Item264
Resolved
Approved with conditions 1 to 24 as set out in the report for the reasons stated in the report and subject to notifying the HSE. Condition 23 to be amended as follows: 23. Prior to occupation (or within an agreed implementation schedule) a signed verification report carried out by a qualified drainage engineer (or equivalent) must be submitted to and approved in writing by the Local Planning Authority to confirm that the agreed surface water and foul water system has been constructed as per the agreed scheme and plans. The report shall include details and locations of critical drainage infrastructure (such as inlets, outlets and control structures) including as built drawings, and an operation and maintenance manual for the unadopted parts of the scheme as constructed. Reason: This condition is sought in accordance with paragraph 168 of the NPPF to ensure that suitable surface water drainage scheme is designed and fully implemented so as to not increase flood risk onsite or elsewhere. ... view the full minutes text for item 264.
Word for word from the decision Medway published for this meeting.
Source: democracy.medway.gov.uk