Resolved
that members noted the contents of the report and commented on any aspects of the performance of the Partnerships Phase A and B contracts.
South London Waste Partnership Joint Committee noted this item on Tuesday 11 September 2018. Below is the council's own wording, with the papers it was decided on.
Resolved
that members noted the contents of the report and commented on any aspects of the performance of the Partnerships Phase A and B contracts.
Joint Waste Committee is asked to note the contents of this report, and comment on any aspects of the performance of the Partnership’s Phase A & B contracts.
Background Documents:
Contract Performance Monitoring updates have been presented to the Joint Waste Committee since 22 July 2010. The most recent reports were presented at the meeting in June 2018 by the Strategic Partnership Manager, Annie Baker.
Page 7 PHASE A BACKGROUND
1.1Contract 1 is operated by Viridor Waste Management Ltd and includes the bulk haulage of material and the disposal of residual waste.
1.2Contract 2, the HRRC service is operated by Veolia (ES) (UK) Ltd. The contract commenced on the 1st October 2015 and includes the management of the 6 Partnership HRRC sites in addition to the marketing of recyclates collected at each of the sites.
1.3Contract 3 is operated by Viridor and includes the marketing of recyclates and the treatment of green and food waste.
1.4The London Boroughs of Croydon, Sutton and Merton direct deliver kerbside collected residual waste and organics into the Beddington site, operated by Viridor. Merton also deliver kerbside recycling to Beddington, whilst Sutton delivers kerbside recycling to both Beddington and Veolia under a separate contract, and Croydon deliver all recycling to Veolia.
1.5The Royal Borough of Kingston (RBK) direct delivers kerbside collected waste, organics, and recyclates into the Kingston Villiers Road Waste Transfer Station (WTS). Viridor operate Villiers WTS and related bulk haulage services on behalf of RBK under Contract 1.
2. PERFORMANCE DETAIL
2.1Contract 1: Transport and Residual Waste Management (Viridor Waste Management Limited)
2.1.1. Under Contract 1 for the period being reported, 1st April 2018 until 30th June 2018, the Partnership managed just over 56,000 tonnes of residual waste. This shows a drop in waste of 2.4% (1,389 tonnes) when the data is compared to the same period last year. Please see Appendix A table 1a for further detail.
2.1.2. Landfill Diversion: Viridor has diverted just over 4,600 tonnes of residual waste from landfill via the Lakeside ERF during the period being reported. This equates to a 8% diversion from landfill for the Partnership. Viridor have direction on which boroughs’ waste is diverted to Lakeside, largely determined by the location and capacity at the facility receiving the waste. Please see Appendix A table 1b for further tonnage data.
2.1.3. The Contract is operating effectively. There were no major operational or performance issues, no formal complaints were reported, and there were no KPI failures reported under Contract 1.
2.2Contract 2: Management of the Household Reuse and Recycling Centres (Veolia (ES) (UK) Ltd)
2.2.1. Contract Management: the scope of the HRRC services can be summarised in three parts: the general management of the sites including Page 8 staffing, plant, equipment, and site layouts; the transportation of materials; and the recycling, treatment, and/or disposal of waste collected at the HRRC sites (excluding green and residual waste).
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Phase A & B Contracts UpdateReport | 140 KB | DownloadRead as text |
PDF |
Quarterly Dashboard Q1 2018-19Report | 62 KB | Download |
Follow South London Waste Partnership Joint Committee at Merton and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 15 Jun 2023 | Minutes of the Previous MeetingThat minutes of the meeting held on 25 April 2023 were agreed and signed as an accurate record. | Agreed | Open |
| 15 Jun 2023 | Contract Performance ReportThat the Joint Committee; · noted the contents of the report, and · commented on any aspects of the performance of th... | Noted | Open |
| 15 Jun 2023 | Partnership Budget Update 22/23 - Final Out-turnThat the report was noted. | Noted | Open |
| 25 Apr 2023 | Minutes of the Previous MeetingThat the minutes of the meeting held on 12 January were agreed as an accurate record. Item 8 on the agenda would be b... | Agreed | Open |
| 25 Apr 2023 | Partnership Budget Update - Month 11That the Committee noted the contents of the report. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.