127/2011 The Cabinet approved the business case and the preferred option (option 2) to allow more detailed design work to be undertaken. Reasons: Option 2 is the preferred choice of the design team and the school, as it provides the provision of the new accommodation adjacencies allowing for opportunities of fuller integration between the two existing school buildings. This option also provides best value for money . The cost estimates indicate that the preferred scheme, which will deliver the identified accommodation requirements, should be affordable within the provisional budget envelope of £1.5m. Accurate cost estimates will be developed during the detailed design stage and presented for approval at Gateway 1 stage, prior to going out to tender.
Word for word from the decision Medway published for this meeting.Source: democracy.medway.gov.uk
This report seeks approval for business case, based on an initial feasibility study, for the Autistic Spectrum Disorders Unit at Bradfields School and permission to proceed to detailed design stage at Gateway 1 from Cabinet.
1. BUDGET AND POLICY FRAMEWORK
1.1The project is within the policy and budgetary framework, being consistent with the provisions outlined in the council’s Special Educational Needs (SEN) strategy and the overarching Children and Young People’s Plan.
Background
2.1Bradfields School, incorporating the buildings previously occupied by Ridge Meadow Primary School, has been identified as the preferred site to establish a base for children with Autistic Spectrum Disorders (ASD). Following the Cabinet decision on 2 August 2011, (Cabinet Decision Number 93/2011), a public consultation commenced on 19 September 2011 on the proposals to make prescribed alterations to Bradfields Community Special School by way of: an expansion of the upper and lower age limits; an addition to the SEN categories; an increase in the number of pupils. 2.2 Dependent on the outcome of consultation and any subsequent prescribed alterations to the school, the purpose of the associated building project would be to provide accommodation to enable up to an additional 40 ASD pupils to be educated by Bradfields School. The current draft SEN Master Plan notes there are 316 Medway resident pupils with ASD as a primary need, of which 216 are currently educated in Medway. 100 pupils are educated out of area or in independent or non-maintained schools. The unit will accommodate pupils from age 3 through to 19, with support services for older pupils to the age of 25, with the possibility of an integrated foundation stage in the future. The Cabinet is scheduled to receive a report on the outcome of consultation for the prescribed alterations on 20 December 2011.
2.3Bradfields School now includes the accommodation previously occupied by Ridge Meadow Primary School, following the closure of the primary school in August 2010. This building is now known as the Lower Bradfields School. The school’s existing Key Stage 3 pupils moved into this building in September 2011. This has given sufficient space in the main school buildings, known as the Upper Bradfields School for the post 16 students previously sited on the Youth House site in Gillingham.
2.4Full council agreed a scheme be added to the Capital Programme to create a Specialist Autism Unit on the Ridge Meadow site and that a sum of £1,500,000 be approved at the Full Council meeting on 24 February 2011
2.5A feasibility study has been undertaken that has identified the accommodation required for a unit for up to 40 additional ASD pupils. Seven classrooms, a therapy room, two sensory rooms, staff and office spaces, one to one rooms and calming and ancillary spaces, will need to be provided. External areas will provide sensory gardens and a semi-enclosed walkway between the Upper and Lower Bradfields School buildings.
Options
3.1Two options have been developed which deliver these requirements in the following way:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Medium Term Financial Outlook 2026-2031The Cabinet noted the projected budget requirement, the Council’s resource assumptions, and the resultant projected b...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.