Land Adjacent Apple Cottage, Bilsthorpe Road, Eakring (26/00377/PIP)

Agreed Planning 1 paper

AI summaryNewark and Sherwood Planning Committee approves Permission in Principle for up to 4 homes on open countryside site next to Eakring, despite three neighbour objections.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeAgreed10 votes for, 2 against
MoneyCIL rated £0m2Housing Low Zone 1
What happens nextTechnical Details Consent requiredWithin 3 years of decision
Who it affectsOpen countryside next to Eakring0.39 hectare site, Grade 2 agricultural land

What was decided

Permission in Principle for residential development of between 1 and 4 dwellings was approved, with the second stage (Technical Details Consent) to follow. Report 3.1, 9.2

No conditions can be attached to the Permission in Principle; all detailed matters will be assessed at the Technical Details Consent stage. Report 9.3

Why

The council cannot demonstrate a five-year housing land supply (only 3.84 years), so the tilted balance under NPPF paragraph 11(d) applies in favour of granting permission. Report 7.14, 7.17

The site is in open countryside and Grade 2 agricultural land, with limited services in Eakring, but it is adjacent to the village and benefits from bus links to Bilsthorpe, Clipstone and Mansfield. Report 7.13, 7.18, 7.30

NSDC Conservation raised no in-principle objection to 1 to 4 dwellings, subject to design, scale, massing and materials at the technical stage. Report 6.4, 7.20

What happens next

A Technical Details Consent application must be submitted within three years of the decision, covering design, access, landscaping, ecology, contamination, flood risk and biodiversity net gain. Report 3.3, 7.31, 9.4, P120

Required Technical Details submissions include site and elevation plans, a Preliminary Ecology Assessment, Tree Survey, Contaminated Land Desktop Study, BNG details and a Flood Risk Assessment. Report P120

The money

  • £0m2 CIL rate for residential development in Housing Low Zone 1 Report 7.59

Options considered

  • Chosen: Approve Permission in Principle for 1 to 4 dwellings. Tilted balance engaged due to 3.84 year housing land supply; in-principle location, land use and amount considered acceptable Report 7.14, 7.17, 7.30, 9.2

Implications

  • Environment and climate: Loss of 0.39 hectares of Grade 2 (Very Good) agricultural land, though the wider field remains in use. Report 7.28
  • Other: Potential contamination from previous agricultural use will require a Phase 1 survey at Technical Details stage. Report 7.58
  • Other: Biodiversity Net Gain of at least 10% will be required at the Technical Details stage unless exempt. Report 7.60
  • Risk: Highways have not confirmed access; visibility splays will be required in line with the 85th percentile measured speed. Report 6.2, 7.48
  • Legal: Conditions cannot be attached to a Permission in Principle; they are imposed only on the later Technical Details Consent. Report 9.3

Who and where

  • The applicant (J Meanley), with planning agent Grace Machin Planning & Property Report P4
  • Occupiers of 11 nearby properties, who were notified and three of whom objected Report 4.1, 6.5
  • Eakring Parish Council, which submitted no comments Report 6.3
  • Neighbouring residents of Apple Cottage and the Harrowgate Close development opposite Report 7.44, 7.45

Timeline

  • 13.03.2026: Application form and site location plan submitted Report P19
  • 16.03.2026: Application registered Report P4
  • 18.03.2026: Members' site visit undertaken Report 4.2
  • 20.03.2026: Supporting letter and appeal decision submitted Report P19
  • 2.4.2026: Site notice expired Report 4.1
  • 20.04.2026: Target determination date agreed (EOT) Report P4
  • 07.05.2026: Planning Committee approved Permission in Principle Report P1
  • Within 3 years of decision: Technical Details Consent application must be submitted Report 3.3, P121

Plain English for the jargon

  • Permission in Principle (PIP): A two-stage planning consent that establishes whether a site is suitable in principle for a specified amount of housing, with detailed matters considered later under Technical Details Consent.
  • Technical Details Consent (TDC): The second-stage application that assesses detailed design, access, landscaping and other matters after Permission in Principle has been granted.
  • Tilted balance: The presumption in favour of sustainable development under NPPF paragraph 11(d), triggered when a council cannot demonstrate a five-year housing land supply.
  • Biodiversity Net Gain (BNG): A requirement for development to deliver a measurable improvement in biodiversity, with a minimum 10% gain since February 2024.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item147

Resolved

AGREED (with 10 votes For and 2 votes Against) that Permission in Principle be approved.
Word for word from the decision Newark and Sherwood published for this meeting. Source: democracy.newark-sherwooddc.gov.uk

Follow this further

Built from Newark and Sherwood's papers

What the report saysPro

Report to Planning Committee

Report to: Planning Committee – 07 May 2026 Business Manager Lead: Oliver Scott – Planning Development Lead Officer: Jared Pailing – Planning Development Officer

Report Summary

Application Number 26/00377/PIP

Application for permission in principle for proposed residential Proposal development of a minimum of 1 dwelling and a maximum of 4 Land Adjacent Apple Cottage Location Bilsthorpe Road Eakring Grace Machin Planning & Applicant J Meanley Agent Property 20.04.2026 Registered 16.03.2026 Target Date EOT – 11.5.26

Recommendation That Permission in Principle is Approved

This application is brought to committee in line with the adopted LPA constitution as the proposal site lies outside of the village in open countryside and is therefore a departure from policy.

