Decision The Committee resolved to be Minded to Approve subject to a S106 to secure affordable student housing and commercial waste disposal, removal of the EA’s objection and agreement that the development meets the requirements of paragraph 171 (b) of the NPPF in relation to the exception test.
Word for word from the decision Manchester published for this meeting.Source: democracy.manchester.gov.uk
The application proposes a part 4/5 and part 37 storey PBSA building with a ground floor commercial unit. 8 objections (including 1 on behalf of 6 residents) have been received. MMU state that they do not support the application due to less than 20% of units being made available at a discounted rent and have raised concerns about the predominance of studio units which are less affordable than cluster units. A letter of support has been received from Macintosh Village Management.
Principle and the schemes contribution to regeneration: The development is in accordance with national and local planning policies, and would bring significant economic, social and environmental benefits. It would develop a vacant, brownfield site which has a negative impact on visual amenity. PBSA would be consistent with policy H12 of the Core Strategy and would increase the supply of student accommodation in the City. 10% of the units would be affordable, available on a discounted rent.
Economic Benefits: The development would add £3.6 million GVA to the Manchester Economy. A local labour proposal would ensure local people benefit and would create temporary and full time equivalent jobs.
Social Benefits: This proposal would redevelop a derelict and vacant, low quality brownfield site close to the Oxford Road Corridor. 595 bedspaces (including up to 38 (6%) accessible rooms) would support the student accommodation pipeline.
Environmental Benefits: This is a highly accessible area where walking and cycling would be encouraged. Green roof gardens and bird and bat boxes would improve biodiversity. The building would run on all electric systems which would reduce carbon emissions as the grid decarbonises. Sustainable drainage would manage surface water. The site is in a poor condition and has been in need of investment for some time. The design would improve the appearance of Gloucester Street / Cambridge Street and from within the First Street SRF Area. Impact on the historic environment: There would be some harm to the setting of adjacent listed buildings and from the significant loss of existing fabric from the Hotspur Press Building, a Non Designated Heritage Asset (NDHA). The impact on setting would be outweighed by the public benefits. In light of the significance of the elements to be retained and those lost and the need to develop the site, the loss of fabric from the NDHA is considered to be acceptable.
Impact on Local Residents: There would be impacts on daylight/sunlight and overlooking. Construction impacts could be managed to minimise the effects on residents and local businesses. Noise outbreak from plant would meet relevant standards. There would be some disruption to local businesses as a result of the development, however this would not be unusual in a City Centre context and this is an area where change is expected, and proposals of a similar scale have been approved within the immediate area.
A full report is attached below for Members consideration.
Background
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.