Decision The Mayor agreed the acceptance of the tender submitted by Southern Counties Roofing Contractors Ltd in the sum of £741,470 for roof replacement and associated work at East Ham Town Hall (Main Hall). Reasons for the Recommendation In order that construction works can progress to address condition issues and to protect the long term future of this important listed civic building. This decision is subject to the call-in process as the decision was based on exempt information. The call-in period will expire on 10 th February 2016
Word for word from the decision Newham published for this meeting.Source: mgov.newham.gov.uk
This report requests approval to accept the tender submitted by Southern Counties Roofing Contractors Ltd in the sum of £741,470 for roof replacement and associated work at East Ham Town Hall (Main Hall).
Executive Summary of Outcomes
The project will result in repair and improvement to the roof of the main hall at East Ham Town Hall which will prevent future water ingress and damage to the building.
Recommendation
The Mayor is asked to:
1. Approve the acceptance of the tender submitted by Southern Counties Roofing Contractors Ltd in the sum of £741,470 for roof replacement and associated work at East Ham Town Hall (Main Hall).
General Report Template: Ver: 006 Last revised: April 2015 Reasons for the Recommendation
In order that construction works can progress to address condition issues and to protect the long term future of this important listed civic building.
The scheme of Delegation and the Council’s Contract Standing Orders requires that Mayoral approval is given to the commencement of a tendering exercise for the award of a contract which is above £500,000.
NAME OF LEAD OFFICER: Zoe Power POSITION: Head of Projects and Programmes
Originator of report: Zoe Power/Peter Anthony Tel no: 020 3373 7263 / 020 3373 0476 E-mail address: [email removed] [email removed]
Local Government (Access to Information) Act 1985 Background papers used in preparing this report:
N/A
Copies of Background documents can be obtained from:
N/A
List of enclosures:
Appendix 1 Site Plan Appendix 2: Exempt Information Appendix 3 Tender Report (Exempt)
General Report Template: Ver: 006 Last revised: April 2015 1. Introduction and Background
1.1Approval was secured at Mayoral Proceedings on Friday 3rd July 2015 to begin the procurement process for roof replacement/repair works at East Ham Town Hall. Following a competitive tender exercise using Constructionline, this report requests approval to award the contract to Southern Counties Roofing Contractors Ltd for roof replacement and associated work at East Ham Town Hall (Main Hall).
1.2Funding has been identified for repairs to the roof and ceiling at East Ham Town Hall. Utilising this funding, emergency works have already been undertaken to secure the main hall ceiling to prevent the fibrous plaster falling to the ground. Further details are provided at Appendix 2 (exempt).
2. Key Considerations
2.1The roof has suffered from disrepair and water ingress for a number of years and this is impacting on the sub-structure beneath the roof. The construction project will prevent further deterioration to the roof and structures beneath it.
2.2The proposed works include (see site plan Appendix 1): Erection of scaffold and temporary roof to all areas of roof renewal; Strip existing roof coverings and inspection and repair of timberwork as necessary; Lay new slates to main hall and adjacent lower roofs; Renew all defective lead work, downpipes and guttering; Repair brickwork and masonry to high level parapet only; Upgrade lightning protection to current regulations.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.