P/26/0068 - Canolfan Goetir Gethin, A470 Pentrebach i Rhydycar, tua'r gogledd, Abercanaid, Merthyr Tudful CF48 1YZ

Approved Planning 1 paper

AI summaryMerthyr Tydfil planning committee approved resurfacing the 3,830m long Bike Park Wales uplift track at Gethin Woodland Centre, Abercanaid, with tarmac, subject to conditions on drainage, plans and protected species.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedThree planning conditions and five informatives
MoneyNot stated
What happens nextBegin within five yearsAnd submit a post-construction drainage survey
Who it affectsBike Park Wales trackAnd users of crossing public rights of way

What was decided

The committee approved the application to resurface the existing uplift track in tarmac, subject to the conditions in the report. Report P99

Three conditions were imposed: a five year time limit, adherence to the listed approved plans and documents, and a post-construction drainage verification report before the track is used. Report P100, P102, P105, P106

Five informatives were added covering European protected species, nesting birds, the nearby scheduled monument, a recorded mine entry, and engagement with the Rights of Way Division. Report P111, P115, P118, P119, P120

Why

The site is an existing tourism, leisure and recreation facility and the countryside location is justified under LDP policies SW13 and EcW7, with no objections from internal or external consultees. Report P25, P27, P56, P57

No letters of representation were received during public consultation and the proposal would not widen or lengthen the existing track, with no tree or vegetation removal needed. Report P13, P30, P62

Officers accepted that a bound tarmac surface would reduce silty run-off into adjacent watercourses compared with the existing loose stone surface, an environmental benefit. Report P72, P73, P81

What happens next

The development must begin not later than five years from the date of the decision. Report P100, P101

Before the uplift service resumes, the operator must submit a post-construction structural survey of all culverts, watercourse crossings and ditches. Report P105, P106, P107

Surface water and land drainage must not connect directly or indirectly with the public sewerage network. Report P108, P109

Options considered

  • Chosen: Approve subject to conditions in the report. No significant concerns on landscape, heritage, drainage, ecology, highways, public rights of way, residential amenity or coal mining. Report P99

Implications

  • Environmental: Tarmac surface is expected to reduce silty run-off currently entering adjacent watercourses from the loose stone track. Report P72, P81
  • Risk: A recorded mine entry lies within or close to the planning boundary, prompting an informative drawing attention to Coal Authority policy. Report P96, P119
  • Legal: Carn Castell y Meibion ring cairn scheduled monument is approximately 30m from the site, with an informative reminding the applicant of duties under the relevant legislation. Report P64, P118
  • Equalities: Darker tarmac surface is expected to reduce the winter contrast of the track against the surrounding woodland. Report P62

Who and where

  • Operator of Bike Park Wales, the applicant Report P4, P5
  • Users of the four public rights of way that cross or share sections of the uplift road Report P7, P91
  • Residents of Merthyr Tydfil who use the site for active recreation Report P12, P94
  • Rhondda Cynon Taff County Borough Council, as 943m of the track lies within its boundary Report P5, P22, P23

Timeline

  • 2nd April 2026: Planning application submitted to Merthyr Tydfil County Borough Council Report P2
  • 22nd April 2026: Public notice published in the Merthyr Express Report P29
  • 28th April 2026: Site notices displayed in the vicinity of the site Report P29
  • 30th June 2026: Rhondda Cynon Taff approved the 943m section of the track within its boundary Report P23
  • 2nd September 2026: Merthyr Tydfil Planning, Regulatory and Licensing Committee determined the application Report P1
  • approximately 5 weeks: Anticipated construction period during daylight hours Report P13

Plain English for the jargon

  • Uplift track: A route along which minibuses with trailers carry riders and their bikes uphill, so they can ride down chosen trails.
  • SINC: Site of Importance for Nature Conservation, a local non-statutory ecological designation.
  • SLA: Special Landscape Area, a local landscape protection designation under LDP policy EnW5.
  • SAM: Scheduled Ancient Monument, a nationally protected archaeological site under Cadw oversight.
  • SuDS: Sustainable Drainage System, a way of managing surface water to reduce flood risk and pollution.
  • CEMP: Construction Environmental Management Plan, setting out how construction impacts on environment, pollution and lighting are controlled.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item101

Resolved

Resolved that: The application be approved subject to the conditions outlined in the report.
Word for word from the decision Merthyr Tydfil published for this meeting. Source: democracy.merthyr.gov.uk

Follow this further

Built from Merthyr Tydfil's papers

What the report saysPro

Report to Planning, Regulatory and Licensing, 14 pages

DATE WRITTEN 24th August 2026 REPORT AUTHOR Judith Jones CASE OFFICER Kate Glover COMMITTEE Planning and Regulatory COMMITTEE DATE 2nd September 2026

