Resolved
RESOLVED to (1) note the monies available to Bridge, Clifton North and Clifton South wards as outlined at Appendix 1 and 2 to the report; (2) approve the Area Capital Fund Local Transport Plan and Public Realm schemes for Bridge, Clifton North and Clifton South as follows: Location Type Estimate (£) Details Meadows Way East Crossing 15,000 Contribution to crossing project Lamcote Grove Lining 200 Consultation to extend double-yellow lines Kelso Gardens Footpath 10,973 Full resurfacing Castleton Close Carriageway 8,758 Full resurfacing Royston Close Carriageway 8,386 Full resurfacing Meredith Close Carriageway 8,618 Full resurfacing Kirkby Gardens Carriageway 35,072 Full resurfacing Thrumpton Drive Footpath 28,268 Full resurfacing Old Meadows Footpaths Footpath Cut metal grilles to kerb line Queen’s Walk Community Centre Lighting 233 External light for walkway leading to car park Queen’s Walk Story Pole feature 2,000 Preparation, treatment and installation Old Meadows Street name plates Name plates 2,800 Re-painting 50 street name plates Uppingham Gardens Footpath 1,653 Remove concrete bollards, install knee-high rail and reflective bollards Robin Hood Way/Meadow Bank Footpath 806 Knee-high rail to prevent damage to verge Bathley Street/ Wilford Grove Notice 1,221 Community Notice Board Bridgeway Centre artwork painting 3,850 Paint metal artwork and fencing Bridgeway Centre Christmas Tree Power supply 3,500 Install power supply/foundation Bridgeway Centre shop fronts lighting 10,000 Lighting/ soffit improvements Uppingham Gardens, Robin Hood Way and Bathley Street/ Wilford Grove Safety Audit 250 Safety audit for 3 schemes Bridgeway Centre Tree Guards 3,902 Removal of 14 metal tree guards (3) to note a reserved footpath project at Beardsley Gardens for £20,305.