Development and Planning Applications Committee agreed this item on Thursday 16 June 2016. Below is the council's own wording, with the papers it was decided on.
RESOLVED A. The Committee agreed to GRANT Planning Permission subject to conditions B. The Committee agreed to request that Officers add a condition that requires samples of all materials to be approved by Officers C. The Director of Environment & Regeneration be given delegated authority to agree the detailed wording of the above extra condition.
Word for word from the decision Merton published for this meeting.Source: democracy.merton.gov.uk
CHECKLIST INFORMATION Heads of agreement: None Is a screening opinion required: No Is an Environmental Statement required: No Has an Environmental Impact Assessment been submitted: No Press notice: No Site notice: Yes Design Review Panel consulted: No Number of neighbours consulted: 21 External consultations: None
1. INTRODUCTION
1.1The applications have been brought before the Planning Applications Committee due to the number of representations received as a result of public consultation.
Page 121 2. SITE AND SURROUNDINGS
2.1The application site comprises a parcel of land adjacent to 5 Hillview, West Wimbledon, which is an end of terrace house.The land currently comprises an area of lawn on the street corner, two flat felt roofed single garages set at right angles to the flank wall on no 5 and a large area of concrete driveway in front of the garages and the flank of no. 5. The site abuts an electricity sub-station on the southern boundary. The surrounding area is residential in nature with houses on Hillview built during the 1970s.
2.2The site slopes downwards from north to south. The adjoining house at no 5 is 2-storey at the front and 3-storey at the rear as a consequence of the change in levels. The application site itself is separated from the substation site to the south by a small retaining wall at the boundary between the two driveways. On the other side of the substation are a further 3 linked flat roofed garages, also with a large concrete apron of hardstanding in front and then a further terrace of houses stepping down the hill.
2.3The site is not within a conservation area or controlled parking zone (CPZ) and has a PTAL rating of 1b, which means it has poor access to public transport.
3. CURRENT PROPOSAL
3.1The current application is for full planning permission to erect an end of terrace building comprising two self-contained residential units (1 x 1 bedroom (2 person) and 1 x 2 bedroom (3 person). The building would be arranged over three floors with the 1 bedroom unit located at lower ground/ground floor level and the 2 bedroom unit located at upper ground/ground and first floor levels.
3.2The proposed building would have a pitched main roof, partially recessed to incorporate an upper floor terrace. Its main materials would be brick with a tile roof, with a contemporary styling to its fenestration.The lower ground/ground floor flat would have access to 2 areas of amenity space, one on each frontage and the upper 2 bedroom unit has a roof terrace. One off-street parking space would be provided.
4. PLANNING HISTORY
The following planning history is relevant:
4.1MER141/73 - Conversion of garage to flat and erection of two garages.Granted - 11/04/1973.
4.215/P2987 - Erection of a two-storey end of terrace house on land adjacent to 5 Hillview.Registered.
4.3Pre –application advice for the erection of an end of terrace house was sought in April 2015 (Ref: 15/P1436/NEW)
Page 122 5. POLICY CONTEXT
5.1The following policies from the Adopted Sites and Policies Plan and Policies Maps (July 2014): DM D2 (Design considerations in all developments), DM D3 (Alterations and extensions to existing buildings), DM F2 (Sustainable urban drainage systems (SuDS) and; Wastewater and Water Infrastructure)
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Development and Planning Applications Committee at Merton and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.