Resolved
RESOLVED THAT: The application be permitted in accordance with the recommendation of the Director of Services.
Planning Committee decided this item on Tuesday 4 November 2014. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED THAT: The application be permitted in accordance with the recommendation of the Director of Services.
PLANNING APPLICATIONS- SECTION A
Erection of two no. 250Kw wind turbines and associated Report Item No infrastructure, including access track without complying with A8 condition 2 of permission 14/00133/FUL to allow to the installation of a different model of turbine
Land Off Farm Town Lane Farm Town Coleorton Application Reference 14/00669/VCU
Applicant: Date Registered Hallmark Power Ltd 18 July 2014
Case Officer: Target Decision Date Hannah Exley 12 September 2014
Recommendation: PERMIT
Site Location - Plan for indicative purposes only
Reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the controller of Her Majesty’s Stationery Office copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Licence LA 100019329)
Planning Committee 4 November 2014 Development Control Report PLANNING APPLICATIONS- SECTION A
EXECUTIVE SUMMARY OF PROPOSALS AND REASONS FOR APPROVAL:
Call In This application is reported to Members on the basis that a similar proposal was previously considered by Members at the 08 July 2014 meeting of the Planning Committee.
Proposal This is an application under Section 73 of the Town and Country Planning Act 1990 to vary condition 3 of planning permission 14/00133/FUL for the erection of two no.250Kw wind turbines and associated infrastructure, including access track which was approved on 08 July 2014. Section 73 relates to development of land without complying with conditions subject to which a previous planning permission was granted. The Council, in considering this application, is only entitled to consider the question of the conditions subject to which planning permission should be granted. Condition 2 attached to 14/00133/FUL which the applicant wishes to vary is listed below:
The proposed development shall be carried out strictly in accordance with the following schedule of plans, unless otherwise required by a condition of this permission:
- Site Location Plan (scale 1:5000), drawing number 250-00-1500 (Elevations for WTN 250 Tubular Tower 30m) and drawing number 329-50-000 (Foundation for WTN 329) which were deposited with the Local Planning Authority on 12 February 2014.
Reason - To determine the scope of this permission.
The key difference between the current and previously approved scheme is that an alternative model of turbine is now proposed. The turbine would have a hub height of 30.5m and an overall height of the turbines would be 45m which is 0.5m higher than the model considered under application 14/00133/FUL. The turbine remains a 3-blade model and the siting of the turbines would be as previously considered.
As with the previous application, an access track of permanent construction is also proposed to allow access for maintenance over a 20 year period. The track would begin at the highway (Farm Town Lane) utilising the existing gated access and upgrading an access track. Where the existing track ends, a new track would be created up to the turbines and would require the removal of a short section of existing hedgerow. The newly created access/upgraded track would be constructed of limestone hardcore that will be imported onto the site.
Consultation 11 representations from third parties have been received objecting to the application and objections have also been received from Ashby de la Zouch Town Council. All other statutory consultees have no objections.
Planning Policy The development would comply with all relevant policies of the Local Plan as well as Paragraphs 17, 98, 118, 119, 123, 131, 132, 134, 188, 189 and 215 of the NPPF; and the Habitats Regulations, Circular 06/05 (Biodiversity and Geological Conservation - Statutory Obligations and Their Impact Within the Planning System), River Mease Water Quality Management Plan - August 2011 and Planning for Renewable Energy: A Companion Guide to PPS 22.
Planning Committee 4 November 2014 Development Control Report PLANNING APPLICATIONS- SECTION A
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
14/00669/VCU: Erection of two no. 250Kw wind turbines and associated infrastructure, including access track without complying with condition 2 of permission 14/00133/FUL to allow to the installation of a different model of turbineMinutes | 94 KB | DownloadRead as text |
Follow Planning Committee at North West Leicestershire and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.