25/01790/FP LAND KNOWN AS THE ORCHARD, SNAILSWELL LANE, ICKLEFORD, HERTFORDSHIRE, SG5 3TS

Approved Planning 3 papers

AI summaryNorth Hertfordshire Planning Control Committee grants permission for one self-build dwelling on land at Snailswell Lane, Ickleford, with added drainage and contamination conditions.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedSelf-build dwelling on Snailswell Lane, Ickleford
MoneyNot stated
What happens nextDevelopment must begin within 3 yearsPer standard condition from date of permission
Who it affectsSnailswell Lane site, IcklefordLand known as the Orchard, SG5 3TS

What was decided

Planning permission was granted for one self-build dwelling, with hard and soft landscaping, parking and a new vehicular crossover off Snailswell Lane. Report 5.1

The committee added two further conditions: a detailed surface water drainage scheme using SuDS, and a contamination reporting and remediation condition.

Officers' other conditions cover timing, plans, ecology, access, construction method, cycle storage, landscaping, materials, trees, levels and removal of permitted development rights. Report P3, P5, P6, P7, P8, P11, P23, P25, P28, P30, P34, P36, P37

Why

Officers recommended approval, and the report lists no alternative options. Report 5.1, P1

Conditions require SuDS drainage to address flood risk, with infiltration testing or controlled discharge to the watercourse south of Snailswell Lane.

Construction traffic, Public Right of Way safety, tree protection, biodiversity enhancements and materials are controlled to protect amenity, highway safety and character. Report P6, P7, P8, P11, P20, P34

What happens next

The applicant must submit and gain approval for detailed surface water drainage, Construction Method Statement, access details, landscaping, materials, levels, tree protection, ecological enhancements and cycle storage before building starts. Report P6, P8, P11, P25, P28, P34, P36, P23

The vehicular access must be bound for the first 3 metres, with surface water intercepted before the dwelling is first used. Report P21

Any contamination found during works must be reported, investigated and remediated before occupation, and a verification report submitted.

Options considered

  • Chosen: Grant planning permission with conditions (as recommended by officers, plus added drainage and contamination conditions). Officer recommendation accepted and committee added two conditions Report 5.1
  • Rejected: Alternative options. Report states none applicable Report P1

Implications

  • Environment and climate: Surface water drainage must use SuDS source control first; if infiltration is not viable, discharge is limited to greenfield runoff rate into the ordinary watercourse south of Snailswell Lane.
  • Legal: Contamination condition applies Part 2A of the Environmental Protection Act 1990 if any is found during works.
  • Other: Permitted development rights under Classes A, AA, B, C and E of Part 1, Schedule 2 of the GPDO 2015 are removed. Report P37
  • Other: Trees on the site are protected, with replacement planting required if any are lost. Report P30, P32, P34
  • Other: Construction must avoid school pick up and drop off times and keep the Public Right of Way clear. Report P17, P42

Who and where

  • The applicant for the self-build dwelling Report 5.1
  • Users of the Public Right of Way along Snailswell Lane Report P8, P10, P42
  • Hertfordshire County Council Highway Authority Report P11, P20, P42
  • Lead Local Flood Authority (consulted on drainage) Report 5.1
  • Neighbouring properties around Snailswell Lane, Ickleford Report P28, P36

Timeline

  • 2026-02-12: Planning Control Committee resolved to grant permission, with added Conditions 15 and 16
  • Before construction begins: Surface water drainage scheme, Construction Method Statement, access, landscaping, materials, levels, tree protection, ecological enhancement and cycle storage details must be submitted and approved in writing Report P6, P8, P11, P23, P25, P28, P34, P36
  • 3 years from the date of permission: The development must have begun Report P3
  • Before first use of the development: The vehicular access must be bound for the first 3 metres and surface water intercepted away from the highway Report P21

Plain English for the jargon

  • SuDS: Sustainable Drainage Systems, methods to manage surface water close to where it falls, slowing run-off and reducing flood risk.
  • AEP: Annual Exceedance Probability, the chance a flood event of a given size happens in any year, for example 1% AEP is a 1 in 100 year event.
  • GPDO: Town and Country Planning (General Permitted Development) Order 2015, which sets out works that can be done without a planning application.
  • Public Right of Way: A route the public can use on foot or other specified ways, maintained by the highway authority.
  • CLOCS: Construction Logistics and Community Safety, a standard for managing construction vehicle impacts, referenced in the Highway Authority's Construction Management template.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item127