Application No. Date Determining Authority P/26/0068 2nd April 2026 MTCBC

Proposed Development Location Name & Address of Applicant/Agent

To resurface with tarmac the Gethin Woodland Centre [name removed] uplift track that currently serves A470 Pentrebach to c/o [name removed] Park Wales Rhydycar Northbound The Urbanists Abercanaid Westgate House Merthyr Tydfil 11 Womanby Street CF48 1YZ Cardiff, CF10 1BR APPLICATION SITE

The site forms part of the mountain bike facility known as Bike Park Wales. The proposed works relate to an established track which provides an ‘up-lift’ service to customers. This involves the operator using minibuses with trailers to transport customers and their bikes to the top of a hill so riders can ride down their chosen route. The track winds its way along the side of Pen Lan Hill and culminates on Mynydd Gethin. The highest section of the track, approximately 943m in length, is located within the boundary of Rhondda Cynon Taff County Borough Council (RCTCBC).

The track measures approximately 3,830m long and is on average 7m wide, covering an area of approximately 2.68 hectares (ha). There are some small variations to the width, in particular at the beginning of the track where the minibuses turn to pick up new passengers, and in three locations along the route where the track naturally narrows to less than 7m in width.

The land immediately adjacent to the existing track largely comprises existing gravel hardstanding, drainage features, unmade forestry terrain, and compacted soil tracks. It is flanked closely by mature woodland and pockets of scrub vegetation. The track is crossed by bridleways and a footpath, and some sections of the track are shared by the bridleways.

A number of Scheduled Ancient Monuments (SAMs) and the Aberfan Memorial Registered Park and Garden are located within 3km of the site. To the north of the site is the Cwm Glo a Glyndyrys Site of Special Scientific Interest (SSSI). The site is also within and directly adjacent to Special Landscape Area 3 (Merthyr West Flank) (SLA 3), several Sites of Importance for Nature Conservation (SINC), several areas of Ancient Woodland, and a Group Tree Preservation Order (Abercanaid).

The site is positioned entirely outside the defined settlement boundaries of Merthyr Tydfil, therefore the proposal is located in the countryside.

PROPOSED DEVELOPMENT

Full planning permission is sought for the comprehensive resurfacing of the existing internal track. The proposed engineering works would resurface the existing extent of the tracks with 150mm–200mm of quarried stone, 50mm of a finer grade quarried stone, and finished with a 60mm tarmac base course followed by a 40mm tarmac surface course.

The applicant has indicated that the upgrade is required to improve the operational structural capacity of the route, ensuring continuous, safe access for land management, emergency response vehicles, and active recreation users.

The applicant advises that the works would take approximately 5 weeks. No ground clearance is required or tree/vegetation removal is required, and as the works would take place only during daylight hours, no artificial light at night is needed.

Submitted in support of the planning application are the following documents: • Construction Environmental Management Plan (CEMP) • Public Rights of Way Crossing Section Drawing • Drainage Plan • Uplift Road Route Plan (illustrating locations of pinch points and the wider pick-up area) • Uplift Section Drawing • Ecological Statement • Pre-Application Consultation Report

PLANNING HISTORY

The application site and wider Gethin Woodland Centre site has been subject to extensive planning history linked directly to phases of expansion of the outdoor recreation facility. The relevant planning history is summarised below:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
P/26/0068: Canolfan Goetir Gethin, A470 Pentrebach i Rhydycar, tua'r gogledd, Abercanaid, Merthyr Tudful CF48 1YZReport 14 pages DownloadRead as text

More from Merthyr Tydfil Planning, Regulatory and Licensing

All decisions
MeetingDecisionOutcome
2 Sep 2026 Minutes of meeting Friday, 1 May 2026 of Licensing CommitteeResolved that: The minutes be approved as an accurate record. Approved Open
2 Sep 2026 Minutes of meeting Wednesday, 17 June 2026 of Licensing CommitteeResolved that: The minutes be approved as an accurate record. Approved Open
2 Sep 2026 Minutes of meeting Tuesday, 30 June 2026 of Licensing CommitteeResolved that: The minutes be approved as an accurate record. Approved Open
2 Sep 2026 Minutes of meeting Wednesday, 8 July 2026 of Licensing CommitteeResolved that: The minutes be approved as an accurate record. Approved Open
2 Sep 2026 Minutes of meeting Wednesday, 8 July 2026 of Planning, Regulatory and LicensingResolved that: The minutes be approved as an accurate record. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies