Resolved
RESOLVED that 1. Application 20/P1412 be GRANTED Planning Permission subject S106 agreement and conditions. 2. Application 20/P1672 be GRANTED Listed Building Consent subject to conditions.
Development and Planning Applications Committee agreed this item on Thursday 16 July 2020. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that 1. Application 20/P1412 be GRANTED Planning Permission subject S106 agreement and conditions. 2. Application 20/P1672 be GRANTED Listed Building Consent subject to conditions.
NORTHGATE SE GIS Print Template
25 1
1 to 7
32 37 25 13 1
40 NE RO RO AD AD AD AD ROAD 2 DANE DA DA DA DA DA NE RO NE RO 1
38 24 3
8 14 2 5 4
Lovell H
42 44 AB A A A ABB BB B BB B BE BE B BE 6
EY E E EY Y YYRO ouse 8
R 7
R R ROO O OA A A AD A AD 9
D D D D 12
11 10
Works El Sub St
2 40 14 a
24 38 70 72
1 to 9 Kelmscott 7
House STATION STATION STATION STATION ROAD STATION STATION ROAD ROAD 27 14.8m 14.9m Priory Wall
Martin Harknett Hse orks Wall W Abbey
WAAY AYY Y Y Y TU T UN UNNW N N W W WAA AAN ANNT T T T U U U
rd Bdy ME M ER ERR R RA R ANN M M M E E
Wa Boro Const & FB
Depot
14.3m
El 21 Riverside Sub Sta Business Park Drain
1 to 28
Depot 19
Works 17
This material has been reproduced from Ordnance Survey digital map data with the permission of the controller of Her Majesty’s Stationery Office, © Crown Copyright.
Page 97 DANE ROAD
ABBEY ROAD STATION ROAD
HIGH PATH Page 98
UN WAY MERANT
1:500@A1
0m 10m 20m 50m 100m
Revisions Notes Client N P1 22/04/2020 Issued for Planning indigoScott Project Project Number a r c h i t e c t s Abbey Wall Works 319 75 Maltings Place . 169 Tower Bridge Road . London . SE1 3JB +44 (0) 207 3787 007 [email removed] www.owal.london
Drawing Title Status Drawn Checked
Proposed Block Plan Planning HT TW Information contained within this drawing is the sole copyright of OWAL Architects Scale Date Ltd. and is not to be reproduced without express permission. No implied licence 1:500@A1 09/04/20 exists. This drawing not to be used for land transfer or valuation purposes. All Drawing Number Revision dimensions & levels are to be checked on site by the contractor. Issued for purposes indicated only. Drawing errors and omissions to be reported to the architect. 319_BP-01 1 STATION ROAD
AMENITY AMENITY 2 BIKES (VISITORS) 5 sq.m AMENITY 7 sq.m 7 sq.m
INING AMENITY L IVING / D BEDROOM 2 / DINING KITC H E N / 8 sq.m BATHROOM / LIVING MASTER 30 sq.m 4 sq.m 8 sq.m KITCHEN sq.m BEDROOM 2 BEDROOM 32 13 sq.m 13 sq.m BEDROOM 2 BEDROOM 2 sq.m 13 sq.m STORE 3 12 sq.m BATHROOM POST BOXES
BINS KITCHEN / LIVING / KITCHEN / BINS BEDROO M BINS 4 sq.m 3B/5P MASTER L ELECTRICA STORE LIVING / DINING (4) RISER
DINING
POST BOXES (8) STUDIO 90sq.m 13 sq.m M2 (8) 2.5 sq.m 27 sq.m 27 sq.m BEDROOM 3 GAS
BEDROO 2B/4P WATER RISER RISER
38sq.m MASTER BEDROOM 10 sq.m 13 .m s q 71sq.m STORE 12 sq.m CIAL 2.5 sq.m
COMMER BATHROOM 16 BIKES 3B/5P WATER ELECTRICAL RISER
AMENITY RISER GAS RISER
6 sq.m (DOUBLE 87sq.m 204sq.m 22 sq.m 2B/4P STACKED) Page 99
71sq.m BATHROOM AOV 4 BIKES 4 sq.m BATHROOM 4 sq.m sq.m (SHEFFIELD STORE 4 STORE STAND) AOV 2 sq.m BATHROOM 2 BIKES 5 sq.m (SHEFFIELD 4 BIKES 2B/3P (SHEFFIELD 2B/4P 61sq.m MASTER BEDROOM STAND) KITCHEN / LIVING / 15 sq.m STORE 76sq.m BATHROOM STANDS) DINING 2.5 sq.m 4 sq.m MASTER BEDROOM 27 sq.m KITCHEN / LIVING / DINING 12 sq.m L ELECTRICA RISER
25 sq.m BEDROOM 2 T GAS
DISTRIC RISER
FUTURE 8 sq.m HEATIN G WATER RISER
TION CONNEC MASTER BEDROOM + PV 36 BIKES 40 BIKES 14 sq.m FUTURE ORAGE STORE (DOUBLE STACKED) BATTE R Y S T 2B/4P BEDROOM 2 N 2.5 sq.m AMENITY LOCATIO 73sq.m 12 sq.m 4 sq.m / / LIVING AOV KITCHEN AMENITY DINING 7 sq.m OM 27 sq.m AMENITY BATHRO 17 sq.m 6 sq .m OM BATHRO 4 s q .m STORE / LIVING / 2.5 sq.m KITCHEN 2B/4P M2 DINING BEDROO 72sq.m M 14 sq.m AMENITY 27 sq.m BEDROO MASTER 14 sq.m 13 sq .m
AMENITY M2 8 sq.m BEDROO M BEDROO 12.5 .m s q MASTER 13 sq.m
T UN WAY M E R AN AMENITY 7 sq.m
1:100@A0
0m 2m 5m 10m 20m
Revisions Notes Client N P1 22/04/2020 Issued for Planning indigoScott P2 01/07/2020 Update to unit 0.05 Project Project Number a r c h i t e c t s Abbey Wall Works 319 75 Maltings Place . 169 Tower Bridge Road . London . SE1 3JB +44 (0) 207 3787 007 [email removed] www.owal.london
Drawing Title Status Drawn Checked
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Abbey Wall Works AppendicesReport | 20 MB | DownloadRead as text |
PDF |
Abbey Wall Works, Station Road, Colliers Wood, SW19 2LPReport | 620 KB | Download |
Follow Development and Planning Applications Committee at Merton and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 30 Jul 2026 | Minutes of the previous meetingThat the minutes of the meeting held on 18 June 2026 are agreed as an accurate record. | Agreed | Open |
| 18 Jun 2026 | Minutes of the previous meetingThat the minutes of the meeting held on 22 nd January 2026 are agreed as an accurate record. | Agreed | Open |
| 18 Jun 2026 | Confirmation of an immediate Article 4 Direction for Houses in Multiple Occupation in 13 wards (HMO) following public consultationThat the Committee AGREED the report. | Agreed | Open |
| 22 Jan 2026 | Minutes of the previous meetingThat the minutes of the meeting held on 27 th November 2025 are agreed as an accurate record. | Agreed | Open |
| 27 Nov 2025 | Minutes of the previous meetingThat the minutes of the meeting held on 25 September 2025 are agreed as an accurate record. | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.