Resolved
RESOLVED THAT: The order of business be altered accordingly.
Development Control Committee decided this item on Thursday 25 October 2018. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED THAT: The order of business be altered accordingly.
Application Number Address
Report Items
a. 18/00258/FUL Ervins Lock Lock Keeper Close Wigston Leicestershire
b. 18/00260/FUL Land South Newton Lane Wigston Leicestershire
c. 18/00405/COU 17 - 19 The Parade Oadby Leicestershire LE2 5BB
Development Control Committee Meeting 25 October 2018 a. 18/00258/FUL Ervins Lock Lock Keeper Close Wigston Leicestershire 6 June 2018 Construction of a steel footbridge spanning Ervin's Lock (Grand Union Canal) to provide access from the northern residential area to the canal towpath Case Officer [name removed]
© Crown copyright. All rights reserved Oadby & Wigston Borough Council LA100023293 Published 2014
Development Control Committee Meeting 25 October 2018 Site and Location
The site comprises a short section of the Grand Union Canal towpath at the location of Ervins Lock. Access is along the existing grassed/open space area off Pochins Bridge Road via a gate. The site is located within the Grand Union Canal Conservation Area, designated by Leicestershire County Council.
To the south-west of the Grand Union Canal is the canal towpath, a public footpath. Beyond this the land consists of farmland cut by the River Sence. To the north-east are residential properties, immediately north is a SuDS area (detention basin) bordered by hedgerows along the residential roads and gardens.
Description of proposal
The application proposes a footbridge to allow residents of the Lansdowne Grove Estate access to the Grand Union Canal towpath.
The footbridge will comprise a single main span of approx. 15m length with a minimum clearance of 2.66m over the canal (2.75m in the centre of the canal). The ramp on the north-eastern side of the canal will be approx. 9.7m long and the ramp on the south- western side will be 12.7m long. The canal towpath is to be diverted around the south western ramp. The approach paths, bridge ramps and main span are 1.5m wide.
The bridge span and ramps will be of steel construction with black and white vertical railings 1.2m high as well as cross braces to mimic traditional canal bridge design. The abutments are to be faced in brick to resemble the lock. The structure will be supported on concrete pad foundations beneath the abutments as well as towards the base of each ramp.
The bridge, ramps and new sections of path will be surfaced in natural materials in keeping with the character of the conservation area.
The proposal requires the removal of six young ash trees.
The statutory determination period for this application expired on the 5 September 2018 and it is intended to issue a decision as soon as practicably possible after the Committee meeting.
Relevant Planning History
None Relevant
Consultations
Leicestershire County Council (Heritage Team) - I have previously questioned the desirability of providing a new pedestrian crossing in this location because it will encourage public access close to a deep water lock and intrude into the established setting of an important historic feature that contributes positively to a designated conservation area.
The appearance of the new bridge and ramps has however been adjusted slightly to acknowledge its canal side location. It is recommend that precise details of the proposed brickwork and metal work, including railings and handrails profile and width, and their
Development Control Committee Meeting 25 October 2018 method of construction and fixing be submitted for approval because these could have a considerable bearing on the final appearance of the new crossing.
Whilst I remain concerned that the new bridge and associated ramps, are unlikely to preserve or enhance the Grand Union Canal Conservation Area it is recognised that the development will generate demonstrable public benefits that could include better public access and appreciation of the historic waterway.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Report of the Planning Control Team LeaderReport | 432 KB | DownloadRead as text |
Follow Development Control Committee at Oadby and Wigston and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 28 May 2026 | Minutes of the Previous MeetingRESOLVED THAT: The minutes of the previous meeting held on 30 April 2026 be taken as read, confirmed and approved. | Approved | Open |
| 28 May 2026 | 13 Hillway, Oadby, Leicester, LE2 5YG (Ref. No. 26/00058/FUL)RESOLVED THAT: The application be PERMITTED planning permission in accordance with the submitted documents and plans ... | Decided | Open |
| 30 Apr 2026 | Minutes of the Previous MeetingRESOLVED THAT: The minutes of the previous meeting held on 26 February 2026 be taken as read, confirmed and approved. | Approved | Open |
| 30 Apr 2026 | Former Oadby Swimming Pool, Leicester Road, Oadby, Leicestershire, LE2 4DF (Ref. No. 23/00485/FUL)RESOLVED THAT: The order of business be altered accordingly. The Committee gave consideration to the report and appen... | Approved | Open |
| 30 Apr 2026 | Planning Appeals Annual Review (2025/26)RESOLVED THAT: The content of the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.