Resolved
Planning permission for application reference 2026/0419/01/DET be refused for the following reasons: i. The proposed development, by reason of its design, fails to positively respond to built landscapes, does not take a comprehensive and coordinated approach to development, has failed to use material, colours and tones appropriate to the characteristics of the area contrary to the requirements of the National Planning Policy Framework, Policy CS15 of the Core Strategy and Urban Core Plan and Policy DM20 of the Development and Allocations Plan. ii. The development would increase in car trips and does not promote or enhance public transport; has failed to adequately mitigate against its impact on the highway network in the interest of safety, efficiency and accessibility; and failed to demonstrate that the residual cumulative impacts would not be severe and the development has failed to demonstrate highway network capacity and operation, contrary to the requirements of National Planning Policy Framework, Policy CS13 of the Core Strategy and Urban Core Plan and Policies DM10, DM12 & DM14 of the Development and Allocations Plan. iii. The development has failed to assess and mitigate air quality to demonstrate that there is no unacceptable adverse environmental and health impact, contrary to the requirements of National Planning Policy Framework, Policy CS14 of the Core Strategy and Urban Core Plan and Policy DM24 of the Development and Allocations Plan. iv. The development has failed to prioritise the use of SuDS, failing to separate, minimise and control surface water runoff, has failed to manage and reduce flood risk, by failing to maximise permeable surfaces and incorporate green infrastructure, failing to demonstrate that its surface water drainage strategy, site layout and design will not increase the risk of flooding elsewhere and that exceedance flows will be managed, failed to manage surface water as close to source as possible using source control measures, failed to follow the SuDS management train approach to manage water quantity and quality throughout the site, failed to provide the most sustainable SuDS techniques from the SuDS Hierarchy, failed to demonstrate the life-time maintenance and management of the SuDS, contrary to the requirements of the National Planning Policy Framework, Policy CS16 of the Core Strategy and Urban Core Plan and Policy DM26 of the Development and Allocations Plan.