CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Merton
Merton and Sutton Joint Cemetery Board, Tuesday 27 February 2024 at 2.00pm

Waiting Room and Welfare Upgrade Costed Proposal

Noted Committee 1 paper

Merton and Sutton Joint Cemetery Board noted this item on Tuesday 27 February 2024. Below is the council's own wording, with the papers it was decided on.

Item6

Resolved

It was RESOLVED that the Board noted and commented on the report
Word for word from the decision Merton published for this meeting. Source: democracy.merton.gov.uk

Follow this further

Built from Merton's papers

What the report saysPro

Report to Merton and Sutton Joint Cemetery Board

Agenda Item 6

BRIEFING NOTE To: MSJC Chair and Board Members Cc: Zoe Church Subject: MSJC Garth Road Perimeter Boundary Fence Line Piers and Wall Line Capital Upgrade Works. Date: 27/02/2024

MSJC Public Welfare and Waiting Room Upgrade Project

INTRODUCTION The current welfare and waiting room facilities at the MSJC are tired, thermally inefficient and require modernisation and refurbishment. The building is structurally sound and the roof fit for purpose. This report details the intended refurbishment and the associated costs. At the board meeting this report will be accompanied by a presentation with mood boards so that the intended refurbishment can be visualised.

BUILDING EXTERIOR The current building mirrors the Lodge in its style and general appearance. It is imperative this is kept. The replacement windows, whilst double glazed and constructed of UPVC will replicate the current Georgian design of the present windows and will visually look as to be made of wood.

• External wood work is to be sanded back and varnished in natural light finish. • The floodlight is to be replaced with a period replica with a copper effect finish. • All metal and brickwork is to remain untouched

Page 11 MAIN ROOM It is proposed that all benching be carefully removed and all exposed wiring and fuse cupboards be boxed in. All walls are to be dry lined and thermally insulated. All walls be plastered and painted in a neutral colour. It is proposed this be Gardenia. The concrete ceiling is to be supported by a bespoke fitted heavy timber frame and a false ceiling created which again will be insulated and dry lined. This will accommodate sunken spotlights. All wood work, including doors, benches and flooring is to be sanded and varnished again in a natural light finish. An L shaped counter to the right of the fire place is to be constructed in a manner that mirror the design of the internal doors. Behind this will be shelving, a sink and power sockets to facilitate a small café venture. To facilitate this an electric boiler which will feed hot water to the entire building is to be installed. In addition smoke detectors and a new fuse board are to be installed to ensure compliance and H&S standards are adhered to All benches with the exception to the area above will be reinstalled. The café owner will need to source the appropriate furniture for this room. The outcome will be a crisp, thermally efficient, bright and light modern facility but with an emphasis on its original features.

The technical specification for this element is as follows -

• Sand and stain parquet • Boxing in for electricals • Remove left/right side bench; • Sanddown left hand side bench and re-varnish;Floor protection; • Frame out/Ceiling/Insulate /Plasterboard/Plaster; Plasterboard insulation for walls; • L-shaped food/beverage counter; • Clean fireplace; • Windows; • Electrical; • Strip/repaint double front doors; • Interior re-decoration.

Page 12 MENS TOILETS Again this is an area with potentially highly attractive original features. To this end the urinals and floor are to be retained but cleaned to an industrial high standard. All grouting, pointing and metal work is to be replaced. The latter will be period correct in chrome. All wall tiling are to be removed, cabling and pipework chased and the appropriate retiled with white period correct brick ceramic tiles. A false ceiling is to be created to mask any pipework and to house discreet spotlighting. Existing wood work is to be sanded and painted in white. The toilets and sink are to be replaced with period correct white porcelain units with chrome metalwork. The sink will have hot and cold running water. Electric heaters are to be installed to maintain a comfortable ambient temperature when required. The area will again have a sharp but classical appearance but importantly will be warm, easy to maintain and welcoming The technical specification for this element is as follows -

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Waiting Room and Welfare Upgrade Costed ProposalAppendix 232 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

7 of 13 attended
PC
Councillor Paul ColeCommittee Member, present
AM
Agatha Mary Akyigyina OBECommittee Member, present
SB
Sheri-Ann BhimCommittee Member, present
JW
James WilliscroftCommittee Member, present
HB
Hina BokhariCommittee Member, apologies
MP
Michael PatersonCommittee Member, present
RB
Councillor Rob BeckCommittee Member, present
SC
Councillor Sam CumberCommittee Member, present
TO
Test OfficerCouncil Staff, expected
ZC
Zoe ChurchOfficer, in attendance
HJ
Howard JoyOfficer, expected
AK
Andrew KauffmanOfficer, in attendance

All 13 on the meeting page

More from Merton Merton and Sutton Joint Cemetery Board

All decisions
MeetingDecisionOutcome
4 Mar 2026 Client Side ReportIt was RESOLVED that the Board: Reviewed and approved the council client side report as an accurate representation of... Approved Open
24 Jun 2025 Appointment of Chair and Vice ChairIt was RESOLVED that Cllr Joan Henry was appointed Chair of the Merton Sutton Joint Cemetery Board, and Cllr Rob Beck... Decided Open
24 Jun 2025 Minutes of the Previous MeetingIt was RESOLVED that the minutes of the meeting of 25 February 2025 werea true and accurate record. Decided Open
24 Jun 2025 Client ReportIt was RESOLVED that the report was noted by the Board. Noted Open
24 Jun 2025 Contractor ReportIt was RESOLVED that the report was noted by the Board Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies