RESOLVED that planning permission be granted subject to conditions. (Proposed by Cllr G Cochran and seconded by Cllr G Duchesne) Notes:- (i) Cllr N Letch abstained from voting (ii) Olivia Ambrose spoke as the Applicant (iii) Cllr N Letch ... view the full minutes text for item 30.
Word for word from the decision Mid Devon published for this meeting.Source: democracy.middevon.gov.uk
The application seeks planning permission for the demolition of Cross Hotel main building, at the Cross Hotel, Copplestone. The site is located centrally within Copplestone at the junction of Bewsley Hill with the A377, close to Copplestone Cross. The existing public house is a substantial two storey building with its south west elevation fronting the A377 highway. To the rear there are adjoining outbuildings and a two storey barn (former skittle alley). To the front of the skittle alley building, and side of the pub there is an open hardstanding car park area which is enclosed by a short length of stone wall along the frontage and adjacent to the vehicular access point. The site is surrounded by existing residential development, the village shop is located to the north west of the site.
The Cross Inn, Copplestone is currently derelict, being a closed Free House pub. The walls of the building are constructed using a traditional cob (mud and straw) building material with suspended timber floors and a roof constructed using traditional A-frame trusses, purlins and rafters. Through the submission of the previous planning application 21/01413/FULL, it was outlined that the proposed public house ceased regular trading in July 2017 but had since only opened on an occasional ad-hoc basis.
The applicant has outlined that during the discharging of conditions for planning permission 21/01413/FULL during August 2024 they experienced a bulging in the wall between gable end and the left front lower window and from this point in time, the applicant has been working with and complying to requirements from the local highway authority (DCC) and NMD building control. The small partial cob wall fail led to the temporary closure of the A377 for three weeks whilst structural safety scaffolding was put in place and to enable repair works to occur. This work started on 1st September 2024 and firstly involved clearing the unsafe and unstable sections as part of the making safe works, entailing the eventual removal of the south (carpark side) gable end and this extended a further 4 meters on the west elevation (A377 side) because the cob was unstable and weak.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.