Item485
Resolved
RESOLVED KEY DECISION That the Executive: a) Approved the proposed Capital Project to replace the double mobile classroom with permanent classrooms which will return an area of the playground back to the school. b) Noted the scheme will be funded by Basic Needs Grant funding. c) Delegated authority to the Executive Member for Children, Families and Education in consultation with Executive Director of Children’s Services, and the Executive Director of Place and Economy, to authorise all necessary legal, property and financial agreements to ensure effective delivery of the scheme. Reasons for Recommendations: · The current double classroom mobile on site has reached the end of its design life. · The Council has a statutory obligation to provide school buildings that are safe and fit for purpose and conducive to teaching and learning. If the Council cannot provide safe school buildings in its maintained provision in North Northants, then it could be subject to health and safety breaches. Alternative Options Considered: · Option 1: Replace the mobile with a similar sized building in the same location. This was dismissed as the loss of facilities during construction would present too many issues. · Option 2: Build a new block at the front of the school. There is space and the layout works except for one aspect. To gain access you must walk externally or through another Classroom 27 which is not ideal. Inserting a Corridor through Classroom 27 makes a room deficient in the required floor area. · Option 3: Construct a replacement at the top of the site on playground area and link back to the main building. The lost playground would be regained in the mobile location. This is the preferred option.
Word for word from the decision North Northamptonshire published for this meeting.
Source: northnorthants.moderngov.co.uk