Resolved

That application 25/01790/FP be GRANTED planning permission subject to the conditions set out in the report of the Development and Conservation Manager, with additional Conditions 15 and 16 as follows: ‘Condition 15 Construction shall not begin until a detailed surface water drainage scheme for the site has been submitted to and approved in writing by the Local Planning Authority. The surface water drainage scheme must prioritise the use of source control Sustainable Drainage Systems ( SuDS ) in consideration of the Non-Statutory Technical Standards for SuDS and demonstrate no increase in flood risk as a result of the Proposed Development with sufficient supporting evidence provided to support its viability including supporting calculations for the 100% AEP (1 in 1 year), 3.33% AEP (1 in 30 year), 3.33% AEP (1 in 30 year) plus climate change, the 1% AEP (1 in 100 year) and the 1% AEP (1 in 100) plus climate change critical storms. Infiltration testing shall be carried out to inform the detailed drainage design; if infiltration is not viable, a detailed drainage strategy based on discharging to the ordinary watercourse south of Snailswell Lane at the greenfield runoff rate shall be submitted to the Local Planning Authority. The scheme shall subsequently be implemented in accordance with the approved details before the development is completed. Reason: To ensure the flood risk is adequately addressed and not increased in accordance with NPPF and Policies of North Hertfordshire District Council. Condition 16 In the event that contamination is found at any time when carrying out the approved development, it shall be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment shall then be undertaken by a competent person, in accordance with BS10175:2011. A written report of the findings should be forwarded for approval to the Local Planning Authority. Following completion of remedial measures a verification report shall be prepared that demonstrates the effectiveness of the remediation carried out. No part of the development should be occupied until all remedial and validation works are approved in writing. Reason: To protect human health and to ensure that no future investigation is required under Part 2A of the Environmental Protection Act 1990.’
Word for word from the decision North Hertfordshire published for this meeting. Source: democracy.north-herts.gov.uk

Follow this further

Built from North Hertfordshire's papers

What the report saysPro

Report to Planning Control Committee, 16 pages

Location: Land Known As The Orchard Snailswell Lane Ickleford Hertfordshire SG5 3TS

Applicant: [name removed]: Erection of one self-build dwelling including hard and soft landscaping, parking and creation of vehicular crossover off Snailswell Lane

Ref. No: 25/01790/FP

Officer: Thomas Howe

Date of expiry of statutory period: 15 September 2025

Extension of statutory period: 27 November 2025

Reason for Delay: To overcome planning objections, and to find a suitable committee date.

Reason for Referral to Committee:

This application was called into planning control committee by Councillor Louise Peace on 13 August 2025. The reasons given are:

1. Impact on neighbour amenity and negative visual impact on the street scene. 2. Lack of safe and sustainable access. 3. Impact on ecology. 4. Flooding and foul drainage issues.

1.0Site History

1.1No previous history.

2.0Policies

2.1Decisions must be taken in accordance with the development plan unless there are material considerations that indicate otherwise (section 70(2) of the Town and Country Planning Act 1990 and section 38(6) of the Planning and Compulsory Purchase Act 2004). The National Planning Policy Framework represents up-to-date government planning policy and is a material consideration that must be taken into account where it is relevant to a planning application. If decision takers choose not to follow the National Planning Policy Framework, where it is a material consideration, clear and convincing reasons for doing so are needed.

2.2Section 38(5) of the Planning and Compulsory Purchase Act 2004 sets a hierarchy of development plan documents and material considerations such as the NPPF, in that where a conflict is identified, the conflict must be resolved in favour of the policy which is contained in the last document to be adopted, approved or published. 2.3 North Hertfordshire District Local Plan (The Local Plan) 2011 – 2031

Policy SP1: Sustainable Development in North Hertfordshire Policy SP2: Settlement Hierarchy and Spatial Distribution Policy SP5: Countryside and Green Belt Policy SP9: Design and Sustainability Policy HS3: Housing mix Policy D1: Sustainable Design Policy D3: Protecting living conditions Policy D4: Air quality Policy NE2: Landscape Policy NE4: Biodiversity and geological sites Policy NE7: Reducing flood risk Policy NE8: Sustainable drainage systems Policy NE10: Water conservation and wastewater infrastructure

2.4National Planning Policy Framework (NPPF) (December 2024)

Section 2: Achieving sustainable development Section 9: Promoting sustainable transport Section 11: Making effective use of land Section 12: Achieving well-designed places and beautiful places

2.5Vehicle Parking at New Development SPD

2.6Ickleford Neighbourhood Plan

Policy E2 – Protecting the Landscape Policy E3 - Rural Character Policy SD1 - Development within the settlement boundary Policy SD2 – New Housing Development Policy SD3 – High Quality Design Policy SD4 - Provision of Energy Efficient Buildings Policy SD5 - Water Management Policy MTT2 – Car Parking

3.0Representations

3.1Neighbour Consultation –

6x Objections:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
25/01790/FP LAND KNOWN AS THE ORCHARD, SNAILSWELL LANE, ICKLEFORD, HERTFORDSHIRE, SG5 3TSReport 16 pages DownloadRead as text
PDF
Committee Update: 25-01790-FPReport 1 pages Download
PDF
PlanReport 1 pages Download

At this meeting

Whole meeting

On this subject at North Hertfordshire

Search all
  1. 25/01790/FP LAND KNOWN AS THE ORCHARD, SNAILSWELL LANE, ICKLEFORD, HERTFORDSHIRE, SG5 3TSThis decision
  2. Sale of land at hitchin road, weston known as the snipe - part 1Approved

More from North Hertfordshire Planning Control Committee

All decisions
MeetingDecisionOutcome
1 Oct 2026 Apologies for absenceThere were no apologies for absence received. Decided Open
1 Oct 2026 Minutes - 3 september 2026That the Minutes of the meeting of the Committee held on 3 September 2026 be approved as a true record of the proceed... Approved Open
1 Oct 2026 Notification of other businessThere was no notification of other business. Decided Open
1 Oct 2026 Chair's announcements(1) The Chair advised that, in accordance with Council Policy, the meeting would be recorded. (2) The Chair drew atte... Decided Open
1 Oct 2026 Public participationThe Chair confirmed that the registered speakers were in attendance. Decided Open