Resolved
Decision The Deputy Mayor in consultation with Cabinet agreed to the: 1. retention of pedestrian railings across the East Ham Station bridge. Reasons for the Decision The footways over East Ham Station Bridge have failed the assessment under Accidental Wheel loading. The Railway Authority has requested the Council to provide protection to the footways to mitigate risk of accidental wheel loading, which could otherwise result in the failure of the bridge. The existing pedestrian railings across the bridge were considered to be satisfactory by the Railway Authority as a compromise to the Type 2 metal parapet that is required by design to retain an errant vehicle. During the High Street North highway renewal works the extent of these railing has been reduced further across footways on both sides. Consequently, this has increased the ability for vehicles to get on to the footways and measures will need to be taken to prevent this from occurring. The pedestrian railings provided are ornamental and less intrusive than the metal parapet Type 2. It is recommended that the pedestrian railings are retained for continued protection with bins strategically placed to prevent vehicles from driving onto the footways at these locations. Alternative means of protection using planters would reduced footway widths and restrict movement of pedestrians. Provision of bollards is not feasible due to insufficient depth for foundations. The report and decision have complied with Part 4.5, paragraph 16 of the Constitution. The decision is not subject to the Call-In process and may be implemented immediately.
Word for word from the decision Newham published for this meeting.
Source: mgov.newham.gov.uk