CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Monmouthshire County Council
Individual Cabinet Member Decisions, Wednesday 11 July 2018 at 5.00pm

FLOOD AND WATER MANAGEMENT ACT 2010 - SCHEDULE 3 - IMPLEMENTATION OF THE SUSTAINABLE DRAINAGE SYSTEMS (SUDS) APPROVING BODY (SAB)

Approved Executive 1 paper

Individual Cabinet Member Decisions approved this item on Wednesday 11 July 2018. Below is the council's own wording, with the papers it was decided on.

Item2

Resolved

To consider the requirement to establish the SAB and approve the additional self-funded posts, which will allow Monmouthshire County Council to deliver this new statutory function and keep the relevant local engineering knowledge and expertise within the Authority.
Word for word from the decision Monmouthshire published for this meeting. Source: democracy.monmouthshire.gov.uk

Follow this further

Built from Monmouthshire's papers

What the report saysPro

Report to Individual Cabinet Member Decisions

Recommendations

2.1To consider the requirement to establish the SAB and approve the additional self- funded posts, which will allow Monmouthshire County Council to deliver this new statutory function and keep the relevant local engineering knowledge and expertise within the Authority.

3. KEY ISSUES:

3.1Monmouthshire County Council are a Lead Local Flood Authority (LLFA) under the terms of the Flood and Water Management Act 2010 and are responsible for what are termed local flood risks. These include the risks of flooding from ordinary watercourses, surface water and ground water.

3.2Surface water flooding poses an ever greater threat to our communities and has been identified in the National Strategy for Flood and Coastal Erosion Risk Management as one of the three main sources of flood risk, along with seas and rivers. The impact on citizens and communities can be devastating and the cost to the Welsh economy significant. The risk of flooding is on the rise owing to climate change and urbanisation. In particular, local flooding due to the overloading of volume constrained drainage systems and sewers is of increasing concern.

3.3Surface water can be effectively managed to reduce flood risk by Sustainable Drainage Systems (SuDS). SuDS systems are alternative drainage systems to the more traditional piped systems, designed to mimic natural drainage in order to control the peak flow rate and volume of surface water runoff from a site through interception, attenuation and infiltration (where feasible), helping to reduce flood risk. Typical SuDS features include but are not limited to green roofs, water butts, swales, detention basins, attenuation ponds and permeable paving. 3.4 Current drainage designs, particularly on new developments, often fail to deliver multiple benefits (for example, amenity, biodiversity and water quality) and offer only simple surface water management. 3.5 Schedule 3 of the Flood and Water Management Act 2010 requires surface water drainage systems for new developments to comply with new mandatory National Standards for SuDS in Wales. These Standards will cover the design, construction, operation and maintenance of SuDS. It also requires surface water drainage systems to be approved by a SuDS Approving Body (SAB) before construction work with drainage implications may begin. Provided the National Standards are met, the SAB would be required to adopt and maintain the approved SuDS that serve more than one property. This can remove uncertainty over the design and adoption of surface water drainage systems which previously hampered new developments. 3.6 Schedule 3 introduces a new statutory requirement for a SAB to be established by Local Authorities to manage surface water within future development. Under the Act, most types of construction work with drainage applications will require SAB approval. Schedule 3 specifies that construction work means the creation of buildings or other structures that cover land and which will affect the ability of the land to absorb rainwater.

3.7With the exception of single dwellings, all construction work requiring planning permission which has drainage implications should need approval. For example, construction of two houses or a factory would require planning permission and has drainage implications and therefore needs approval. Planning applications with no drainage implications would not need SAB approval.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
FLOOD AND WATER MANAGEMENT ACT 2010: SCHEDULE 3: IMPLEMENTATION OF THE SUSTAINABLE DRAINAGE SYSTEMS (SUDS) APPROVING BODY (SAB)Report 196 KB DownloadRead as text

At this meeting

Whole meeting
1RECRUITMENT OF BSSG ADMIN OFFICERApproved
2FLOOD AND WATER MANAGEMENT ACT 2010 - SCHEDULE 3 - IMPLEMENTATION OF THE SUSTAINABLE DRAINAGE SYSTEMS (SUDS) APPROVING BODY (SAB)This decision

Who was there

0 of 20 attended
CC
County Councillor Peter FoxCommittee Member, expected
CC
County Councillor Bob GreenlandCommittee Member, expected
CC
County Councillor Richard JohnCommittee Member, expected
CC
County Councillor Bryan JonesCommittee Member, expected
CC
County Councillor Penny JonesCommittee Member, expected
CC
County Councillor Sara JonesCommittee Member, expected
CC
County Councillor Phil MurphyCommittee Member, expected
CC
County Councillor Paul JordanCommittee Member, expected
TH
Tracey HarryOfficer, expected
PD
Peter DaviesOfficer, expected
RH
Roger HogginsOfficer, expected
MH
Mark HowcroftOfficer, expected

All 20 on the meeting page

More from Monmouthshire Individual Cabinet Member Decisions

All decisions
MeetingDecisionOutcome
18 Nov 2026 LOCAL GOVERNMENT (WALES) ACT 1994 THE LOCAL AUTHORITIES (PRECEPTS) (WALES) REGULATIONS 1995 - Proposed Payment ScheduleThat the following schedule of payments be proposed pending consultation: (i) The Police Authority precept is paid fr... Decided Open
18 Nov 2026 Award of General Building Maintenance FrameworkTo approve the procurement and award of the General Building Maintenance Framework in respect of Lot 1, General Build... Approved Open
21 Oct 2026 Welsh church fund working groupThat grants are awarded as per the schedule of applications. Decided Open
21 Oct 2026 Monmouthshire county council's planning service's annual performance report (apr)To note the contents of the Annual Performance Report for submission to the Welsh Government and recommend the APR fo... Noted Open
21 Oct 2026 Annual health and safety report 2025/26That the Council’s Annual Health and Safety Report 2025/26 is approved, including the health and safety priorities fo... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies