Item87
Resolved
That application 19/01416/HYA be GRANTED planning permission, subject to the conditions and reasons contained in the report od the Development and Conservation Manager and the additional and amended conditions below Development A Condition 10 Prior to occupation, each apartment block, shall incorporate one EV ready domestic charging point for between 5 - 10 apartments and these shall be made available to its residents and managed and maintained by the management company( ies ) appointed as responsible for each apartment block. OR (b) Prior to occupation, a contract shall be entered into with a private provider to operate an EV car club for the residents of the apartment blocks for a period, scope and a level of provision to be agreed in writing with the LPA. Reason: To contribute to the objective of providing a sustainable transport network and to provide the necessary infrastructure to help off-set the adverse impact of the operational phase of the development on local air quality. Additional Condition 25 The development permitted by this planning permission shall be carried out in accordance with the Flood Risk Assessment and Drainage Strategy – Addendum, Ref: 1809-217, Rev -, A and B, prepared by Ingent Consulting Engineers and the Phase 1 & 2 Drainage Strategy Drawing, dated 06.12.2019, Rev B, prepared by Ingent Consulting Engineers and the following mitigation measures: 1. Provide attenuation to ensure no increase in surface water run-off volumes for all rainfall events up to and including the 1 in 100 year + 40% for climate change event (minimum 329.4m3). 2. Implement drainage strategy based on lined permeable paving with sub-base and perforated pipes, attenuation crates and restricted discharge at 5l/s into the surface water sewer. Reason To prevent flooding by ensuring the satisfactory storage of and disposal of surface water from the site. Additional Condition 26 No development shall take place until the final design of the drainage scheme is completed and sent to the LPA for approval. The surface water drainage system will be based on the submitted Flood Risk Assessment and Drainage Strategy – Addendum, Ref: 1809-217, Rev -, A and B, prepared by Ingent Consulting Engineers and the Phase 1 & 2 Drainage Strategy Drawing, dated 06.12.2019, Rev B, prepared by Ingent Consulting Engineers. The scheme shall also include: 1. Detailed engineered drawings of the proposed SuDS features including their location, size, volume, depth and any inlet and outlet features including any connecting pipe runs and all corresponding calculations/modelling to ensure the scheme caters for all rainfall events up to and including the 1 in 100 year + 40% allowance for climate change event. 2. Provision of half drain down times within 24 hours 3. Silt traps for protection for any residual tanked elements. 4. Demonstrate appropriate SuDS management and treatment and inclusion of above ground features such as permeable paving etc. for the paved areas and reducing the requirement for any underground storage. 5. Provision of exceedance routes for events greater than the 1 in 100 year + climate change Reason To ...
Word for word from the decision North Hertfordshire published for this meeting.
Source: democracy.north-herts.gov.uk