowhouse with hayloft above. Circa 1700. Timber-framed with part brick, part wattle-and-daub infill, tiled roof. 2 bay plan.
RECOMMEND that the Head of Planning, Economy and Housing be authorised to GRANT outline planning permission subject to the conditions set out in this report and to the applicant entering into a Section 106 agreement –
to secure financial contributions towards; education facilities, open space, sport & recreation provision and sustainable transport, and to ensure that; the affordable housing units are retained in perpetuity; and
which covenants that the land edged blue is not separated from the land edged red and retained as a SUDS / orchard area for the lifetime of the development.
1 Appendix 1 AMENDED CONDITIONS
9. DRAINAGE No development (other than that required to comply with conditions 16, 19 and 20) conditions shall commence until a scheme for surface water drainage has been submitted to, and approved in writing by the Local Planning Authority. Prior to submission of the scheme an assessment shall be carried out into the potential of disposing of surface water by means of a sustainable drainage system (SuDS), and the results of this assessment shall be submitted to and approved by the Local Planning Authority. If infiltration techniques are used then the plan shall include the details of field percolation tests. There shall be no increase in surface water run-off from the site compared to the existing pre-application run-off rate up to a 1 in 100 year storm event plus an appropriate allowance for climate change. The scheme shall provide an appropriate level of runoff treatment. No dwelling shall be occupied until the scheme has been implemented in accordance with the approved details and is brought into operation. Where a sustainable drainage scheme is to be provided, the submitted details shall:
i. provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters;
ii. include a timetable for its implementation;
iii. provide a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by statutory undertaker or failing that, robust private arrangements to secure the operation of the scheme throughout the lifetime of the development.
REASON: To ensure that the development is provided with a satisfactory means of drainage as well as to reduce the risk of creating or exacerbating a flooding problem and to minimise the risk of pollution in accordance with national policy guidance contained within the National Planning Policy Framework and in accordance with Policy DS3 of the Malvern Hills District Local Plan.
13. EXTERNAL LIGHTING Prior to the commencement of the development, an external lighting scheme covering the whole application site shall be submitted to and approved in writing by the Local Planning Authority. There shall be no street lighting. The development shall be carried out in accordance with the approved scheme, and thereafter no street lighting shall be erected within the site, without the prior written approval of the Local Planning Authority.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Confirmation of MinutesMinutes | 5 pages | Download |
PDF |
Update 2015-02-05Report | 4 pages | DownloadRead as text |
Follow Planning Committee at Malvern Hills and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 30 Mar 2017 | Confirmation of MinutesThat the Minutes of the previous meeting, held on 28 February 2017, be approved and signed by the Chairman as a true ... | Approved | Open |
| 30 Mar 2017 | Shop Front Design Guide Supplementary Planning Documenti) That the changes to the Shop Front Design Guide Supplementary Planning Document as shown in Appendix 2 to this rep... | Approved | Open |
| 30 Mar 2017 | Conservation Area Reviews and Character Appraisalsi) That Planning Committee note the report ii) That Subject to resource availability, priority be given to reviewing ... | Noted | Open |
| 30 Mar 2017 | Revision to Local Enforcement Plan Prioritiesi) That the Planning Committee recommends that the Council adopt the revised changes to the Local Enforcement Plan in... | Approved | Open |
| 30 Mar 2017 | Review of the draft Local Area Planning Application Validation Requirements List(i) Planning Committee approve the draft Local Validation Document for consultation purposes and to inform decisions ... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.