Resolved
RESOLVED that this application be deferred until the next meeting to allow for the presentation to be received in full. (Proposed by the Chairman) Notes -: (i) Cllr R L Stanley declared a personal interest as Cabinet Member for Housing; (ii) Cllr D J Knowles declared a personal interest as a Member of the British Legion; (iii) Cllr K D Wilson declared a personal interest as he had been in discussion with local residents and the British Legion as Ward Member; (iv) Cllrs M D Binks, [name removed], [name removed], P J Heal, D J Knowles, E G Luxton, R F Radford, J D Squire, [name removed], R L Stanley, K D Wilson and P F Williams made declarations in accordance with the Protocol of Good practice for Councillor dealing in planning matters as they had received correspondence regarding this application; (v) The following late information was reported Amendments / clarification to report: The upper parking deck area provides 9 spaces. Parking on the two levels is connected with the lower development area by a lift / stair tower. In addition the upper area connects with an entrance to the apartment building on the second floor. Finished floor level is 63.3m and above the minimum advised in the flood risk assessment of 61.5m AOD. Additional information received from the applicant’s drainage consultant in response to representations: Surface water drainage. It was recognised that flood risk would occur when the river levels reach approximately 61.00mAOD as this would leave the flap valves unable to open. If a rainfall event occurs in conjunction with this high water level in the river then the developments’ system would be unable to operate. Discussions with the Environment Agency indicated that the river levels could keep the flaps closed for up to 9 hours. A storm generating approximately 4.0mm rain/hour for a 9 hour period would generate the need for 75,600 litres of storage (75.6m3). This provision has been made by placing two storage tanks measuring 20x4x0.55m (83.6m3) adjacent to the building. It has been agreed with the Environment Agency that the probability of these two storm events occurring simultaneously is high enough and consequently, the WSP Surface Water drainage proposals provides a sufficiently robust solution to ... view the full minutes text for item 159.