FLOOD AND WATER MANAGEMENT ACT 2010 - SCHEDULE 3 - IMPLEMENTATION OF THE SUSTAINABLE DRAINAGE SYSTEMS (SUDS) APPROVING BODY (SAB)
ApprovedExecutive1 paper
Individual Cabinet Member Decisions approved this item on Wednesday 11 July 2018. Below is the council's own wording, with the papers it was decided on.
To consider the requirement to establish the SAB and approve the additional self-funded posts, which will allow Monmouthshire County Council to deliver this new statutory function and keep the relevant local engineering knowledge and expertise within the Authority.
Word for word from the decision Monmouthshire published for this meeting.Source: democracy.monmouthshire.gov.uk
2.1To consider the requirement to establish the SAB and approve the additional self- funded posts, which will allow Monmouthshire County Council to deliver this new statutory function and keep the relevant local engineering knowledge and expertise within the Authority.
3. KEY ISSUES:
3.1Monmouthshire County Council are a Lead Local Flood Authority (LLFA) under the terms of the Flood and Water Management Act 2010 and are responsible for what are termed local flood risks. These include the risks of flooding from ordinary watercourses, surface water and ground water.
3.2Surface water flooding poses an ever greater threat to our communities and has been identified in the National Strategy for Flood and Coastal Erosion Risk Management as one of the three main sources of flood risk, along with seas and rivers. The impact on citizens and communities can be devastating and the cost to the Welsh economy significant. The risk of flooding is on the rise owing to climate change and urbanisation. In particular, local flooding due to the overloading of volume constrained drainage systems and sewers is of increasing concern.
3.3Surface water can be effectively managed to reduce flood risk by Sustainable Drainage Systems (SuDS). SuDS systems are alternative drainage systems to the more traditional piped systems, designed to mimic natural drainage in order to control the peak flow rate and volume of surface water runoff from a site through interception, attenuation and infiltration (where feasible), helping to reduce flood risk. Typical SuDS features include but are not limited to green roofs, water butts, swales, detention basins, attenuation ponds and permeable paving. 3.4 Current drainage designs, particularly on new developments, often fail to deliver multiple benefits (for example, amenity, biodiversity and water quality) and offer only simple surface water management. 3.5 Schedule 3 of the Flood and Water Management Act 2010 requires surface water drainage systems for new developments to comply with new mandatory National Standards for SuDS in Wales. These Standards will cover the design, construction, operation and maintenance of SuDS. It also requires surface water drainage systems to be approved by a SuDS Approving Body (SAB) before construction work with drainage implications may begin. Provided the National Standards are met, the SAB would be required to adopt and maintain the approved SuDS that serve more than one property. This can remove uncertainty over the design and adoption of surface water drainage systems which previously hampered new developments. 3.6 Schedule 3 introduces a new statutory requirement for a SAB to be established by Local Authorities to manage surface water within future development. Under the Act, most types of construction work with drainage applications will require SAB approval. Schedule 3 specifies that construction work means the creation of buildings or other structures that cover land and which will affect the ability of the land to absorb rainwater.
3.7With the exception of single dwellings, all construction work requiring planning permission which has drainage implications should need approval. For example, construction of two houses or a factory would require planning permission and has drainage implications and therefore needs approval. Planning applications with no drainage implications would not need SAB approval.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Individual Cabinet Member Decisions at Monmouthshire and we tell you when its next papers are published, before the meeting rather than after it.
Annual health and safety report 2025/26That the Council’s Annual Health and Safety Report 2025/26 is approved, including the health and safety priorities fo...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies