26/00555/FUL - Land to the South of Tamerton Road, Woolwell, Plymouth, PL6 7BQ
DeferredPlanning1 paper
AI summaryPlymouth Planning Committee defers Woolwell battery storage application to a future meeting to include safety measures, against officer recommendation to grant.
Written from the decision and the officer reportPDF Pro
OutcomeDeferredVote 7 for, 3 against, 1 abstained
MoneyNot stated
What happens nextReturn to future meetingTo include safety measures
Who it affectsResidents near Tamerton RoadAnd applicant for battery storage facility
What was decided
The committee voted to defer the application to a future meeting so that safety measures could be included, rather than grant conditional approval as officers had recommended. Report P55
The motion to defer was proposed by one councillor and seconded by another, and passed with seven in favour, three against and one abstention.
The planning officer had recommended granting the application conditionally, with the applicant described as willing to prepare an emergency response plan. Report P8, P47, P55
Why
An objector spoke to the committee raising fire and toxic fume concerns about the battery storage installation in proximity to housing and traffic. Report P19
Officers concluded that the principle of flexible battery storage to support renewable energy use was acceptable, and that fire safety concerns raised by the National Fire Chiefs Council and an objector had been adequately addressed through the applicant's Fire Safety Explainer document and proposed conditions. Report P27, P45, P46, P47
Designing Out Crime officers had raised queries about vehicle impact, CCTV, cabinet security and fire risk, which the applicant addressed with setback distance, construction standards, remote monitoring and an automatic shutdown if cabinet doors are opened. Report P14, P30, P31
What happens next
The application will be brought back to a future Planning Committee meeting with additional safety measures included.
If approved later, the applicant would need a Section 50 permit from the Highway Authority to work in the public highway, and must submit a Battery Safety Management Plan, including an Emergency Response Plan, before the facility is brought into use. Report P68, P70, P77
Options considered
Rejected: Grant conditionally, as recommended by the planning officer. Committee chose instead to defer so safety measures could be added Report P8, P55
Chosen: Defer the application to a future meeting to include safety measures. Proposed by one councillor and seconded by another to address fire and safety concerns raised at the meeting
Implications
Risk: Fire and toxic fume risk to nearby housing was the main concern; officers accepted the applicant's Lithium Iron Phosphate technology, IP55 fire-rated cabinet, UL9540A testing and controlled-burn firefighting approach, and a Battery Safety Management Plan condition is proposed. Report P19, P43, P46, P47, P68
Climate: The scheme would store excess renewable electricity and reduce reliance on fossil fuel generation, supporting the transition to net zero and policy DEV33 of the Joint Local Plan. Report P26, 8.9, P27
Legal: The applicant is a statutory undertaker for generation activities but is not using statutory rights here and will apply for a Section 50 permit under the New Roads and Street Works Act 1991; the development is exempt from Community Infrastructure Levy. Report P50, P73
Equalities: The application has been assessed under Section 149 of the Equality Act and is not considered to cause discrimination on grounds of gender, race or disability. Report P52
Who and where
Residents of Lady Fern Road and nearby houses in Woolwell Report P9, P19
The applicant, proposing a 200kW (800kWhr) Energy Storage System on a grass verge Report P5, P10
Designing Out Crime officers, who raised security queries Report P14, P30
Devon and Somerset Fire and Rescue Service, to be consulted on the Emergency Response Plan Report P68, P70
South West Water, whose underground main prompted relocation of the structure Report P16, P39
Pedestrians and road users on Tamerton Road near Belliver Way junction Report P9
BESS / ESS: Battery Energy Storage System: stores electricity from the grid when demand is low and exports it when demand is high.
LFP: Lithium Iron Phosphate: a battery chemistry described by the applicant as having high thermal stability for stationary storage.
UL9540A: A test standard used to show that a battery unit limits fire spread between cells, modules and enclosures.
BSMP: Battery Safety Management Plan: a condition requiring an Emergency Response Plan before the facility is used.
JLP: Plymouth and South West Devon Joint Local Plan 2014 to 2034, the development plan for Plymouth, South Hams and West Devon.
DEV33: Joint Local Plan policy on renewable and low carbon energy, supporting battery storage in principle.
Section 50 permit: Approval under the New Roads and Street Works Act 1991 needed to work in the public highway.
CIL: Community Infrastructure Levy; the development is assessed as not liable.
AMS / RPA: Arboricultural Method Statement and Root Protection Area: documents setting out how works near trees will be managed.
BNG: Biodiversity Net Gain; the development is below the de minimis threshold and is exempt from the 10% requirement.
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item103
Resolved
Application Deferred. Jon Fox (Planning Officer) presented the Report. Lynne Ahern spoke to the application as an objector. Councillor McCarty proposed a motion to defer the application to a future meeting to include safety measures. This was seconded by Cllr Ms Watkin. The motion was passed: For (7) Councillors: [name removed], McLay, Dingle, Goslin, McCarty, Penrose, Simpson. Against (3) Councillors Freeman, Rielly, Tyler. Abstained (1) Councillor Stickland, Absent / Did Not Vote (0)
Word for word from the decision Plymouth published for this meeting.Source: democracy.plymouth.gov.uk
Land To The South Of Tamerton Road Woolwell Plymouth PL6 Site Address 7BQ
Proposal Construction of micro energy storage project Applicant [name removed] Type Full Application
Committee Target Date 18.06.2026 30.07.2026 Date
Extended Target Date 07.08.2026
Decision Category Councillor Referral Case Officer [name removed] Grant Conditionally This application has been referred to Planning Committee by Cllr Ney
1. Description of Site The site comprises a grass verge on the southern side of Tamerton Road, approximately 40 metres south-east of its junction with Belliver Way. The back edge of the verge merges into a line off shrubs that in turn are backed by a broad belt of semi-mature trees, which stretches south- eastwards to Lady Fern Road. The nearest houses to the site are approximately 80 metres south, in Lady Fern Road, which are part of a relatively recent estate, and approximately 38metres south- west, where there is a large, older detached house served by a driveway just short of the Belliver Way junction. There is a large factory and associated parking directly opposite on the northern side of the road.
2. Proposal Description The proposal is for the construction of a micro energy storage project, to provide a 200kW (800kWhr) Energy Storage System (ESS) (known as a 'Battery Box'). The installation comprises four battery storage cabinets contained within a timber and mesh fence approximately 2.4 metres tall. The compound is 2.705 metres wide by seven metres long (including an external grid interface cabinet and narrow section of concrete slab).
The submitted planning statement describes a Battery Box as an ESS that imports electricity from the local electricity network when demand for electricity is low or when there are high levels of renewable energy available. It then exports that electricity back to the grid when required during periods of high demand. This provides a solution to the growing need for network flexibility and helps address grid reliability issues prompted by an increase of intermittent (wind and solar) generation of the electricity system.
3. Pre-application Enquiry None.
4. Relevant Planning History None.
5. Consultation Responses Designing Out Crime - raises certain queries and concerns regarding the security of the installation.
Local Highway Authority - no objection.
South West Water - the structure was too close to the SWW water main and has been relocated to avoid SWW apparatus.
Environmental Health - no objection.
Lead Local Flood Authority - no objection.
6. Representations An objection has been received, on the grounds that the batteries used in the battery box could catch fire and release toxic fumes, which is hazardous in this area due to the proximity of residential property and traffic.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.