25/02115/FP KIRKBY MANOR FARM, NORTHFIELD ROAD, ASHWELL, BALDOCK, HERTFORDSHIRE, SG7 5JQ

Approved Planning 7 papers

AI summaryNorth Hertfordshire District Council has granted planning permission to convert three agricultural barns at Kirkby Manor Farm, Ashwell, into eight homes, despite a highways objection, citing a prior approval fallback and a housing land shortfall.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedPermission for 8 dwellings from barn conversion
MoneyNot stated
What happens nextEcology response awaitedDelegated to Development and Conservation Manager
Who it affectsKirby Manor Farm, AshwellSite east of Northfield Road

What was decided

Planning permission was granted for the conversion of three agricultural buildings into eight dwellings, comprising two two bedroom and six three bedroom units. Report 4.2

Members added four further conditions covering construction method, external lighting, boundary treatment and external materials, including a bar on red render.

Permitted development rights for classes A to E were removed to keep future changes under council control, though cycle storage was carved out. Report P38

Why

The proposal reuses existing rural buildings and is therefore acceptable in principle under Local Plan policies CGB1 and CGB4, which cover rural areas beyond the Green Belt. Report P22, P23

Officers gave significant weight to a valid prior approval for eight dwellings granted under Class Q, which is treated as a real fallback position. Report P24

The council cannot show a five year supply of housing land (estimated at 2.6 to 3.3 years), engaging the tilted balance in favour of granting the modest eight home scheme.

What happens next

A response from the council's ecology team is awaited and the final decision is delegated to the Development and Conservation Manager, who may also agree an extension of time.

Development must begin within three years of the date of permission, and a Biodiversity Gain Plan must be approved before any work starts. Report P30, P43

Pre-commencement conditions covering land contamination, a Construction Environmental Management Plan and landscaping details must be submitted and approved in writing before building begins. Report P35, P36, P37, P40

Options considered

  • Chosen: Grant planning permission subject to conditions. Officers concluded the modest benefits, including eight new homes, were not significantly outweighed by harm to neighbour amenity or highways concerns, particularly given the prior approval fallback and tilted balance from the housing shortfall.

Implications

  • Legal: A statutory Biodiversity Gain Plan must be approved by the council before development can lawfully begin, as no exemption or transitional arrangement applies. Report P43
  • Risk: Phase 1, 2 and 3 land contamination investigations and a validation report are required to protect human health and meet Part 2A of the Environmental Protection Act 1990. Report P37
  • Equalities: There would be some loss of privacy within the gardens of units 1, 2 and 4 due to overlooking from Kirby Manor Farmhouse, with moderate weight given to this harm.
  • Climate: The development is expected to follow a fabric first approach with scope for PV panels and air source heat pumps, and the design and access statement addresses sustainability though it does not reference the council's SPD. Report P26
  • Other: Hertfordshire County Council Highways objected on sustainability grounds, citing a lack of footpaths, cycle routes and public transport, but officers considered this did not outweigh policy support for rural building reuse.

Who and where

  • The applicant Report P2
  • Future occupiers of the eight new dwellings
  • Occupiers of Kirby Manor Farmhouse, the neighbouring property approximately 6.2m from the boundary
  • Occupiers of Kirby Cottage on the opposite side of Highfield Road, also owned by the applicant
  • Ashwell Parish Council, which was consulted but did not respond
  • Hertfordshire County Council Highways, which objected

Timeline

  • 28/01/2026: Statutory expiry date for the application Report P5
  • Within 3 years of permission: Development must begin, otherwise the permission expires Report P30
  • Before any permitted dwelling is occupied: Validation report on land contamination and cycle storage details must be approved Report P37, P42
  • Within first planting season after first occupation or completion: Approved landscaping must be carried out, with replacements within 5 years if trees or plants die or are damaged Report P40
  • Outside main bat maternity season: Works to building 3 must take place under the supervision of a licensed ecologist, with a bat licence obtained from Natural England

Plain English for the jargon

  • Class Q / PNQ: A type of prior approval application that allows conversion of agricultural buildings to homes under permitted development rights.
  • Tilted balance: The presumption in favour of sustainable development that applies when a council cannot show a five year supply of housing land, set out in paragraph 11 of the National Planning Policy Framework.
  • BNG (Biodiversity Net Gain): A requirement for development to deliver at least a 10% improvement in biodiversity, secured here by a statutory condition and a Biodiversity Gain Plan.
  • CEMP (Biodiversity): A Construction Environmental Management Plan covering measures to protect wildlife during building works, informed by an up to date ecological appraisal.
  • SPD: Supplementary Planning Document, providing further detail on policies in the Local Plan.
  • Fallback position: An existing planning permission, here a prior approval, that could still be carried out and which makes the current proposal more acceptable by comparison.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item117

Resolved

That application 25/02115/FP be GRANTED planning permission subject to the conditions set out in the report of the Development and Conservation Manager, with additional Conditions 10 to 13 as follows: ‘Condition 10 No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to, and approved in writing by the Local Planning Authority. The statement shall provide for: a) the parking of vehicles of site operatives and visitors. b) loading and unloading of plant and materials. c) storage of plant and materials used in constructing the development. d) the hours of construction works. e) wheel washing facilities. f) measures to control the emission of dust and dirt during construction. The approved construction Method Statement shall be adhered to throughout the construction period for the development. Reason: In the interests of the amenities of the area and in accordance with Policy D3 of the North Hertfordshire Local Plan 2011 to 2031. Condition 11 Prior to the installation of external lighting, full details including height, hours of operation, design, location of lighting, intensity and shall be submitted to and approved in writing by the Local Planning Authority. The lighting scheme shall preclude the inclusion of motion sensors. The lighting installation shall then be carried out in accordance with the approved details and retained as such thereafter. Reason: In the interests of the appearance of the locality within the countryside and protection of neighbour amenity in accordance with Policies NE4 and D3 of the North Hertfordshire Local Plan 2011 to 2031. Condition 12 Notwithstanding details of proposed boundary treatment in the submitted landscaping scheme (Drawing No. 164 LD 01) prior to occupation of the development hereby permitted details of the height of proposed boundary treatment shall be submitted to and approved in witing by the local planning authority, and the boundary wall with Kirby Manor farmhouse will be no less than 2.5metres measured from the highest point along the boundary within the neighbouring property and constructed in Arlesey White bricks. The boundary treatment shall be completed in accordance with the approved details before the buildings are occupied. Reason: To safeguard and enhance the appearance of the development and the amenity of the locality and to comply with policies D1 and D3 of the North Hertfordshire Local Plan 2011 to 2031. Condition 13 Notwithstanding the details in the submitted drawings, the development shall not include red external render. Details and/or samples of materials to be used on all external elevations and the roof of the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority before any works above ground level are commenced. The approved details shall be implemented on site and thereafter retained. Reason: To ensure that the development will have an acceptable appearance which better reflects and does not detract from the appearance and character of the surrounding area and to comply with Policy D1 of the North Hertfordshire Local Plan 2011 to 2031.’
Word for word from the decision North Hertfordshire published for this meeting. Source: democracy.north-herts.gov.uk

Follow this further

Built from North Hertfordshire's papers

What the report saysPro

Report to Planning Control Committee, 13 pages

Location: Kirby Manor Farm Northfield Road Ashwell Baldock Hertfordshire SG7 5JQ

Applicant: [name removed]: Conversion of 3 existing agricultural buildings to provide 8 residential units, including gardens and formation of vehicular access.

Ref. No: 25/02115/FP

Officer: Henry Thomas

Date of expiry of statutory period: 28/01/2026

Extension of statutory period: N/A

Reason for Delay: None.

Reason for Referral to Committee: Site Area exceeds 0.5ha.

1.0Policies

1.1North Hertfordshire District Local Plan 2011 – 2031

Spatial Strategy and Strategic Policies Policy SP1: Sustainable Development in North Hertfordshire Policy SP2 Settlement Hierarchy and Spatial Distribution Policy SP7 Infrastructure requirements and developer contributions Policy SP8 Housing Policy SP9: Design and sustainability Policy SP10: Healthy communities Policy SP11: Natural resources and sustainability Policy SP12: Green infrastructure, biodiversity and landscape Policy CGB1: Rural Areas beyond the Green Belt. Policy CGB4: Existing buildings in the Rural Area Beyond the Green Belt

Development Management Policies Policy T1: Assessment of transport matters Policy T2: Parking Policy D1: Sustainable design Policy D3: Protecting living conditions Policy NE4 Biodiversity and geological sites

1.2Supplementary Planning Documents Design SPD Sustainability SPD

1.3National Planning Policy Framework (2023) Section 2: Achieving sustainable development Section 5 – Delivering a sufficient supply of homes Section 8 - Promoting healthy communities Section 11 – Making effective use of land Section 12: Achieving well-designed places Section 14: Meeting the challenge of climate change, flooding and coastal change

2.0Site History 2.1 24/02712/PNQ - Conversion of existing agricultural buildings to provide 8 residential units – prior approval given. 2.2 23/02338/PNQ - Conversion of existing agricultural barn to provide 4 residential units (2 x 2bed, 1 x 3bed and 1 x 4bed) with all associated building works - prior approval given. 3.0 Representations 3.1 Site Notice and Neighbour Consultation – None received. 3.2 Ashwell Parish Council – None received. 3.3 HCC Highways – Objection “The proposal is contrary to: • NPPF Paragraphs 110 & 112 • Manual for Streets • HCC Place & Movement Planning Design Guidance (2024) • Hertfordshire LTP4 Policy 1 It would result in an unsustainable pattern of development with no realistic provision for active travel or public transport. The Highway Authority therefore recommends refusal.” 3.4 NHC Environmental Health – No objection subject to conditions. 3.5 Environmental Agency – None received. 3.6 NHC Ecology – None received. 3.7 NHC Waste and Recycling – None received.

4.0Planning Considerations 4.1 Site and Surroundings 4.1.1 The application site is a cluster of farm buildings and associated hard standing area at Kirby Manor farm, which lies to the north of Ashwell, outside the settlement boundary and on the east side of Northfield Road. The site is within the Rural Area Beyond the Green Belt as per the Local Plan. 4.1.2 The site has two access points, a metal gate to the south and a northern access which open to the road. The site consists of 4 agricultural buildings. To the south-west is Kirby Manor Farmhouse, a two-storey dwelling in separate ownership, and to the west is the smaller Kirby Cottage on the other side of Highfield Road, which is owned by the applicant.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
25/02115/FP KIRKBY MANOR FARM, NORTHFIELD ROAD, ASHWELL, BALDOCK, HERTFORDSHIRE, SG7 5JQReport 13 pages DownloadRead as text
PDF
Kirby Manor Farm UpdateReport 4 pages Download
PDF
NHC Ecology responseReport 2 pages Download
PDF
Objection Letter 1Report 5 pages Withheld: personal details
PDF
Objection Letter 2Report 3 pages Withheld: personal details
PDF
Parish Council Objection LetterReport 2 pages Withheld: personal details
PDF
PlanReport 1 pages Download

At this meeting

Whole meeting

More from North Hertfordshire Planning Control Committee

All decisions
MeetingDecisionOutcome
1 Oct 2026 Apologies for absenceThere were no apologies for absence received. Decided Open
1 Oct 2026 Minutes - 3 september 2026That the Minutes of the meeting of the Committee held on 3 September 2026 be approved as a true record of the proceed... Approved Open
1 Oct 2026 Notification of other businessThere was no notification of other business. Decided Open
1 Oct 2026 Chair's announcements(1) The Chair advised that, in accordance with Council Policy, the meeting would be recorded. (2) The Chair drew atte... Decided Open
1 Oct 2026 Public participationThe Chair confirmed that the registered speakers were in attendance. Decided Open