Resolved
Approved subject to: a) A S106 agreement being entered into to secure: i) The development is to be dealt with in phases and occupation of the respective dwellings can only take place once the works on that phase have been completed in accordance with the planning permission and the works carried out in accordance with the schedules of works set out in the Heritage statement prepared by Asset Heritage Consulting dated December 2016 submitted with the listed building and planning applications received on 18/01/2017 and drawings received 15/20/32, 15/20/31 Rev B, and 15/20/30 Rev A in respect of the Royal Oak’s conversion to a four bed dwelling house and erection of a terrace of 3 two bed dwelling houses to the satisfaction of the Council. ii) Phase 1 must be completed before any occupation of the new terrace of 3 dwelling houses. iii) The Phases are as follows: Phase 1 Demolition of the ground floor extensions to the sides and rear of the Royal Oak building. Restoration of the internal and external aspects of the Royal Oak. Conversion of the Royal Oak to a 4 bedroom dwelling house (Drawing 15/20/32). No occupation of the Royal Oak as a dwelling house until such time that all the conversion, restoration and repair works have been completed. Phase 2 Erection of a terrace of three 2 bedroom houses (drawings 15/20/30 Rev A and 15/20 31 Rev B) No occupation of terrace of 3 houses shall take place until such time as the works in Phase 1 have been completed. iv) The Second Schedule shall set out a full method statement for the repair and restoration for the Royal Oak. v) A management plan should be set out to ensure the long term maintenance and repair of the communal areas of the listed building comprising shared boundaries and car parking areas. b) Conditions 1 – 10 as set out in the report for the reasons stated in the report.