Waste Management/Refuse Route Review

Approved Executive 1 paper

Executive Board approved this item on Tuesday 4 December 2012. Below is the council's own wording, with the papers it was decided on.

Item90

Resolved

Approved that in view of the changes that may arise from introducing charges for green waste collection and the unanimous view expressed by the waste collection team, the Council continues with the current temporary arrangements during 2013/14 with a view to introducing new additional routes from April 2014.
Word for word from the decision North Kesteven published for this meeting. Source: democracy.n-kesteven.gov.uk

Follow this further

Built from North Kesteven's papers

What the report saysPro

Report to Executive Board, 6 pages

Purpose of report

To consider options for the review of the residual and dry recycling waste routes for the period 2013 – 2017. ;

Top Level Summary

Refuse route review

The refuse routes were last reviewed in 2009 and the routes that were implemented were designed to be reviewed after 4 years. The current review, based on computer modelling, has taken into account

• Projected property growth until 2017; • Revised assumptions regarding compliance with Health and Safety at work requirements and safe systems of work; • Changes to disposal points due to the new contract for dry recycling and the introduction of the Energy from Waste Plant and Sleaford Waste Transfer Station from summer 2013.

1 - ROUTE REVIEW OPTIONS

When the refuse/recycling routes were last re-organised the exercise resulted in no increase in the number of routes, but led to a re-balancing of the workloads so that all routes were broadly equivalent in workload. The effect of the review was to delay an increase in round numbers that would otherwise have been required from 2009.

At the time the route review was undertaken, the data used to input into the computer model was based on the existing performance which was influenced by the ‘task and finish’ method of operation.

The continued growth of the district particularly in the northern part of the district led to pressure on certain routes with working days lasting well beyond 3.30pm. Officers realised that in order to prepare information upon which to design new routes from 2013 that would be resilient until March 2017 it was imperative that clean and true data was collected. Moreover the analysis needed to take into account the Safe System of Work for the service – in particular to ensure that such factors as vehicle speed limits, rest breaks etc were allowed for. During May this year data collection was undertaken on the routes to enable the most reliable data possible to be used in the modelling software. Since this time 3 additional vehicles and crews (one per waste stream) have been in operation as relief to the existing planned routes. Options Analysis

A wide range of options have been considered

a. Do nothing (i.e. revert to situation before temporary relief introduced); b. Continue with current temporary relief arrangements; c. 5 day working; d. 5 day working with overtime; e. 4 day working; f. 4 day working over 5 days; g. Double shift system.

The options have been appraised and this has resulted in 3 options remaining under active consideration:

Option 1 – Continue with the temporary arrangements currently in place

The relief arrangements that have been in place since the beginning of June were only designed as a temporary measure to alleviate pressures on the service until the route review was undertaken and implemented that will provide resilience until March 2017. The three relief vehicles provide collection capacity to each of the three waste streams recycling, residual and garden waste. By working this way the vehicles are not being used efficiently. However, this arrangement could continue during 2013/14 in order to gauge the implications of collecting green waste following the introduction of charging.

Benefits of Option 1 Dis-benefits of Option 1 Number of residents affected by alterations Vehicle routes not efficient as modelled in to collection schedules limited. option 2. Routes can be completed within normal The three relief vehicles (05 plates) will working hours. probably need to be replaced in 2012/2013. No contractual negotiations required to If the vehicles were not replaced and were implement. kept in service then their reliability will be questionable. There will also be an increase in the maintenance on these vehicles. Changes in waste infrastructure and property growth accounted for.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Waste Management/Refuse Route ReviewReport 6 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at North Kesteven

Search all
  1. Waste Management/Refuse Route ReviewThis decision
  2. Joint Municipal Waste Management Strategy for LincolnshireApproved
  3. Joint Municipal Waste Management Strategy for LincolnshireApproved
  4. Joint Waste Management Strategy ConsultationDecided
  5. Joint Waste Management Strategy ConsultationDecided
  6. Waste Management and Recycling SchemeApproved

More from North Kesteven Executive Board

All decisions
MeetingDecisionOutcome
3 Nov 2026 Proposed Private Hire and Hackney Carriage Fees and ChargesRecommended to Council: That approval be given to undertake a consultation process on the proposed draft licensing fe... Approved Open
3 Nov 2026 Review of The Private Sector Housing Enforcement PolicyThat the contents of the report and policy was noted. 2. That Executive Board approved the adoption of the new Privat... Noted Open
3 Nov 2026 NK Plan Quarter 2 Performance Report 2026/27That the key performance indicator progress in the NK Plan was approved. 2. That the Housing Regulatory Performance r... Approved Open
3 Nov 2026 Grantham Road Car ParkThat the appropriation of the part of the Grantham Road site shown on the plan at Appendix 1 from the Housing Revenue... Approved Open
3 Nov 2026 Medium Term Financial Strategy for 2027/28That the Medium Term Financial Strategy for 2027/28 to 2031/32 was approved. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies