Resolved
DECISION: To retain the lining changes and make permanent Experimental Traffic Regulation Order 33.
Traffic & Transportation decided this item on Thursday 24 November 2016. Below is the council's own wording, with the papers it was decided on.
Resolved
DECISION: To retain the lining changes and make permanent Experimental Traffic Regulation Order 33.
1.1To consider the experimental traffic scheme (Experimental Traffic Regulation Order 33/2015) which removed a section of Bus Lane between Havisham Road and Church Street at Mile End Road.
2.1To retain the lining changes and make permanent Experimental Traffic Regulation Order 33.
3.1A decision was made at Traffic & Transportation Committee in March 2015 to suspend the restrictions on the Mile End Road approach bus lane between Havisham Road and Church Street for a minimum 6 month period through an experimental traffic regulation order (ETRO) and also to shorten the southern end of the bus lane in Mile End Road approach between Havisham Road and Church Road by approximately 20 metres, plus 20 metres lining from the northern end of the bus lane be remove
3.2The decision also included a requirement to monitor the impact of the experimental traffic regulation order, including journey times, accident statistics and usage by cyclists.
3.3The Experimental Order (ETRO 33) was made in May 2015, coming into effect on 1 June 2015, with the final works completed in October 2015.
4. Results of Experimental Traffic Order
4.1The final layout has been in operation since October 2015, and in order to make a reasoned appraisal of the operation of the Experimental Order, manual count surveys 1 www.portsmouth.gov.uk have been commissioned with journey time data having been collected prior to implementation and during the experimental period. Local bus operators have also been consulted on their experience using Mile End Road since the section of bus lane was removed.
4.2The experimental order was subject to an initial 6 month consultation period from the making of the order on 1 June 2015. One representation was received on behalf of the Portsmouth Cycle Forum commenting on the proposal because of their concerns for the safety of cyclists (the full representation is included at appendix A).
4.3Journey times have been monitored between M275 Jct 1 and Park Road. A full week has been selected from May 2015 and May 2016 to provide a comparison of journey times. A comparison of weekday AM & PM peaks has been undertaken across the sample weeks to determine average journey times. Fig.1 below shows the recorded times.
11-15 May 2015 9-13 May 2016 Weekday AM Peak 7m 41s 6m 46s 08:00-09:00 Weekday PM Peak 7m 8s 7m 23s 17:00-18:00 Fig 1: Journey Times between M275 Jct 1 and Park Road
4.4The results show that the AM peak times have decreased between May 2015 and May 2016. The times during the PM Peak have increased slightly in the same period.
4.5Traffic volume data for vehicles using the M275 has also been gathered for May 2015 and May 2016. The peak hours for journey times in mid-week were 8-9am and 5-6pm, the volumes for these times are shown below on Fig .2.
11-15 May 2015 9-13 May 2016 Difference AM flow @ 08:00-09:00 3458 3354 -3% PM flow @ 17:00-18:00 3679 3618 -1.7% Fig 2: M275 SB Traffic volumes
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Experimental Traffic Regulation Order 33: Bus Lane between Havisham Road and Church Street (Mile End Road)Report | 431 KB | DownloadRead as text |
Follow Traffic & Transportation at Portsmouth and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 23 Mar 2023 | Local Transport Plan 4 - Implementation Plan 2022 to 2025 - Year 2 annual reviewDecision The Cabinet Member: Approved and adopted the Local Transport Plan (LTP4) funded schemes 2023/24 as part of P... | Approved | Open |
| 23 Mar 2023 | Tertiary Roads Inspection and RepairDecision The Cabinet Member: 1. Approved that the plans and timings of inspections of the tertiary road network are s... | Approved | Open |
| 23 Mar 2023 | Active Travel Improvements - TRO 206/2022 Isambard Brunel RoadDecision The Cabinet Member: 1. Approved the implementation of TRO 206/2022 for the introduction of the bus, taxi and... | Approved | Open |
| 23 Mar 2023 | TRO 24/2023 - Walmer Road, Renny Road and Proctor Lane - one way except cyclesDecision The Cabinet Member: 1. Approved the implementation of TRO 24/2023, to implement a series of one-way streets ... | Approved | Open |
| 23 Mar 2023 | St Jude's School Streets permanent infrastructureDecision The Cabinet Member: 1. Approved creating a School Street via the installation of resident only access signs ... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.