21/02796/FP 59 - 61 Walsworth Road, Hitchin, Hertfordshire, SG4 9SX

Agreed Planning 4 papers

Planning Control Committee agreed this item on Thursday 1 December 2022. Below is the council's own wording, with the papers it was decided on.

Item39

Resolved

That application 22/00170/FP be GRANTED planning permission subject to the completion of a satisfactory S106 Legal Agreement and the reasons set out in the report of the Development and Conservation Manager, with the following amendments: · Removal of Condition 21 as detailed in the report. · Condition 22 and Condition 23 to become Condition 21 and Condition 22 respectively. · Additional Conditions 23 and 24 to read: “Condition 23 The development permitted by this planning permission shall be carried out in accordance with the following documents: · E-mail response dated 23 August 2022 from Nolan Associates · E-mail response dated 28 October 2022 from Nolan Associates · Drainage Strategy carried out by Nolan Associates dated March 2022 reference 2021- 087 · CCTV and Connectivity Survey dated 9 May 2022 carried out by Wrc · Manhole Survey Report dated 27 May 2022 carried out by Wrc and the following mitigation measures: 1. Provide minimum surface water attenuation volume of 27m3 to ensure no increase in surface water run-off volumes for all rainfall events up to and including the 1 in 100 year + climate change (40%) event. 2. Implement drainage strategy based on a tank and permeable paving for attenuation and treatment at a discharge rate of 2l/s into an existing surface water sewer (final details to be confirmed as part of a post demolition condition). 3. Provide water quality treatment using permeable paving on 10 parking bays where all the impermeable areas including the access road will be directed to the permeable paving for treatment prior to discharge. Reason To prevent flooding by ensuring the satisfactory storage of/disposal of surface water from the site. Condition 24 No development shall take place, apart from the demolition of the current building, until the final design of the drainage scheme is completed and is approved by the LPA. The surface water drainage system will be based on the following approved documentation: · E-mail response dated 23 August 2022 from Nolan Associates · E-mail response dated 28 October 2022 from Nolan Associates · Drainage Strategy carried out by Nolan Associates dated March 2022 reference 2021- 087 · CCTV and Connectivity Survey dated 9 May 2022 carried out by Wrc · Manhole Survey Report dated 27 May 2022 carried out by Wrc The scheme shall also include: 1. Post demolition survey of the existing drainage system to confirm the existing connection into a sewer. Should the survey determine the connection is into an existing combined sewer, the applicant will need to demonstrate that they have considered other options where possible to connect into another surface water sewer. 2. Permission from Anglian Water to connect into their sewer including any required sewer upgrades due to capacity issues at the agreed rate of 2l/s. 3. Detailed engineered drawings of the proposed SuDS features including their location, size, volume, depth and any inlet and outlet features including any connecting pipe runs and all corresponding calculations/modelling to ensure the scheme caters for all rainfall events up to and including the 1 in 100 year + 40% allowance for climate change ...
Word for word from the decision North Hertfordshire published for this meeting. Source: democracy.north-herts.gov.uk

Follow this further

Built from North Hertfordshire's papers

What the report saysPro

Report to Planning Control Committee
This report is being read into text

Papers are read newest first, so recent reports come through within hours. Until then, open it at source.

Open the PDF

Papers for this item

Kept in our archive, download once signed in
PDF
21/02796/FP 59: 61 Walsworth Road, Hitchin, Hertfordshire, SG4 9SXReport 470 KB Copy on its way
PDF
HCC Growth and Infrastructure Unit Response (28.10.22)Report 93 KB Copy on its way
PDF
Lead Local Flood Authority Response (17.11.22)Report 134 KB Copy on its way
PDF
PlanReport 621 KB Copy on its way

At this meeting

Whole meeting

On this subject at North Hertfordshire

Search all
  1. 21/02796/FP 59 - 61 Walsworth Road, Hitchin, Hertfordshire, SG4 9SXThis decision
  2. Application for premises licence for the radcliffe, 31 walsworth road, hitchin, herts.Noted

More from North Hertfordshire Planning Control Committee

All decisions
MeetingDecisionOutcome
1 Oct 2026 Apologies for absenceThere were no apologies for absence received. Decided Open
1 Oct 2026 Minutes - 3 september 2026That the Minutes of the meeting of the Committee held on 3 September 2026 be approved as a true record of the proceed... Approved Open
1 Oct 2026 Notification of other businessThere was no notification of other business. Decided Open
1 Oct 2026 Chair's announcements(1) The Chair advised that, in accordance with Council Policy, the meeting would be recorded. (2) The Chair drew atte... Decided Open
1 Oct 2026 Public participationThe Chair confirmed that the registered speakers were in attendance. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies