Monmouthshire and Brecon Canal Partnership Steering Group agreed this item on Thursday 1 February 2018. Below is the council's own wording, with the papers it was decided on.

Item5

Resolved

It was agreed that ideally the information should be collated and stored online, as opposed to hard copies. This review would involve the consultant meeting with each local authority and other parties. Once all cost information was to hand it would be adjusted to today’s prices. This work would take approximately 3 to 4 months and the cost is anticipated to be in the region of £15,000. CRT were looking for confirmation that the staff/volunteer time to service the consultant would be made available and ideally contributions towards the cost from members of the steering group. Whilst it was agreed to the principle of the study there were a couple of comments. It was queried whether there were any other funds available to cover the costs of this project. Cllr Stedman observed that in its present form only the unrestored area of the canal had been identified and suggested that it be extended to cover the whole of the canal thus encouraging more parties to contribute. The Chair suggested that a formal letter be drafted and sent to all members of the steering group. Agreed: That A Stumpf amend the terms of the consultation to include the whole canal in this project and that he draft a letter requesting a contribution that would be distributed via the clerk to all parties of the steering group.
Word for word from the decision Newport published for this meeting. Source: democracy.newport.gov.uk

Follow this further

Built from Newport's papers

What the report saysPro

Report to Monmouthshire and Brecon Canal Partnership Steering Group

MNY 17-23 Monmouth Canal Desk Study Brief

Monmouthshire Canal – Five Locks to Newport and Cwmcarn

Canal & River Trust are seeking to appoint a consultant to review existing information regarding the engineering proposals and costs of restoring the Monmouthshire Canal between Five Locks, Cwmbran, Barrack Hill, Newport and Cwmcarn (Caerphilly CBC area) including a proposed extension to the River Usk at Crindau. The purpose of this review is to collate the information available, identify any gaps in existing knowledge, create consistency between costs and in doing so provide a robust total figure for the full restoration and for each of the individual elements. This figure, and the review report, will form part of the evidence base for the case for restoration.

Consultancy Brief – Engineering Costs of Restoration

The Monmouthshire Canal was opened in 1796 linking the centre of Newport and the Bristol Channel port with Pontypool and Crumlin. The major market for the canal was the export of coal via the Bristol Channel, with iron also forming a significant trade. The canal joined the Brecon and Abergavenny, completed in 1812, which extended trade from Pontypool to Brecon. Both canals were supported by an extensive network of horse drawn tram roads.

Following the usual cycle of prosperity, railway ownership and decline, both canals ceased to carry trade in the first half of the 20th century. The rural, and generally lock free Brecon and Abergavenny survived to be included in the Brecon Beacons National Park and is now a major tourism asset; the more urban and heavily locked Monmouthshire canal ceased to be navigable and became blocked with road crossings and other urban developments. The Brecon and Abergavenny Canal (33 miles and 6 locks) is navigable between Pontypool and Brecon, and well used for most of this length: the top two miles of the Monmouth Canal, from Pontypool to Five Locks, is navigable but little used.

Although largely unnavigable and inaccessible to boats, the Monmouth canal towpath is popular with walkers and cyclists, linking the urban communities along its route. There is a thriving and popular visitors centre at Fourteen Locks, Cefn, incorporating a café, interpretation and seasonal boat trips through the top lock.

There is an aspiration to restore the Monmouthshire Canal from Five Locks, Cwmbran to Barrack Hill, Newport, and the Crumlin Branch from Newport to Cwmcarn. Beyond Cwmcarn the Crumlin Branch is mostly lost under a new road, and beyond Barrack Hill the line into Newport is lost without trace, so there is no aspiration to extend restoration beyond these points. However there is an aspiration to link the canal at Barrack Hill to the tidal River Usk via Crindau Pill, including a new marina that would serve both river and canal.

Study Area

The study area covers the Monmouthshire canal from the top of Five Locks, Cwmbran to the mouth of Barrack Hill Tunnel, Newport, and the Crumlin Branch to the site of lock 22, Cwmcarn, north of which the canal is infilled. The study also covers the proposed link to the River Usk via Crindau Pill

Moss Naylor Young 1 MNY 17-23 Monmouth Canal Desk Study Brief

 The main line of the canal from Five Locks to Barrack Hill Tunnel is 5m 6f (9.2km) in length with 30 locks  The Crumlin Branch from Malpas Junction (0.5m/0.8km from Barrack Hill) is 8m 2f (13.2km) with 20 locks  The proposed extension along Crindau Pill is approximately 1km long and will feature two locks between the canal and the Pill, and a tide control structure between the Pill and the River Usk.  In the total length of canal there are 16 major crossings and at least 22 minor crossing points: not all of these form obstructions to navigation.  There are approximately 22 obstructions to navigation, not including locks

There are major obstructions (requiring significant deviation or new locks) at:

 Five Locks  Cwmbran Town Centre  Manor Road, Ty Sign  Darran Road, Ty Sign

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
MBC Regeneration Resource ArchiveReport 426 KB DownloadRead as text

At this meeting

Whole meeting
2Minutes of the Previous MeetingAgreed
5MBC Regeneration Resource ArchiveThis decision

Who was there

15 of 28 attended
DM
Councillor David MayerCommittee Member, present
RJ
Councillor Roger JeavonsCommittee Member, present
JM
Councillor Jane MuddCommittee Member, absent
SM
Sean MorganCommittee Member, apologies
ES
Eluned StennerCommittee Member, absent
CT
Carl ThomasCommittee Member, apologies
RR
Richard RodenCommittee Member, apologies
JC
Jackie CharltonCommittee Member, present
CT
Colette ThomasCommittee Member, apologies
SA
Stuart AshleyCommittee Member, present
JH
Jon HorlerCommittee Member, apologies
RD
Richard DommettCommittee Member, present

All 28 on the meeting page

More from Newport Monmouthshire and Brecon Canal Partnership Steering Group

All decisions
MeetingDecisionOutcome
19 Apr 2018 Minutes of the Previous MeetingAgreed: That the minutes were a true record subject to the above. Agreed Open
19 Apr 2018 Memorandum of UnderstandingAgreed: That the original Memorandum of Understanding be circulated to all Steering group members and the document be... Agreed Open
1 Feb 2018 Minutes of the Previous MeetingAgreed: That the minutes of the meeting be were recorded as a true record. Agreed Open
31 Aug 2017 Minutes of the previous meetingAgreed: That the minutes of the meeting were recorded as a true record. Agreed Open
31 Aug 2017 Importance of Developing a Water StrategyAgreed: It was agreed by all members of the group that there was a need to sign up to this project. Agreed Open