1.0The Site

1.1The site (outlined in red) comprises of a rectangle parcel of undeveloped land measuring 0.39 hectares in area, fronting onto Bilsthorpe Road on the outskirts of the village. The site is enclosed by a level of foliage and is accessed via a posted entrance on the highway. Visibility to the site is clear and open with the site and wider field being clearly visible from the roadside.

1.2The village of Eakring is located to the east. It has a strong residential character and is fairly densely populated for a village. The village of Eakring Conservation Area encompasses almost the entire village with a few areas to the west and south excluded with the site located just outside of it as shown on fig. 2 below. Figure 1 - Red Line boundary of site

Figure 2 – Uniform map showing extent of Conservation Area in red Figure 3 - Nottinghamshire Historic Environment Record showing CA

1.3The site is not within a conservation area but immediately adjacent and there are no listed buildings nearby. The site has the following constraints:

• Flood Zone 1 • Non-designated Heritage Asset Of Apple Cottage immediately adjacent to the site • Non-designated Heritage Asset Of Ashcroft and adjoining 2 Bilsthorpe Road located further along Bilsthorpe Road into the village. 2.0 Relevant Planning History

2.1PREAPP/00294/24 - Development of 12 new homes. – Considered to be acceptable.

3.0The Proposal

3.1The application seeks Permission in Principle (the first of a 2-stage process) for residential development of up to 4 dwellings with a minimum of one. No specific details are required at this stage.

3.2Permission in Principle requires only the location, the land use, and the amount of development to be assessed. If residential development (as is the case in this application), the description must specify the minimum and maximum number of dwellings proposed.

3.3It is the second stage of the process, Technical Details Consent, which assesses the details of the proposal. This must be submitted within 3 years of the Permission in Principle decision.

3.4Documents assessed in this appraisal:

• Application form – Submitted 13th March 2026; • Site Location Plan (DRWG 01) – Submitted 13th March 2026; • Supporting Letter from Agent – Submitted 20th March 2026; • Appeal Decision – Submitted 20th March 2026;

4.0Departure/Public Advertisement Procedure

4.1Occupiers of 11 properties have been individually notified by letter. A site notice has also been displayed near to the site expiring 2.4.2026

4.2Site visit undertaken 18 March 2026.

5.0Planning Policy Framework

The Development Plan

5.1Newark and Sherwood Amended Core Strategy DPD (adopted March 2019) • Spatial Policy 1 - Settlement Hierarchy • Spatial Policy 2 - Spatial Distribution of Growth • Spatial Policy 3 – Rural Areas • Spatial Policy 7 - Sustainable Transport • Spatial Policy 8 – Protecting and Promoting Leisure and Community Facilities • Core Policy 6 – Shaping our Employment Profile • Core Policy 9 -Sustainable Design • Core Policy 10 – Climate Change • Core Policy 12 – Biodiversity and Green Infrastructure • Core Policy 13 – Landscape Character 5.2. Allocations & Development Management DPD (2013)

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Land Adjacent Apple Cottage, Bilsthorpe Road, Eakring (26/00377/PIP)Report 551 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 20 attended
AF
Councillor Andy FreemanChair, present
DM
Councillor David MooreVice-Chair, present
CB
Councillor Celia BrooksCommittee Member, present
LD
Councillor Linda DalesCommittee Member, present
SF
Councillor Simon FordeCommittee Member, present
PH
Councillor Peter HarrisCommittee Member, present
MH
Councillor Michelle HomeCommittee Member, present
KM
Councillor Keith MeltonCommittee Member, present
PR
Councillor Penny RainbowCommittee Member, present
SS
Councillor Sue SaddingtonCommittee Member, present
MS
Councillor Maurice ShakeshaftCommittee Member, present
TS
Councillor Tom SmithCommittee Member, apologies

All 20 on the meeting page

On this subject at Newark and Sherwood

Search all
  1. Land Adjacent Apple Cottage, Bilsthorpe Road, Eakring (26/00377/PIP)This decision
  2. Land Adjacent Church View Farm, Swinderby Road, South Scarle, NG23 7JW - 25/02049/FULAgreed
  3. Land Adjacent The Brushes, Retford Road, Walesby - 25/01974/PIPAgreed
  4. Land Adjacent Cartref, Corkhill Lane, Normanton - 25/01832/PIPAgreed
  5. Land Adjacent Staythorpe Substation, Staythorpe Road, Staythorpe - 23/00810/FULMAgreed
  6. Land adjacent to Fosse Road, Farndon- 23/01429/FULAgreed

More from Newark and Sherwood Planning Committee

All decisions
MeetingDecisionOutcome
7 May 2026 Minutes of the meeting held on 9 April 2026AGREED that the minutes from the meeting held on 9 April 2026 were agreed as a correct record and signed by the Chair. Agreed Open
7 May 2026 Review of the Protocol for Planning Committee and the Planning Committee Scheme of Delegation to OfficersAGREED that: (a) no changes are currently required to the Protocol for Planning Committee or the Planning Scheme of D... Agreed Open
7 May 2026 Land to Rear of Mill Lane, Caunton (25/01952/FUL)AGREED Moved Councillor M Spoors and Seconded Councillor S Saddington (with 11 votes For and 2 votes Against) that co... Agreed Open
7 May 2026 Land to the East of Hockerton Road, Upton (26/00382/PIP)AGREED Moved Councillor K Melton and Seconded Councillor P Harris (with 7 votes For and 6 vote Against) that contrary... Agreed Open
7 May 2026 Land South-East of Caunton Road, Hockerton NG25 0LP (26/00448/PIP)AGREED (with 7 votes For, 4 votes Against and 1 Abstention) that Permission in Principle be approved. Agreed Open