Goldsmith Avenue Cycle Lane

Deferred Committee 1 paper

Traffic & Transportation deferred this item on Thursday 10 March 2016. Below is the council's own wording, with the papers it was decided on.

Item16

Resolved

A decision on this item was deferred until the Traffic & Transportation meeting on 24 March 2016.
Word for word from the decision Portsmouth published for this meeting. Source: democracy.portsmouth.gov.uk

Follow this further

Built from Portsmouth's papers

What the report saysPro

Report to Traffic & Transportation

Purpose of report

1.1To seek approval to undertake consultation via Traffic Regulation Order on the implementation of a designated cycle lane on Goldsmith Avenue.

Recommendations

2.1Approval is given to undertake a consultation via a Traffic Regulation Order on the implementation of double yellow lines on the north side of Goldsmith Avenue, adjacent to the railway line opposite Francis Avenue to the pedestrian crossing west of Fratton Way. This will include removing the loading bays and the current unrestricted parking to facilitate the introduction of a mandatory eastbound cycle lane.

Background

3.1Portsmouth experiences high levels of cycle road casualties with over 80% of those collisions occurring on main 30mph roads such as Goldsmith Avenue.

3.2Provision of continuous, dedicated cycle facilities may assist to improve cycle safety within the area. The addition of cycle lanes and associated signage and road markings on the carriageway can highlight to motorists the need to anticipate cyclists travelling within the shared road space.

3.3By removing the existing parking along the carriageway the available road width is increased to allow room for both cyclists and other vehicles to utilise. This will improve visibility within the area, increasing the awareness of motorists, cyclists and pedestrians.

3.4Portsmouth is a flat and compact city and these areas are within 2-3 miles of each other. Therefore, it is ideally suited to encouraging walking and cycling for short journeys. However, if we are to encourage the use of the Western Active 1 www.portsmouth.gov.uk Travel Corridor and Eastern Active Travel Corridor (WATC & EATC) to access the city centre, there are some important missing links that need to be addressed. The improvement and promotion of the WATC & EATC and its connections to the centre will improve accessibility, reduce the pressure on the road network and reduce carbon outputs by enabling and facilitating the use of more sustainable modes of transport to both access the centre and move between the Town Centre, Gunwharf Quay and Southsea. This cycle lane will contribute directly to the adopted aims set out above by improving east to West accessibility for cyclists.

3.5As part of the proposed Tesco Development within Fratton Way, the Highways Engineer considered the scope to which a package of off-site highway and transport improvements could mitigate the impacts of the development. These included the provision of on road cycle lanes from Fratton Way to link with the existing facilities to the west on Goldsmith Avenue in the vicinity of Talbot Road and the provision of off road cycleway across site frontage to link with Toucan crossing to south on Fratton Way.

3.6Goldsmith Avenue is a classified road which experiences large volumes of traffic. During the five year period 1st November 2010 to 31st October 2015 there have been a total of 14 cycle collisions (1 serious injury) along this identified section of Goldsmith Avenue.

Reasons for recommendations

4.1In 2015 a large Tesco superstore was constructed in Fratton Way (off Goldsmith Avenue). During the planning process, concerns were raised (regarding the safety of cyclists, due to the potential increase in traffic that the new store will bring. As part of the section 106 agreement with Tesco, funding has been identified to fund the installation of the cycle lane.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Goldsmith Avenue Cycle LaneReport 116 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

5 of 5 attended
KE
Councillor Ken EllcomeCabinet Member, apologies, sent representative
LS
Councillor Lynne StaggOpposition spokesperson, present
SP
Councillor Stuart PotterOpposition spokesperson, present
YC
Councillor Yahiya ChowdhuryOpposition spokesperson, present
LS
Councillor Linda SymesCabinet Member, present as substitute

On this subject at Portsmouth

Search all
  1. Goldsmith Avenue Cycle LaneThis decision
  2. Proposed Amendment to Parking Restrictions - Priory Crescent and Goldsmith Avenue (PO32A-24)Approved
  3. Licensing Act 2003 - Application for the grant of a premises licence - Shell Fratton, Goldsmith Avenue, Southsea, PO4 8BHAgreed
  4. Goldsmith Avenue Cycle Lane (TRO 11/2016)Approved
  5. Goldsmith Avenue Cycle PathApproved
  6. 15/00572/HOU - 53 Goldsmith Avenue, Southsea PO4 8DU - installation of dropped kerb (re-submission of 14/01015/HOU)Refused

More from Portsmouth Traffic & Transportation

All decisions
MeetingDecisionOutcome
23 Mar 2023 Local Transport Plan 4 - Implementation Plan 2022 to 2025 - Year 2 annual reviewDecision The Cabinet Member: Approved and adopted the Local Transport Plan (LTP4) funded schemes 2023/24 as part of P... Approved Open
23 Mar 2023 Tertiary Roads Inspection and RepairDecision The Cabinet Member: 1. Approved that the plans and timings of inspections of the tertiary road network are s... Approved Open
23 Mar 2023 Active Travel Improvements - TRO 206/2022 Isambard Brunel RoadDecision The Cabinet Member: 1. Approved the implementation of TRO 206/2022 for the introduction of the bus, taxi and... Approved Open
23 Mar 2023 TRO 24/2023 - Walmer Road, Renny Road and Proctor Lane - one way except cyclesDecision The Cabinet Member: 1. Approved the implementation of TRO 24/2023, to implement a series of one-way streets ... Approved Open
23 Mar 2023 St Jude's School Streets permanent infrastructureDecision The Cabinet Member: 1. Approved creating a School Street via the installation of resident only access signs ... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies