What was decided
The Director of Environment is asked not to approve the proposed Haven Lane traffic calming restrictions, and the 20mph zone is to be extended instead.
The Committee noted that an objector and a ward member attended and addressed members during the meeting.
Why
Thirteen formal objections were received during advertisement, and a further 71 properties backed those objections in a door to door survey by the Moorside East Residents Association. Report P3
The local ward members consulted do not support the proposed traffic calming measures. Report 5.1
Objectors raised concerns on safety, noise, drainage, vehicle damage, property damage, parking, refuse and emergency vehicle access, environment, cost and the need for the scheme itself. Report P6
What happens next
The Director of Environment is asked not to approve the proposed restrictions and to extend the 20mph zone on Haven Lane.
The £35,767 commuted sum must still be used for a traffic calming scheme, but there is no legal timescale for spending it. Report 7.1
Implementation of the previously approved traffic calming scheme is still required under planning permission VAR/353326/24, so a revised approach will need to be worked through. Report P2, 7.1
The money
- £35,767 Section 106 commuted sum from the developer, received January 2024 Report P1, 7.1
- circa £51k Total cost of the previously approved traffic calming works in the delegated decision report Report P103
- 50,632 Sum of the cost breakdown in the delegated decision report Report P104
- £38k Section 106 developer contribution under reference DB475 Report P104
- £13k Contribution from the Highways Minor Works Budget (M0314) Report P104
- £36,132 Main works element of the proposed scheme Report P104
- £11,500 Design and supervision element of the proposed scheme Report P104
- 2,000 Advertising of Order cost in the proposed scheme Report P104
- 1,000 Consultation cost in the proposed scheme Report P104
Options considered
- Rejected: Option 1: Introduce the proposed restrictions as advertised. Committee instead chose to reject the proposals and extend the 20mph zone Report 3.1
- Rejected: Option 2: Relax the proposal and introduce speed cushions instead of a junction plateau at the junction with Rushton Grove. This was the officer preferred option, but the Committee did not support it Report 3.1, 4.1
- Chosen: Option 3: Do not introduce the proposed restrictions. Committee resolved not to approve the restrictions, with the addition that the 20mph zone be extended Report 3.1
Implications
- Legal: The Council is required to use the £35,767 commuted sum for a traffic calming scheme, but there is no timescale within which the money must be spent. Report 7.1
- Legal: Implementation of the proposed restrictions is still required by planning permission VAR/353326/24, so a revised scheme may be needed to satisfy that condition. Report P2, 7.1
- Financial: The previously approved scheme was to cost circa £51k, funded by £38k Section 106 and £13k from the Highways Minor Works Budget; not approving the scheme leaves the commuted sum unused and may require a new funding plan. Report P103, P104
- Equalities: Officers concluded there is no equality impact from the original proposals; no separate assessment of the Committee's alternative of simply extending the 20mph zone is recorded. Report 8.1, P69
- Other: Community cohesion, risk, co-operative and procurement implications were reported as none or as already dealt with in the previous report. Report 1.2, P52, 1.3, P54, 1.4, P56, 1.5, P58
Who and where
- Residents and road users of Haven Lane, Moorside Report P3
- Residents of Rushton Grove, concerned about the proposed raised junction table Report P175, P185, P206
- Residents of Haugh Hill Road, affected by the proposed junction realignment and parking pressures Report P15, P190
- Occupiers of 5 to 7 Parkgate, Haven Lane, whose property is closest to the proposed 4.7m speed hump Report P206, P232
- The Moorside East Residents Association, whose door to door survey gathered 71 supporting responses Report P3
- Ward members for the St James' ward, who were consulted and do not support the proposals Report 5.1, P84
- The developer of the Cube Homes site on Haven Lane, whose planning obligations are linked to the scheme Report P1, P2, P44
Timeline
- 2016 (planning application PA/338917/16): Original planning permission issued on appeal, with condition 17 requiring traffic calming on Haven Lane Report P1
- January 2024: Council received the £35,767 Section 106 commuted sum from the developer Report P1
- October 2024 (VAR/353326/24): Variation of condition 17 requiring the traffic calming scheme to be implemented within 12 months Report P2
- 29 July 2025: Delegated decision by the Director of Environment and Cabinet Member supporting the proposed scheme Report P82
- 23 July 2026: Highway Regulation Committee considered objections and resolved not to approve the restrictions, asking instead for the 20mph zone to be extended
Plain English for the jargon
- Section 106 (S106) agreement: A legal agreement between a developer and the local planning authority used to secure contributions towards infrastructure or services linked to a development.
- Commuted sum: A one off payment made by a developer, usually towards the cost of future maintenance or provision of infrastructure.
- Speed cushion: A short raised section of road, narrower than a full width hump, designed to slow cars while allowing wider vehicles such as buses and emergency vehicles to straddle it.
- Speed hump (road hump): A raised section across the full width of the road, designed to slow traffic.
- Raised junction table (junction plateau): A raised area covering a whole junction, intended to slow vehicles entering or leaving the junction.
- 20mph zone: An area where the speed limit is set at 20 miles per hour, often supported by traffic calming features and signs.