Planning Committee, Tuesday 26 March 2024 at 10.00am

Application Number: P2023/0858 - Crown Wharf, Port Talbot Docks

Decided Planning 1 paper

Planning Committee decided this item on Tuesday 26 March 2024. Below is the council's own wording, with the papers it was decided on.

Item5

Resolved

View the decision text for item 5.
Word for word from the decision Neath Port Talbot published for this meeting. Source: democracy.npt.gov.uk

Follow this further

Built from Neath Port Talbot's papers

What the report saysPro

Report to Planning Committee

Background

This application is a major development proposal accompanied by an Environmental Statement and is reported to the Planning Committee for this reason.

SITE AND CONTEXT

The Site is located within Port Talbot in the Associated British Ports operational docks area and adjoins the Tata Steel industrial area. The site context is shown in Figures 1 and 2.

Page 1 of 87 Figure 1: Site location and surroundings, with proximity to road, rail and sea access. The site is within the Celtic Freeport Area.

Figure 2: Aerial view of Port Talbot showing the site of development.

Given the extent of the Site, it has been split into a number of parcels (linked to their proposed function), as follows (as shown in figure 3):

• Primary parcel of land for the location of the proposed production facility (approximately 9.1ha), comprising bare land adjacent to Crown Wharf (Port Talbot) (referred to as the ‘Production Development Zone [PDZ]’); • Three discrete parcels of land located within the wider Port Talbot Docks, (approximately 7.44ha) (referred to as ‘Temporary Construction Areas [TCA] 1, East and West’). TCA West is separated into two parcels. • Approximately 0.87km of Phoenix Way (port road), running adjacent to the northern boundary of the PDZ; and

Page 2 of 87 • An extent of marine environment of Port Talbot Docks, located to the north of the PDZ and Phoenix Way.

Figure 3: Application plan showing the location of Temporary Construction Areas and the Production Development Zone.

The above terms are used throughout the applicant’s Environmental Statement (ES) and other documents and are adopted for the purposes of this committee report.

The PDZ is currently unused and vacant land which has been colonised by vegetation. At TCA East there are a number of buildings and structures associated with historic and on-going industrial/commercial activities. The applicant notes that a number of these structures are in a poor / unusable condition and vacant. Whilst others support on-going commercial activities / tenants, including a crane hire firm, a welding services company, a scaffolding company and oil tankage facilities. It is understood that these companies are in the process of re-locating locally. TCA 1 and TCA West comprise vacant land colonised by vegetation.

Both the PDZ and TCA1 were ‘created’ as part of the development of Port Talbot Docks in the early 20th Century, with the focus of utilisation as a working dock and has been subject to previous development. The supporting information to the application identifies that the site has a long history of industrial uses and by 1940, the entire site is recorded to have been infilled, with multiple buildings and infrastructure (including railway sidings, tanks, settling tanks, travelling cranes, overhead pipes, chimneys, reservoirs, conveyors, hoppers and Margam Wharf) of the wider Margam (Iron and Steel) Works site. Margam Wharf is shown to be present along the western site boundary. All buildings on the PDZ and TCA1 appeared to have been

Page 3 of 87 demolished as of 2009. TCA West and TCA East also featured significant industrial development.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Application Number: P2023/0858: Crown Wharf, Port Talbot DocksAppendix 2.6 MB DownloadRead as text

At this meeting

Whole meeting

On this subject at Neath Port Talbot

Search all
  1. Application Number: P2023/0858 - Crown Wharf, Port Talbot DocksThis decision
  2. Application Number: 2024/0057 - 18 Darwin RoadDecided

More from Neath Port Talbot Planning Committee

All decisions
MeetingDecisionOutcome
18 Aug 2026 Application No. P2025/0825 - 41 New Road, Skewen, Neath Port Talbot, SA10 6ERView the decision text for item 5. Decided Open
18 Aug 2026 Appeals Received -17.07.26 to 10.08.26View the decision text for item 6. Decided Open
18 Aug 2026 Delegated Decisions - 17.07.26 to 10.08.26View the decision text for item 7. Decided Open
28 Jul 2026 Chairs AnnouncementsView the decision text for item 1. Decided Open
28 Jul 2026 Declarations of InterestView the decision text for item 2. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies