Resolved
That application 19/01448/FP be GRANTED planning permission subject to the completion of a satisfactory legal agreement and the extension of the statutory period if required, as well as the reasons set out in the report of the Development and Conservation Manager, with the following amendments to Conditions 7 and 18, and an additional Condition 41, to read: “Condition 7 “No works or development (including any pre-construction, demolition or enabling works) shall commence until a Construction Management Plan/construction phasing and environmental management programme has been submitted to and approved in writing by the Local Planning Authority, including elements of the CLOCS standards as set out in the Highway Authority's Construction Management template. Thereafter the construction of the development shall only be carried out in accordance with the approved Plan/Programme unless otherwise agreed in writing by the Local Planning Authority: The Construction Management Plan/construction phasing and environmental management programme shall include details of: · Construction vehicle numbers, type, routing. · Access arrangements to the site. · Traffic management requirements. · Construction and storage compounds (including areas designated for car parking, loading /unloading and turning areas). · Siting and details of wheel washing facilities (for construction vehicles leaving the site). · Cleaning of site entrances, site tracks and the adjacent public highway. · Timing of construction activities/hours of construction operations (including delivery times and removal of waste) and to avoid school pick up/drop off times. · Provision of sufficient on-site parking prior to commencement of construction activities. · Site set up and general arrangements for storing plant including cranes, materials, machinery and equipment, temporary offices and other facilities, construction vehicle parking and loading/unloading and vehicle turning areas. · Where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, pedestrian routes, and remaining road width for vehicle movements. · Phasing Plans. · Measures to minimise dust, noise, machinery and traffic noise impacts during construction. · The location of construction traffic routes to and from the site, details of their signing, monitoring and enforcement measures. · Screening and hoarding details, to protect neighbouring residents. · End of day tidying procedures to ensure protection of the site outside the hours of construction. The construction activities shall be designed and undertaken in accordance with the code of best practice set out in British Standard 5228 1997 and with the agreed details unless otherwise agreed in writing by the Local Planning Authority. · Storage and removal of building waste for disposal or recycling. · Post construction restoration/reinstatement of the working areas and temporary access to the public highway. · Ecological method statements to incorporate: MM1 – General Construction Safeguards, MM2 – Hedgerow and Tree Protection, MM7– Badger Construction Safeguard, MM9-Precautionary Habitat Clearance Measures and MM10 -Timing of Works from the Ecological Appraisal April 2019 by Aspect Ecology Reason: In order to protect highway safety and the amenity of other users of the public highway and rights of way in accordance with Policies 5, 12, 17 and 22 of Hertfordshire's Local Transport Plan (adopted 2018) and to ensure the correct ...