RESOLVED that: a. The draft Landscape Implications of Solar Energy Proposals Supplementary Planning Document be submitted for public consultation. b. Delegated authority be given to the Head of Planning and Regeneration in consultation with the Cabinet Member for Planning and Economic Regeneration to finalise consultation material. (Proposed by Cllr R L Stanley and seconded by Cllr C R Slade) Note: *Report previously circulated, copy attached to minutes.
Word for word from the decision Mid Devon published for this meeting.Source: democracy.middevon.gov.uk
Landscape Implications of Solar PV Proposals – Supplementary Planning Document
Prepared for Mid Devon District Council by LUC
January 2016 Project Title: Landscape Implications of Solar PV Proposals –Supplementary Planning Document
Client: Mid Devon District Council
Version Date Version Details Prepared by Checked by Approved by Director
V0.1 08/05/15 First Draft AK/SP/SY/RK SP/RK SY
V1.0 24/6/15 Wind and solar draft SPD AK/SP/SY SP/SY SY for client comments
V2.0 08/01/16 Change to solar-only SPD Sally Parker Sarah Young Sarah Young following Government policy changes Contents
1 Introduction 1 What is the purpose of SPD? 1 Why is the SPD needed? 1 Who is the SPD for? 2 How was the SPD prepared? 2 What are the limitations of the SPD? 3 What does the SPD cover? 4
2 Context 5 Introduction 5 Policy context 5 Main characteristics of solar PV developments and how they might impact on the landscape 8 Free-standing solar photovoltaic (PV) developments 8
3 The landscapes of Mid Devon 10 Introduction 10 Brief summary of key landscape variations across the District 10 Landscape Character Assessment framework 10
4 Method for undertaking the landscape sensitivity assessment 14 Introduction 14 Spatial and descriptive framework 14 Scale of solar PV developments considered 14 Comparable features for solar PV developments 15 Evaluating landscape sensitivity 17 Assessment criteria 17 The discussion on landscape sensitivity 21 Judging landscape sensitivity to different sizes of development 22 Presentation of results 22
5 Strategic patterns of landscape sensitivity across Mid Devon 23 Introduction 23 Observations on landscape sensitivity across Mid Devon 23 Summary conclusions for siting and designing solar PV developments within Mid Devon 27
6 How to consider landscape in planning applications for solar PV developments 33 Introduction 33 Cumulative Landscape and Visual Impact Assessment (CLVIA) 38
Appendix 1: Summary of responses to the SPD Scoping Consultation
Appendix 2: Devon Character Area Summaries
Appendix 3: Detailed Landscape Character Type Assessments 1 Introduction
What is the purpose of SPD? 1.1 This SPD provides guidance on:
key landscape issues associated with solar photovoltaic (PV) developments;
relative landscape sensitivities of different areas within Mid Devon to solar developments (through a specific landscape sensitivity assessment1);
good siting and design of solar PV schemes including guidance on how potential impacts could be minimised;
landscape information which developers should provide when submitting an application for a solar PV development.
1.2This SPD has been prepared in accordance with Part 5 of the Town and Country Planning (Local Planning) (England) Regulations 2012. The SPD does not form part of the Development Plan but is a material consideration in the determination of solar planning applications in the area. It adds further detail to the policies of the Mid Devon Local Plan Review 2013-2033 (Proposed Submission Draft – February 2013) which include:
Policies S9 – Environment, S14 - Countryside, DM1 – High Quality Design, DM2 – Renewable and low carbon energy and DM27 - Protected Landscapes.
1.3The guidance covers a range of different scales of solar PV developments (definitions of the different scales of these developments are provided in Chapter 4). Developments above 50MW are currently determined by the National Infrastructure Directorate of the Planning Inspectorate on behalf of the Secretary of State. The Council are a consultee on applications determined under this process and this SPD will be used to help formulate the Council’s formal response to such proposals.
1.4Domestic or commercial roof top solar panels are not specifically covered in this SPD as they do not require planning permission, as long as specified limits and conditions of permitted development rights are met2.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
2027/28 Draft Budget Update (00:04:00)RESOLVED that: 1. The proposed approach to balancing the 2027/28 General Fund and Housing Revenue Account budget gaps...
Minutes of the Previous MeetingThe minutes of the previous meeting held on 07 July 2026 were APPROVED as a correct record and SIGNED by the Leader. ...
2026/27 Budget Monitoring- Quarter 1The Cabinet had before it a report * from the Deputy Chief Executive (S151) on the 2025/26 Budgeting Monitoring quart...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.