Highway Structures Asset Protection and Maintenance

Noted Executive 1 paper

Streetscene and Engineering Cabinet Board noted this item on Tuesday 6 March 2018. Below is the council's own wording, with the papers it was decided on.

Item11

Resolved

That the report be noted.
Word for word from the decision Neath Port Talbot published for this meeting. Source: democracy.npt.gov.uk

Follow this further

Built from Neath Port Talbot's papers

What the report saysPro

Report to Streetscene and Engineering Cabinet Board

Purpose of report

1 To update Members of progress on the County Bridge Assessment, Strengthening and Maintenance Programme and the implementation of the Code of Practice for the Management of highway structures, footbridges and other public rights of way.

2 The management of landslips and carriageway edge failures.

3 The Management of Tips.

Executive summary

3 This report provides an update on the progress in this important area and sets out the challenges to be addressed if the County’s Highway Structure Assets are to be maintained in an appropriate condition in accordance with the Code of Practice and the standards set down in the Highways Asset Management Plan.

Background

4 Members will recall the County Bridge Strengthening Report and Presentations to the Environment & Highways Scrutiny Committee in December 2015 highlighting ‘at-risk’ structures and a programme of future management.

5 This report provides the current status, highlighting emerging liabilities affecting highway structures. Progress Report on Bridge Assessment and Strengthening

6 In summary, the introduction of the 40 Tonne Truck to the Highway Network in 1999 prompted the assessment of 209 highway structures built before 1973.

Since December 2015; Six bridges were strengthened in 2015/16 Eight bridges were strengthened in 2016/17 Three bridges were strengthened in 2017/18

7 Overall, up to the end of December 2017 of the 195 no. assessments carried out (Appendix A):-

 35 bridges passed the assessment.

 133 bridges originally failed their assessment, and have been strengthened, to meet current Highway Loading Standard requirements.

 20 bridges are designated as sub-standard and are currently unable to sustain the current Highway Loading Standard and require strengthening or replacement.

 Five Structures are programmed to be strengthened as part of the rolling programme 2018/19.

 There are 25 outstanding bridge assessments. These will be completed by April 2020, subject to resources. In general they are smaller bridges on unclassified roads and do not represent a major risk (Appendix B).

Management of Sub-Standard Structures

8 A routine inspection process is in place to monitor all substandard bridges. Assessment pro-formas for all sub-standard bridges are updated in accordance with the latest Design Code (BD 79/06 – The Management of Sub-Standard Highway Structures).

9 The 25 outstanding bridges that require assessment have been added to the monitoring list. Other Bridges Issues

10 There are a number of actions to be implemented in accordance with the Code of Practice for the Management of Highway Structures as follows:

i) Complete the survey of existing retaining walls.

a) Update the system to record all new walls and structures built by private developers;

Preparation is ongoing. Adoption, maintenance liabilities, commuted sums and approved construction types are issues to be resolved. It is important to ensure that the Authority does not take on additional liabilities from developers without adequate funding to deal with the additional assets.

b) In accordance with the Code of Practice determine maintenance liabilities for 1,854 retaining walls.

ii) Currently 485 bridges are subject to a general inspection on a two yearly cycle. Of these 50 require specialist access equipment and 135 require diving/confined space equipment in order to carry out a six yearly Principal Inspections.

Subsequently, when routine inspections are delayed there is a risk that issues will become critical before they are noticed. This leads to budgeting difficulties and/or the risk of having to impose restrictions on routes and/or major works being necessary at short notice.

If the current inspection regime continues then it would be prudent to budget for a sizeable contingency sum in the Capital Programme.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Highway Structures Asset Protection and MaintenanceReport 610 KB DownloadRead as text

More from Neath Port Talbot Streetscene and Engineering Cabinet Board

All decisions
MeetingDecisionOutcome
28 Jan 2022 Appointment of ChairpersonAgreed that Councillor M.Harvey be appointed Chairperson for the meeting . Agreed Open
28 Jan 2022 Minutes of Previous MeetingThat the Minutes of 17 December 2021, be approved. Approved Open
28 Jan 2022 Traffic Regulation Orders - GlynneathHaving had due regard to the integrated impact assessment, approval be granted to advertise the B4242 Pontneathvaugha... Approved Open
28 Jan 2022 Traffic Regulation Orders – Tonna and AberdulaisHaving had due regard to the integrated impact assessment, the objections to the B4434 Dulais Fach Road, Station Road... Decided Open
28 Jan 2022 New Post Code for Bro Nantfer in Gwaun Cae GurwenHaving due regard to the first stage integrated impact assessment, residents of Bro Nantfer be consulted on whether t... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies