RESOLVED that: i) That the document at Appendix 1 is approved for public consultation. ii) That delegated authority be given to the Director of Place in consultation with the Cabinet Member for Planning and Economic Regeneration to finalise the consultation material. (Proposed by Cllr R J Chesterton and seconded by Cllr B A Moore) Reason for the decision : the existing adopted masterplan is out of date, there is a need for a new masterplan to be approved for public consultation. Note : *Report previously circulated, copy attached to minutes.
Word for word from the decision Mid Devon published for this meeting.Source: democracy.middevon.gov.uk
North West Cullompton Masterplan Supplementary Planning Document
April 2022 Foreword
This Supplementary Planning Document (SPD) is an update to the North West Cullompton Urban Extension Masterplan SPD adopted in 2016 (the 2016 Masterplan SPD).
The Mid Devon Local Plan Review 2013-2033 adopted on 29 July 2020 revised the local planning policies for the NW Cullompton urban extension and allocated two new parcels of land. The relevant policies in the Local Plan are policies CU1 to CU6.
This SPD has been prepared in response to the new local planning policies in the Mid Devon Local Plan and has been informed by survey work and analysis, and consultation with key stakeholders and people in the local community.
The document provides guidance about how the urban extension should be designed and developed. It does not introduce new policies or allocate new parcels of land, but adds detail to the existing policies and allocations in the Mid Devon Local Plan.
This SPD is an update to the 2016 Masterplan SPD only and the changes are limited to those necessary to reflect existing changes to Local Plan policies, and to ensure consistency with planning permissions already granted on the NW Cullompton Urban Extension.
Report number Status Date Revision Author / checked
220119 R 01 SPD April 2022 - DE Contents
Setting the Scene Achieving a Quality Place Appendix A
1.0Introduction 3.0 Development, Vision and Concept 6.0 Factors Shaping Development 1.1 Introduction 3.1 The Vision 6.1 Scope and Extent 1.2 The Purpose and Role of the Document 3.2 Development Concept 6.2 Cullompton Wide Connectivity 1.3 Planning Policy Context 3.3 Guiding Principles 6.3 Access and Movement 1.4 The Supplementary Planning Document 6.4 Facilities and Amenities 1.5 Consultation 4.0 Creating the Structure 6.5 Visual Sensitivity 1.6 Stakeholder Workshop Feedback 4.1 Masterplan 6.6 Topography 1.7 Design Process 4.2 Amount and Land Use (Land Budget) 6.7 Green Space and Ecology 4.3 Densities 6.8 Hydrology 2.0 About the Site 4.4 Movement 6.9 Utilities 2.1 The Site and it's Location 4.5 Landscape and Open Space 6.10 Cultural Heritage 2.2 Land Control 4.6 Drainage Strategy 6.11 Character and Building Traditions 2.3 Site Constraints & Opportunities 4.7 Character Assessment
5.0Delivering the Place Appendix B 5.1 Infrastructure Planning and Delivery 7.0 Consultations 5.2 Housing Delivery 5.3 Phasing 7.1 First Round Public Consultation
5.4Construction of Road Infrastructure 7.2 Second Round Public Consultation
5.5Infrastructure Requirements 5.6 Monitoring and Review 5.7 Requirements of Future Planning Applications
Contents 3 1.0 Introduction Setting the Scene 5 1.0 Introduction Setting the Scene
The NW Cullompton Masterplan was adopted as a Supplementary Planning Document (SPD) in February 2016.
The 2016 Masterplan set out a detailed plan for the majority of the NW Cullompton urban extension as allocated by policy AL/CU/1 of the Mid Devon Allocations and Infrastructure Development Plan Document (adopted October 2010). The policy allocated an area of 74.8 hectares for 1100 dwellings 1 and 40,000 square metres of employment floor space, which was revised in the 2016 masterplan to 1120 dwellings and 10,000 square metres of employment floor space, following additional evidence becoming available.
An area of land of approximately 5 hectares in the south west of the site was excluded from the 2016 Masterplan as no survey and design information was available at the time for this land parcel. This parcel is now included.
The Mid Devon Local Plan Review 2013-2033 was adopted on 29 July 2020. The Plan sees Cullompton as a fast growing market town which will become the principal focus of development for the district in the medium to long term. 2 In addition to land already allocated, policy CU1 of the Local Plan Review allocates two further parcels of residential land bringing the total allocation to 100 hectares with 1350 3 dwellings and 10,000m² of employment floor space.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
2027/28 Draft Budget Update (00:04:00)RESOLVED that: 1. The proposed approach to balancing the 2027/28 General Fund and Housing Revenue Account budget gaps...
Minutes of the Previous MeetingThe minutes of the previous meeting held on 07 July 2026 were APPROVED as a correct record and SIGNED by the Leader. ...
2026/27 Budget Monitoring- Quarter 1The Cabinet had before it a report * from the Deputy Chief Executive (S151) on the 2025/26 Budgeting Monitoring quart...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.