Resolved
Cabinet agreed to adopt the revised Forth Yards Opportunity Site Development Framework and noted the responses received during the public consultation, which were appended in the Consultation Summary Report at Appendix 2.
Cabinet agreed this item on Monday 20 January 2020. Below is the council's own wording, with the papers it was decided on.
Resolved
Cabinet agreed to adopt the revised Forth Yards Opportunity Site Development Framework and noted the responses received during the public consultation, which were appended in the Consultation Summary Report at Appendix 2.
Forth Yards Opportunity Site DEVELOPMENT FRAMEWORK
January 2020
Kath Lawless BSc(Hons) MSc MRTPI, Assistant Director Planning Civic Centre, Barras Bridge, Newcastle upon Tyne, NE1 8QH
Forth Yards Development Framework (January 2020) 1 Contents
1. Introduction 4
2. The Sites 5
3. Historical Development 6
4. Existing Planning Permissions 10
5. Development Scenarios 11
6. Site Analysis 12
7. Planning Policy for the Area 13
8. Contextual Views and the Tyne Gorge Study 15
9. Existing Site Features 16
10. Development Design Principles 17
11. Tackling Climate Change 18
12. Landscape, Ecology and Green Infrastructure 19
13. Open Space and Active Design 20
14. Water Infrastructure 21
15. Social Infrastructure 22
16. Utilities Infrastructure 22
17. Transportation Improvements 23
18. All Sites: Area Wide Delivery Requirements 26
19. Site by Site Delivery Requirements 27
20. Forth Yards Infrastructure Interventions 30
21. Infrastructure Delivery Plan and Contributions 32
22. Contributions to Site Wide Infrastructure 33
23. Further Reading 34
Contact: [email protected]
Aerial View of the Forth Yards Area, Circa 2008 Forth Yards Development Framework (January 2020) 3 1. Introduction
The Forth Yards Area presents an exciting opportunity to deliver a landmark gateway into Newcastle upon Tyne, with a vibrant mixture of uses and a linked green infrastructure network at its heart. High quality buildings and spaces will enhance the distinctive characteristics of the Tyne Gorge, with sustainable transport connections to the City Centre, Quayside and wider area.
Forth Yards Location The Forth Yards area covers 21 hectares. The River Tyne provides its southern boundary and the former Newcastle-Carlisle rail line largely defining the areas northern boundary. The eastern boundary of the Framework area is formed by the King Edward Bridge and alignment of the East Coast Mainline railway, with the western boundary formed by Dunn Street, south of Scotswood Road. Outside this boundary this Framework document also provides guidance on development opportunities for: the Safestore Storage Building on Forth Street/ Railway Street junction; the former Cemex Concrete Batching Plant on Pottery Lane (situated Newcastle east of the King Edward Bridge); 11-12 Skinnerburn Road and Land South of City Centre Skinnerburn Road, opposite the junction of Skinnerburn Road and Dunn Street.
The area is identified as an opportunity site for a mixture of residential, office and leisure uses at a major gateway into Newcastle; by road (New Redheugh Bridge/ Central Scotswood Road); rail (King Edward Bridge), Metro (Queen Elizabeth II Bridge) Station and pedestrian/cyclists (Hadrian’s Way/C2C routes). The area also benefits from having attractive south facing views over the River Tyne, with its wider gorge setting and rich industrial heritage. e Tyn Framework Purpose r ve As set out in paragraph 16.63 of the Core Strategy and Urban Core Plan (CSUCP), Ri this Framework Document’s purpose is to guide the future development of the area, in support of Policy D3. It makes provision for essential infrastructure to Gateshead allow future developments to come forward in a sustainable form. It will therefore Centre be a material consideration in the assessment of all planning applications covering the Forth Yards area of the city and adjacent sites.
The Framework sets out the historic and landscape context of the Forth Yards area; planning policy covering the area; site analysis of the area and subsequent design principles; then identifying infrastructure required in relation to transportation, N green and social infrastructure to allow the area to develop sustainably. The end of the document identifies design and infrastructure interventions for each site, along with area wide infrastructure requirements. Forth Yards area outlined in blue within Newcastle and Gateshead Urban Core, outlined in red.
4 Forth Yards Development Framework (January 2020) 2. The Sites
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
4.1 Development Framework xx2020_FINAL (Reduced)Report | 17 MB | DownloadRead as text |
PDF |
4.2 Forth Yards Consultation Statement (002) FINAL Jan 2020Report | 172 KB | Download |
PDF |
Forth Yards Opportunity Site Development FrameworkReport | 92 KB | Download |
Follow Cabinet at Newcastle and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 21 Sep 2026 | Property Team Response to the Corporate Scrutiny Committee Commercial Property Development Spotlight ReviewSummary Consideration was given to a report which outlined the response to recommendations received by Cabinet in Jun... | Agreed | Open |
| 21 Sep 2026 | Council PlanSummary Consideration was given to the 2026-2029, which set out six priority outcomes that will drive activity to ach... | Agreed | Open |
| 21 Sep 2026 | Scrutiny Response to the Draft Council PlanSummary Consideration was given to a report which outlined the findings and recommendations of the Corporate Scrutiny... | Agreed | Open |
| 21 Sep 2026 | Council Tax SupportSummary Consideration was given to a report which set out possible options for amendments to the working age scheme a... | Refused | Open |
| 21 Sep 2026 | Quarter 1 Projected OutturnSummary Consideration was given to a report which set out the outturn position for Quarter One, for all council servi... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.